[1]
Editor's Note: Original § 15.15, Regulations for moving buildings,was deleted at time of adoption of Code (see Code Adoption Ordinance).
Before a building can be demolished or removed, the owner or agent shall notify all utilities having service connections within the building, such as water, electric, gas, sewer and other connections. A permit to demolish or to remove a building shall not be issued until it is ascertained that service connections and appurtenant equipment, such as meters and regulators, have been removed or sealed and plugged in a safe manner. Excavations shall be filled with solid fill to match lot grade within 30 days of removal of the structure. Excavations shall be protected with appropriate fences, barriers and lights.