Township of West Goshen, PA
Chester County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Board of Supervisors of the Township of West Goshen 11-13-2013 by Ord. No. 12-2013.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch. 28.
Soil erosion and sediment control — See Ch. 69.
Subdivision of land — See Ch. 72.
Zoning — See Ch. 84.
Attachment 1 - Appendix A Attachment 2 - Appendix B Attachment 3 - Appendix C Attachment 4 - Appendix D Attachment 5 - Appendix E Attachment 6 - Stormwater Map
[1]
Editor's Note: This ordinance also repealed former Ch. 71, Stormwater Management, adopted 11-12-2003 by Ord. No. 11-2003, as amended.
Article I General Provisions

§ 71-1 Short title.

§ 71-2 Statement of findings.

§ 71-3 Purpose.

§ 71-4 Statutory authority.

§ 71-5 Applicability.

§ 71-6 Exemptions and modified requirements.

§ 71-7 Compatibility with other ordinances or legal requirements.

§ 71-8 Financial security.

§ 71-9 Waivers.

§ 71-10 Erroneous permit.

Article II Definitions

§ 71-11 Interpretation.

§ 71-12 Definitions.

Article III Stormwater Management Standards

§ 71-13 General requirements.

§ 71-14 Permit requirements by other governmental entities.

§ 71-15 Erosion and sediment control.

§ 71-16 Site design process.

§ 71-17 Water quality and runoff volume requirements.

§ 71-18 Infiltration requirements.

§ 71-19 Stream channel protection requirements.

§ 71-20 Stormwater peak rate control requirements.

§ 71-21 Calculation methodology.

§ 71-22 Other Requirements.

Article IV Stormwater Management (SWM) Site Plan Requirements

§ 71-23 General requirements.

§ 71-24 SWM site plan contents.

§ 71-25 SWM site plan submission.

§ 71-26 SWM site plan review.

§ 71-27 Revision of SWM site plans.

§ 71-28 Resubmission of inconsistent or noncompliant SWM site plans.

Article V Performance and Inspection of Regulated Activities; Final As-Built Plans

§ 71-29 Performance and inspection of regulated activities.

§ 71-30 Final as-built plans.

Article VI Fees and Expenses

§ 71-31 SWM site plan review and inspection fees established.

§ 71-32 Expenses covered by fees.

Article VII Operation and Maintenance (O&M) Responsibilities and Easements

§ 71-33 General requirements for protection, operation and maintenance of stormwater BMPs and conveyances.

§ 71-34 Operation and maintenance plans.

§ 71-35 Operation and maintenance agreements.

§ 71-36 Easements and deed restrictions.

§ 71-37 Other postconstruction responsibilities.

Article VIII Prohibitions

§ 71-38 Prohibited Discharges.

§ 71-39 Prohibited connections.

§ 71-40 Roof drains and sump pumps.

§ 71-41 Alteration of BMPs.

Article IX Enforcement and Penalties

§ 71-42 Public nuisance.

§ 71-43 Right of entry.

§ 71-44 Enforcement.

§ 71-45 Suspension and revocation of permits and approvals.

§ 71-46 Violations and penalties.

§ 71-47 Appeals.

§ 71-48 Effective date.