Planning Board fees are as follows:
Service
Fee
Informal application/only one meeting plus any applicable review fees
Lot line change
$250
Forestry operation
$250
Home occupation
$250
All other applications
$250
Lot line change
$350
Amended subdivision plan
$250
Minor subdivision (four or fewer lots)
$500, plus $200/per lot
Major subdivision
Five to 15 lots, with or without central sewer and water
$1,000, plus $200/per lot
Sixteen or more lots, with or without central sewer and water
$1,500, plus $200/lot
Site plans
Nonresidential/site plans
$1,500, plus $150/1,000 square feet of building
Amended/nonresidential site plans
Application fee for anything related to amended site plan
$1,500, plus $150/1,000 square feet of new building
Minor changes to approved site plans that propose a change, not to exceed 1,000 square feet of improvements within the approved footprint
$300
Change of use that does not propose any physical change to an approved site plan
$150
Solar array
$1,500, plus $2,500/megawatt
Mining operation
First 5 acres of disturbance
$500
Each additional acre of disturbance
$100
Forestry
$250
Home occupation
$250
 
Accessory apartment
$250
Planning Board consultant fees are not included. (See Escrow.) All consultant fees are billed on an hourly basis and are subject to change without notice. Consultant fees as follows:
McGoey, Hauser & Edsall
$36/hour to $140/hour
Robert Hansen/Landscape architect
$95/hour
Recording secretary/stenographers
$5.25/page, plus $75 appearance fee and $15 shipping and handling, if mailed
Public improvements inspection fee
4% of estimated total costs
Private improvements inspection fee
2% of estimated total costs
The Town Engineer must witness all percolation tests. Escrow money must be on file before this can be done.
Public hearing fee
$150, plus $5/parcel
Clerical
$30/hour
Copies
$0.25/page
[Added 1-16-2007; amended 10-5-2017]
A. 
The applicant shall deposit with the Town the cost of professional services required for review of the application. Escrow monies not expended are returnable to the applicant. Where charges exceed the escrow account balance, additional funds will be requested to cover said costs. The following fees apply:
Type of Application
Fee
Subdivision
For each lot up to 5 lots
$300/lot
For each lot over 5 lots
$100/lot
Lot line change
$500
Multifamily site plan
First 50 units
$100/unit
Over 50 units
$50/unit
Commercial subdivision
First 5 lots
$350 each
Over 5 lots
$125 each
Solar array
$1,500
Site plan or special permit
$300, plus $50/1,000 square feet of building floor area
SEQRA
Short environmental assessment form
$150
Long environmental assessment form
$300
Environmental impact statement
$5,000
B. 
Breakdown of all fees must accompany check.
[Added 6-3-2010]
Schedule of Fees for Permits – Work Within Town Right-of-Way
Application Fee
Performance Deposit*
Inspection Fee
Installation, repair and maintenance of underground utilities within the Town right-of-way
$150
0 ft. to 500 ft: $10/ft
501 ft. to 1,000 ft: $8/ft
Over 1,000 ft: $6/ft
$2/ft gas, electric, telephone, cable
$2/ft storm drain
$4/ft sewer & water