Planning Board fees are as follows:
Service
Fee
Informal application
Casual subdivision/lot line change
$75
Forestry operation
$75
Home occupation
$75
All other applications
$75
Casual subdivision/lot line change
$250
Amended subdivision plan
$150
Minor subdivision (four or fewer lots)
$500, plus $150/per lot
Major subdivision
Five to 15 lots, with or without central sewer and water
$1,000, plus $150/per lot
Sixteen or more lots, with or without central sewer and water
$1,500, plus $175/lot
Site plans
Nonresidential/commercial site plans
$750
Amended site plan
$150
Up to 10,000 square feet
$0.25/square foot
10,001 square feet to 50,000 square feet
$0.10/square foot
50,001 square feet to 100,000 square feet
$0.05/square foot
Over 100,001 square feet
$0.01/square foot
Mining operation
First 5 acres of disturbance
$500
Each additional acre of disturbance
$100
Forestry
$250
Home occupation
$250
Planning Board consultant fees are not included. (See Escrow.) All consultant fees are billed on an hourly basis and are subject to change without notice. Consultant fees as follows:
McGoey, Hauser & Edsall
$36/hour to $140/hour
Landscape architect (Robert Hansen)
$95/hour
Recording secretary
$1/page, plus percentage of meeting cost
Public improvements inspection fee
4% of estimated total costs
Private improvements inspection fee
2% of estimated total costs
The Town Engineer must witness all percolation tests. Escrow money must be on file before this can be done.
Public hearing fee
$150, plus $5/parcel
Site visit
$100
Clerical
$30/hour
Copies
$0.25/page

§ 90-2 Escrow Fee Schedule.

[Added 1-16-2007]
A. 
The applicant shall deposit with the Town the cost of professional services required for review of the application. Escrow monies not expended are returnable to the applicant. Where charges exceed the escrow account balance, additional funds will be requested to cover said costs. The following fees apply:
Type of Application
Fee
Subdivision
For each lot up to 5 lots
$300/lot
For each lot over 5 lots
$100/lot
Lot line change
$500
Multifamily site plan
First 50 units
$100/unit
Over 50 units
$50/unit
Commercial subdivision
First 5 lots
$350 each
Over 5 lots
$125 each
Site plan or special permit
$300, plus $50/1,000 square feet of building floor area
SEQRA
Short environmental assessment form
$100
Long environmental assessment form
$250
Environmental impact statement
$5,000
B. 
Separate checks must be given for application fees, escrow fees and SEQRA fees.

§ 90-3 Fee schedule for underground utility work.

[Added 6-3-2010]
Schedule of Fees for Permits – Work Within Town Right-of-Way
Application Fee
Performance Deposit*
Inspection Fee
Installation, repair and maintenance of underground utilities within the Town right-of-way
$150
0 ft. to 500 ft: $10/ft
501 ft. to 1,000 ft: $8/ft
Over 1,000 ft: $6/ft
$2/ft gas, electric, telephone, cable
$2/ft storm drain
$4/ft sewer & water