Prior to issuance of any building permits in
a land division located within the corporate limits and extraterritorial
plat approval jurisdiction of the City of Lodi, the subdivider shall
install required street and utility improvements as hereinafter provided.
A. Street and alley grading. The full width of the right-of-way
of each street and alley dedicated in the plat shall be graded.
B. Water supply. Water mains shall be provided to serve
the subdivision by extension of the existing City system. Service
connections stubbed in the property line and all necessary fire hydrants
shall also be provided.
C. Sewage disposal. Sanitary sewer mains and service
connections stubbed in to the property line shall be provided to serve
all the lots in the subdivision and shall be connected to the existing
City sewer system, except that where connection to the City sewer
system is not available in a street adjacent to or within the subdivision,
the sewer system within the subdivision shall be installed and capped
for future use. A variance to this requirement shall be granted if
the grades for such sewer connections to the existing sewer system
cannot be provided.
D. Street and alley paving. All streets and alleys shall
have an adequate subbase and shall be improved with an all-weather,
permanent surface.
E. Curb and gutter. Permanent curb and gutter shall be
installed.
F. Drainage. A drainage system in compliance with Chapter
162, Drainage, of the City Code shall be provided.
G. Monuments. Monuments of a permanent character (pipes,
steel rods, concrete, or equivalent) shall be placed in each corner
or angle on the boundary of the subdivision and at each corner of
each lot and in each intersection of street center lines. All United
States, state, county or other official benchmarks, monuments, or
triangulation stations shall be preserved in precise location. It
shall be the subdivider's responsibility to see that the monuments
are maintained in good order during construction and development.
The subdivider shall furnish the City with a
reproducible as-built set of plans showing all improvements for the
plat. The subdivider shall also furnish an itemized cost for the improvements
in the contract prior to the City's final acceptance of the improvements.