Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Holland, NJ
Hunterdon County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Adopted by the Township Committee of the Township of Holland 7-6-2010 by Ord. No. 2010-12A. Amendments noted where applicable.]
GENERAL REFERENCES
Development fees — See Ch. 66.
Board of Health fees — See Ch. 188.
The following schedule consists of fees for the various applications, licenses, permits, activities and services required or provided for under Township ordinances, rules and regulations as included in this Code. Specific regulations, application procedures and requirements, conditions and approval provisions with respect to which each fee is required may be found in the pertinent chapter of this Code referred to below.
Chapter of Code/Type of Application, License, Permit, Activity or Service
Fee
Chapter 3, Charges for Copies of Township Records
1 to 10 pages
$0.75 per page
11 to 20 pages
$0.50 per page
Over 20 pages
$0.25 per page
Chapter 5, Construction Permit Prior Approval Fee
Prior approval certificate
$25
Chapter 32, Police and Public Safety, Department of
Police report fees
Reports released at police headquarters:
First 10 pages
$0.75 per page
Next 10 pages
$0.50 per page
Over 20 pages
$0.25 per page
Reports mailed:
Up to 5 pages
$10
Each additional page
$0.50 per page
Legal discoveries of case records, regardless of the number of copies
Minimum prepayment of $15, which will be applied to the total cost
Photographs
Reprints from negatives
$1 per print
Copy of a print with no negative
$2.50 per print
Copy of a print with negative
$5 per negative, plus $1 per print
Videos and audio tapes
Video copy
$50 each
Audio tape copy
$20 each
Typed statements
Up to 5 pages
$10
Each additional page
$0.50
Storage of vehicles and large equipment
Storage charge
$25 every 24 hours
Outside jobs and/or road jobs
[Added 6-15-2021 by Ord. No. 2021-10]
See § 32-13F
Outside jobs for volunteer and nonprofit organizations, when the activity is designed to benefit the Holland Township community
[Added 6-15-2021 by Ord. No. 2021-10]
See § 32-13G
Outside jobs or road jobs that entail the use of a police vehicle
[Added 6-15-2021 by Ord. No. 2021-10]
See § 32-13H
Chapter 43, Alcoholic Beverages
Annual club license
$188
Annual plenary retail distribution license
$2,500
Aqnnual plenary retail consumption license
$2,500
Chapter 68, Dogs and Other Animals
[Amended 11-7-2019 by Ord. No. 2019-20]
Article II, Dogs
Annual license and registration
Sum of $12, including the following:
License fee
$12
Additional annual license and registration fee for any dog of reproductive age which has not had its reproductive capacity permanently altered through sterilization
$3
Annual license fee for kennel
10 or fewer dogs
$10
More than 10 dogs
$25
Annual license fee for pet shop
$0
Annual license fee for shelter or pound
$0
Additional fee for delinquent licenses
$10
Maintenance fee for seized dog
$10
Chapter 72, Driveways
[Amended 10-19-2010 by Ord. No. 2010-20]
Driveway permit
Existing driveway modified solely by repaving an already paved driveway with no change in driveway location or elevation
$25
Existing driveway modified solely by paving the existing stone or other surface of an existing driveway with no change in the driveway location or elevation
$100
New driveway construction or horizontal or vertical relocation of an existing driveway
$300
Reissuance fee: Where a previously issued driveway permit is requested to be amended, changed, or modified at the owner's request, a permit reissuance fee shall be paid
$100
Deposit, also to be paid as required by § 72-3E
$500
Chapter 76, Street Opening Permits
[Amended 12-6-2022 by Ord. No. 2022-21]
Application fees
0 to 50 square feet of disturbance
$50
51 to 300 square feet
$300
Over 300 square feet
$500
Inspection escrows
0 to 50 square feet
$750 per day ($375 per half day)
51 to 300 square feet
$750 per day ($375 per half day)
Over 300 square feet
$750 per day ($375 per half day)
Chapter 85, Fireworks
Application fee
$50
Chapter 100, Land Use
Part 1, Zoning
Industrial use permit special report fee
$250
Wireless telecommunications towers and antennas variance or conditional use permit fees
If no new tower is proposed
$1,000 application charge, plus $2,000 escrow deposit
If new tower is proposed
$5,000 application charge, plus $5,000 escrow deposit
Flood Hazard District development permit
[Amended 12-19-2023 by Ord. No. 2023-19]
$300 filing fee, plus $1,500 escrow deposit
Zoning permit
$75
Zoning permit solely for freestanding shed with floor area not exceeding 150 square feet or aboveground swimming pool
$25
Part 2, Development Regulations
[Amended 3-4-2014 by Ord. No. 2014-3; 5-2-2023 by Ord. No. 2023-07]
Land Use application fees
Application
Application fee
Escrow deposit
Appeal of denial of zoning permit
$300
$1,000
Request for zoning interpretation
$300
$3,000
Bulk "C" Variance
$300
$3,000
Bulk "C" Variance —accessory building only
$100
$1,000
Use "D" Variance
$750
$5,000
Conditional use
$750
$5,000
Informal conceptual review/discussion
$300
N/A
Minor subdivision
$750
$5,000
Major subdivision
$1,000
$5,000
Minor site plan
$500
$5,000
Major site plan
$500
$5,000
Stormwater plan reviews
$300
$1,500
Initial inspection deposit (based on total cost of improvements)
Less than $10,000
7%
$10,000 to $50,000
$700, plus 6% of the excess over $10,000
$50,000 to $100,000
$3,100, plus 5% of the excess over $50,000
$100,000 to $200,000
$5,600, plus 4.5% of the excess over $100,000
More than $200,000
$10,000, plus 4% of the excess over $200,000
Witnessing fee for percolation tests
$250 per lot, plus an additional fee of $250 per day where observation of percolation tests on any lot exceeds one day's time
Special meeting fee
$100, in addition the administrative officer may require an additional escrow deposit of up to $1,000 for each special meeting
Construction inspection fee deposit (based on estimated cost of improvements)
Less than $5,000
$350
$5,000 but less than $10,000
$350, plus 5% of excess over $5,000
$10,000 but less than $50,000
$600, plus 4% of excess over $10,000
$50,000 and over
$2,200, plus 3% of excess over $50,000
Part 3, Stormwater Management
[Amended 8-21-2018 by Ord. No. 2018-09; 12-19-2023 by Ord. No. 2023-19]
Stormwater plan review
$300
Development inspection escrow
$1,500
Chapter 115, Occupancy, Certificates of
First inspection fee
$75
Reinspection fee
$75
Chapter 120, Peddling and Soliciting
[Amended 12-6-2016 by Ord. No. 2016-6]
License fee
Bond
$1,000
Chapter 135, Sewers
Observation of sewer tests subsequent to initial test
$5
Surcharges for excess constituents
Biochemical oxygen demand (BOD)
$0.25 per pound
Suspended solids
$0.20 per pound
Chlorine demand
$0.20 per pound
Connection or hookup fee
$4,000 times the number of flat rate sewer rental units chargeable to all components of the connection unit to be served
Sanitary sewer rental
[Amended 2-15-2011 by Ord. No. 2011-2[1]]
$530 per year
Garbage grinder flat-rate sewer rental charge
$3 per quarter per garbage grinder
Fee to restore service
$50
Chapter 140, Soil Removal
Review fees
Applications for less than 500 cubic yards not involving any site work other than the excavation and removal of the material
$100
Applications for less than 500 cubic yards which will involve site work other than the excavation and removal of the material
$100, plus 1% of the cost of additional site work
Applications for 500 cubic yards or more not involving any site work other than the excavation and removal of the material
$300, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed over the first $500
Applications for 500 cubic yards or more involving site work other than the excavation and removal of the material
$300, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed, over the first 500, plus 1% of the cost of the additional site work
Inspection fees
Applications for less than 500 cubic yards not involving any site work other than the excavation and removal of the material
$100
Applications for less than 500 cubic yards which will involve site work other than the excavation and removal of the material
$100, plus 2% of the cost of the additional site work
Applications for 500 cubic yards or more not involving any site work other than the excavation and removal of the material
$100, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed, over the first 500
Applications for 500 cubic yards or more involving site work other than the excavation and removal of the material
$100, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed over the first 500, plus 2% of the cost of the additional site work
Chapter 161, Trailers and Trailer Parks
License fees
$200 yearly, plus the sum of $2 per calendar week or fraction thereof per trailer
[1]
Editor's Note: This ordinance also provided that it be effective March 2011, with the quarterly payment due March 1.