Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Franklin, NJ
Hunterdon County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
A surface water management plan shall be approved by the Land Use Board of this Township prior to preliminary site plan approval, conditional use, special exception, zoning variance (if required by the Land Use Board), issuance of building permit for a dwelling or major building only, preliminary subdivision approval or any other land disturbance activity, as the case may be.
No person shall engage in any land disturbance activity on any property within the Township without having submitted a surface water runoff management plan, together with erosion and sediment control plans, to the Land Use Board and obtaining approval of such plan and a permit or written waiver of necessity from the Land Use Board. Where a use variance is involved and the Township Zoning Board of Adjustment is also handling site plan or subdivision applications in connection with the same application, the Board of Adjustment shall have jurisdiction under this chapter in the same manner as the Land Use Board.
The Land Use Board may waive the need for a surface water management plan upon written recommendation from the Township Environmental Commission certifying that there is no appreciable increase anticipated in the rate or velocity of runoff based upon plans submitted.
The following are exempt from the provisions of this chapter:
A. 
Site plans for development where the vegetative cover of the land will not be disturbed.
B. 
Outdoor (not undercover) agricultural use of lands when operated in accordance with accepted farm conservation policies, including barns, sheds, silos, grain storage, utility, machinery, watering and stock-handling buildings when accessory to this use.
[Amended 9-10-1982 by Ord. No. 82-6]
A. 
The surface water management plan or any major amendment shall be approved by the Land Use Board in the manner and form and according to the regulations hereafter set forth.
B. 
The Land Use Board, in approving said surface water management plan, may impose lawful conditions or requirements designated or specified on or in connection therewith. These conditions and requirements shall be provided and maintained as a condition to the establishment, maintenance and continuance of any use or occupancy of any structure or land.
Minor amendments to a surface water management plan may be approved by the Township Engineer, who shall notify the Land Use Board of the nature and reason for the change.
If at any time the Township Engineer finds existing conditions not as stated in the applicant's approved plan, the Land Use Board or its designated agent shall order cessation of all work and seek to enjoin the violation or take such steps looking to the enforcement of the plan as may be lawful.