[HISTORY: Adopted by the Town Board of the
Town of Wawayanda as indicated in section histories. Amendments noted
where applicable. Additional fees may be on file in the Town offices.]
[Last amended 10-5-2017]
Planning Board fees are as follows:
Service
|
Fee
| ||||
---|---|---|---|---|---|
Informal application/only one meeting plus any
applicable review fees
| |||||
Lot line change
|
$250
| ||||
Forestry operation
|
$250
| ||||
Home occupation
|
$250
| ||||
All other applications
|
$250
| ||||
Lot line change
|
$350
| ||||
Amended subdivision plan
|
$250
| ||||
Minor subdivision (four or fewer lots)
|
$500, plus $200/per lot
| ||||
Major subdivision
| |||||
Five to 15 lots, with or without central sewer
and water
|
$1,000, plus $200/per lot
| ||||
Sixteen or more lots, with or without central
sewer and water
|
$1,500, plus $200/lot
| ||||
Site plans
| |||||
Nonresidential/site plans
|
$1,500, plus $150/1,000 square feet of building
| ||||
Amended/nonresidential site plans
| |||||
Application fee for anything related to amended
site plan
|
$1,500, plus $150/1,000 square feet of new building
| ||||
Minor changes to approved site plans that propose
a change, not to exceed 1,000 square feet of improvements within the
approved footprint
|
$300
| ||||
Change of use that does not propose any physical
change to an approved site plan
|
$150
| ||||
Solar array
|
$1,500, plus $2,500/megawatt
| ||||
Mining operation
| |||||
First 5 acres of disturbance
|
$500
| ||||
Each additional acre of disturbance
|
$100
| ||||
Forestry
|
$250
| ||||
Home occupation
|
$250
| ||||
Accessory apartment
|
$250
| ||||
Planning Board consultant fees are not included.
(See Escrow.) All consultant fees are billed on an hourly basis and
are subject to change without notice. Consultant fees as follows:
| |||||
McGoey, Hauser & Edsall
|
$36/hour to $140/hour
| ||||
Robert Hansen/Landscape architect
|
$95/hour
| ||||
Recording secretary/stenographers
|
$5.25/page, plus $75 appearance fee and $15
shipping and handling, if mailed
| ||||
Public improvements inspection fee
|
4% of estimated total costs
| ||||
Private improvements inspection fee
|
2% of estimated total costs
| ||||
The Town Engineer must witness all percolation
tests. Escrow money must be on file before this can be done.
| |||||
Public hearing fee
|
$150, plus $5/parcel
| ||||
Clerical
|
$30/hour
| ||||
Copies
|
$0.25/page
|
[Added 1-16-2007; amended 10-5-2017]
A.
The applicant shall deposit with the Town the cost
of professional services required for review of the application. Escrow
monies not expended are returnable to the applicant. Where charges
exceed the escrow account balance, additional funds will be requested
to cover said costs. The following fees apply:
Type of Application
|
Fee
| ||
---|---|---|---|
Subdivision
| |||
For each lot up to 5 lots
|
$300/lot
| ||
For each lot over 5 lots
|
$100/lot
| ||
Lot line change
|
$500
| ||
Multifamily site plan
| |||
First 50 units
|
$100/unit
| ||
Over 50 units
|
$50/unit
| ||
Commercial subdivision
| |||
First 5 lots
|
$350 each
| ||
Over 5 lots
|
$125 each
| ||
Solar array
|
$1,500
| ||
Site plan or special permit
|
$300, plus $50/1,000 square feet of building
floor area
| ||
SEQRA
| |||
Short environmental assessment form
|
$150
| ||
Long environmental assessment form
|
$300
| ||
Environmental impact statement
|
$5,000
|
B.
Breakdown of all fees must accompany check.
[Added 6-3-2010]
Schedule of Fees for Permits – Work Within
Town Right-of-Way
Application Fee
|
Performance Deposit*
|
Inspection Fee
| |
---|---|---|---|
Installation, repair and maintenance of underground utilities
within the Town right-of-way
|
$150
|
0 ft. to 500 ft: $10/ft
501 ft. to 1,000 ft: $8/ft
Over 1,000 ft: $6/ft
|
$2/ft gas, electric, telephone, cable
$2/ft storm drain
$4/ft sewer & water
|