Township of Uwchlan, PA
Chester County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Board of Supervisors of the Township of Uwchlan 12-9-2013 by Ord. No. 2013-07.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Sewers — See Ch. 200.
Subdivision and land development — See Ch. 260.
Zoning — See Ch. 265.
Attachment 1 - Appendix A - Simplified Approach to Stormwater Management for Small Projects Attachment 2 - Appendix B - Natural Hydrology Site Design Process Attachment 3 - Appendix C - Runoff Coefficients and Curve Numbers Attachment 4 - Appendix D - West Nile Virus Design Guidance Attachment 5 - Appendix E - Stormwater Best Management Practices and Conveyances Operation and Maintenance Agreement
[1]
Editor's Note: This ordinance repealed former Ch. 214, Stormwater Management, adopted 5-9-2005 by Ord. No. 2005-02, as amended.
Article I General Provisions

§ 214-1 Short title.

§ 214-2 Statement of findings.

§ 214-3 Purpose.

§ 214-4 Statutory authority.

§ 214-5 Applicability.

§ 214-6 Exemptions and modified requirements.

§ 214-7 Repealer.

§ 214-8 Severability.

§ 214-9 Compatibility with other ordinances or legal requirements.

§ 214-10 Financial security.

§ 214-11 Waivers.

§ 214-12 Erroneous permit.

Article II Definitions

§ 214-13 Interpretation.

§ 214-14 Definitions.

Article III Stormwater Management Standards

§ 214-15 General requirements.

§ 214-16 Permit requirements by other governmental entities.

§ 214-17 Erosion and sediment control.

§ 214-18 Site design process.

§ 214-19 Water quality and runoff volume requirements.

§ 214-20 Infiltration requirements.

§ 214-21 Stream channel protection requirements.

§ 214-22 Stormwater peak rate control requirements.

§ 214-23 Calculation methodology.

§ 214-24 Other requirements.

§ 214-25 Other conveyance and system design standards.

Article IV Stormwater Management (SWM) Site Plan Requirements

§ 214-26 General requirements.

§ 214-27 SWM site plan contents.

§ 214-28 SWM site plan submission.

§ 214-29 SWM site plan review.

§ 214-30 Revision of SWM site plans.

§ 214-31 Resubmission of inconsistent or noncompliant SWM site plans.

Article V Performance and Inspection of Regulated Activities; Final As-Built Plans

§ 214-32 Performance and inspection of regulated activities.

§ 214-33 Final as-built plans.

Article VI Fees and Expenses

§ 214-34 SWM site plan review and inspection fees established.

§ 214-35 Expenses covered by fees.

Article VII Operation and Maintenance (O&M) Responsibilities and Easements

§ 214-36 General requirements for protection, operation and maintenance of stormwater BMPs and conveyances.

§ 214-37 Operation and maintenance plans.

§ 214-38 Operation and maintenance agreements.

§ 214-39 Easements and deed restrictions.

§ 214-40 Other postconstruction responsibilities.

Article VIII Prohibitions

§ 214-41 Prohibited discharges.

§ 214-42 Prohibited connections.

§ 214-43 Roof drains and sump pumps.

§ 214-44 Alteration of BMPs.

Article IX Enforcement; Penalties for Offenses

§ 214-45 Public nuisance.

§ 214-46 Right of entry.

§ 214-47 Enforcement.

§ 214-48 Suspension and revocation of permits and approvals.

§ 214-49 Violations and penalties.

§ 214-50 Appeals.