Upon presentation of proper credentials, duly
authorized representatives of the Borough may enter at reasonable
times upon any property within the Borough to inspect the condition
of the stormwater structures and facilities in regard to any aspect
regulated by this chapter.
In the event that a person fails to comply with
the requirements of this chapter, or fails to conform to the requirements
of any approvals issued hereunder, the Borough shall provide written
notification of the violation. Such notification shall set forth the
nature of the violation(s) and establish a time limit for correction
of these violation(s). Failure to comply within the time specified
shall subject such person to the penalty provisions of this chapter.
All such penalties shall be deemed cumulative and resort by the Borough
from pursuing any and all remedies. It shall be the responsibility
of the owner of the real property on which any regulated activity
is proposed to occur, is occurring, or has occurred, to comply with
the terms and conditions of this chapter.
The Borough Council is hereby authorized and
directed to enforce all of the provisions of this chapter. All inspections
regarding compliance with the drainage plan shall be the responsibility
of the Municipal Engineer or other qualified persons designated by
the Borough.
A. A set of design plans approved by the Borough shall
be on file at the site throughout the duration of the construction
activity. Periodic inspections may be made during construction.
B. It shall be unlawful for any person, firm or corporation to undertake any regulated activity under §
290-6 on any property except as provided for in the approved drainage plan and pursuant to the requirements of this chapter. It shall be unlawful to alter or remove any control structure required by the drainage plan pursuant to this chapter or to allow the property to remain in a condition that does not conform to the approved drainage plan.
C. Suspension and revocation of approvals and/or permits.
(1) Any approval or permit issued under this chapter may
be suspended or revoked by the governing body for:
(a)
Noncompliance with or failure to implement any
provision of the permit.
(b)
A violation of any provision of this chapter
or any other applicable law, ordinance, rule or regulation relating
to the project.
(c)
The creation of any condition or the commission
of any act during construction or development which constitutes or
creates a hazard or nuisance, pollution or which endangers the life
or property of others.
(2) A suspended approval or permit shall be reinstated
by the governing body when:
(a)
The Municipal Engineer or his designee has inspected
and approved the control measure(s), or the elimination of the hazard
or nuisance; and/or
(b)
The governing body is satisfied that the violation
of the ordinance, law, or rule and regulation has been corrected.
(c)
A permit that has been revoked by the governing
body cannot be reinstated. The applicant may apply for a new permit
under the procedures outlined in this chapter.
D. Occupancy permits. An occupancy permit shall not be issued unless the certification of completion pursuant to §
290-33C and
D has been secured. The occupancy permit shall be required for each lot owner and/or developer for all subdivisions and land development in the Borough.