The Legislature of the State of New Jersey has delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the Township Committee of the Township of East Amwell, County of Hunterdon, State of New Jersey does ordain the following chapter.
A. 
The flood hazard areas of the Township of East Amwell are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
B. 
These flood losses are caused by the cumulative effect of obstructions in areas of special flood hazards which increase flood heights and velocities, and when inadequately anchored, damage uses in other areas. Uses that are inadequately floodproofed, elevated or otherwise protected from flood damage also contribute to the flood loss.
It is the purpose of this chapter to promote the public health, safety, and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed:
A. 
To protect human life and health;
B. 
To minimize expenditure of public money for costly flood control projects;
C. 
To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
D. 
To minimize prolonged business interruptions;
E. 
To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in areas of special flood hazard;
F. 
To help maintain a stable tax base by providing for the second use and development of areas of special flood hazard so as to minimize future flood blight areas;
G. 
To ensure that potential buyers are notified that property is in an area of special flood hazard;
H. 
To ensure that those who occupy the areas of special flood hazard assume responsibility for their actions.
In order to accomplish its purposes, this chapter includes methods and provisions for:
A. 
Restricting or prohibiting uses which are dangerous to health, safety, and property due to water or erosion hazards or which result in damaging increases in erosion or in flood heights or velocities;
B. 
Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;
C. 
Controlling the alteration of natural floodplains, stream channels and natural protective barriers which help accommodate or channel floodwaters;
D. 
Controlling filling, grading, dredging, and other development which may increase flood damage; and
E. 
Preventing or regulating the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards in other areas.
Unless specifically defined below, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter its most reasonable application.
APPEAL
A request for a review of the Planning Board's interpretation of any provision of this chapter or a request for a variance.
AREA OF SHALLOW FLOODING
A designated AO Zone on the Flood Insurance Rate Map (FIRM). The base flood depths range from one to three feet; a clearly defined channel does not exist; the path of flooding is unpredictable and indeterminate; and velocity flow may be evident.
AREA OF SPECIAL FLOOD HAZARD
The land in the floodplain within a community subject to a one-percent or greater chance of flooding in any given year.
BASE FLOOD
The flood having a one-percent chance of being equaled or exceeded in any given year.
BASEMENT
Any area of the building having its floor subgrade (below ground level) on all sides.
BREAKAWAY WALL
A wall that is not a part of the structural support of the building and is intended through its construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or supporting foundation system.
DEVELOPMENT
Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations located within the area of special flood hazard.
ELEVATED BUILDING
A non-basement building built in the case of a building in an area of special flood hazard to have the top of the elevated floor or in the case of a building in a coastal high-hazard area to have the bottom of the lowest horizontal structural member of the elevated floor elevated above the ground level by means of piling, columns (posts and piers), or shear walls parallel to the flow of the water and adequately anchored so as not to impair the structural integrity of the building during a flood of up to the magnitude of the base flood. In an area of special flood hazard, elevated building also includes a building elevated by means of fill or solid foundation perimeter walls with openings sufficient to facilitate the unimpeded movement of floodwaters. In areas of coastal high-hazard, elevated building also includes a building otherwise meeting the definition of "elevated building" even though the lower area is enclosed by means of breakaway walls.
FLOOD or FLOODING
A general and temporary condition of partial or complete inundation of normally dry land areas from:
A. 
The overflow of inland or tidal waters; and/or
B. 
The unusual and rapid accumulation or runoff of surface waters from any source.
FLOOD INSURANCE RATE MAP (FIRM)
The official map on which the Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community.
FLOOD INSURANCE STUDY
The official report provided in which the Federal Insurance Administration has provided flood profiles, as well as the Flood Boundary - Floodway Map and the water surface elevation of the base flood.
FLOODWAY
The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than .02 foot.
LOWEST FLOOR
The lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for the parking of vehicles, building access or storage in an area other than a basement is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other applicable nonelevation design requirements.
MANUFACTURED HOME
A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes the term "manufactured home" also includes park trailers, travel trailers and other similar vehicles placed on a site for greater than 180 consecutive days. For insurance purposes, the term "manufactured home" does not include park trailers, travel trailers and other similar vehicles.
MANUFACTURED HOME PARK or MANUFACTURED HOME SUBDIVISION
A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
NEW CONSTRUCTION
Structures for which the "start of construction" commenced on or after the effective date of this chapter.
START OF CONSTRUCTION
For other than new construction or substantial improvements under the Coastal Barrier Resources Act (P.L. 97-348), includes substantial improvement and means the date the building permit was issued, provided that the actual start of construction, repair, reconstruction, placement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site such as the pouring of a slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure.
STRUCTURE
A walled and roofed building, a manufactured home, or a gas or liquid storage tank, that is principally aboveground.
SUBSTANTIAL IMPROVEMENT
Any repair, reconstruction, or improvement of a structure, the cost of which equals or exceeds 50% of the market value of the structure either before the improvement or repair is started or, if the structure has been damaged and is being restored, before the damage occurred. For the purposes of this definition, substantial improvement is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether on not that alteration affects the external dimensions of the structure. The term does not, however, include either:
A. 
Any project for improvement of a structure to comply with existing state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions; or
B. 
Any alteration of a structure listed on the National Register of Historic Places or a State Inventory of Historic Places.
VARIANCE
A grant of relief from the requirements of this chapter which permits construction in a manner that would otherwise be prohibited by this chapter.