The subdivider shall be responsible for the construction of all public streets according to Village-approved street plans and profiles. Streets shall be constructed according to Village specifications, including but not limited to asphalt, curb and gutter, etc. The subdivider shall pay all costs of street construction. The Village may inspect any facet of street construction prior to acceptance. The Village may deny the issuance of any building permit for any lot which abuts a public street which has not been accepted by the Village.
The subdivider shall be responsible for the construction of all sanitary sewer improvements according to Village-approved plans. The subdivider shall pay all costs of sanitary sewer improvements. The Village may inspect any facet of sanitary sewer construction. The Village may deny the issuance of a building permit for any lot affected by a sanitary sewer or lateral that is not completed according to approved plans.
The subdivider shall be responsible for the construction of a public water supply system according to Village-approved plans. The subdivider shall pay all costs of public water supply improvements. The Village may inspect any facet of water system construction. The Village may deny the issuance of a building permit for any lot affected by a water main or lateral that is not completed according to approved plans.
The subdivider shall be responsible for the construction of sidewalks or trails according to Village-approved plans. The subdivider shall pay all costs of sidewalks and trails. The Village may inspect any facet of sidewalk or trail construction. The Village may deny the issuance of a building permit for any lot affected by a sidewalk or trail that is not completed according to approved plans.
The subdivider shall be responsible for the construction of all drainage improvements according to Village-approved drainage and stormwater management plans and permits. The subdivider shall pay all costs of drainage improvements. The Village may inspect any facet of drainage and stormwater improvement construction. The Village may deny the issuance of a building permit for any lot affected by a drainage improvement that is not completed or not completed according to approved plans and permits.
The subdivider shall be responsible for the grading of all streets and lots according to Village-approved drainage and street plans and permits. The subdivider shall pay all grading costs. The Village may inspect any facet of grading. The Village may deny the issuance of a building permit for any lot or lot abutting a street which is not graded according to approved plans and permits.
The subdivider shall be responsible to implement erosion and sediment control according to Village-approved plans and permits. The Village may deny the issuance of a building permit for any lot in a land division or subdivision which is not in compliance with an approved erosion and sediment control plan and permit.
The subdivider shall be responsible for the installation of street signs with street names, of a design approved by the Village, at the intersections of all dedicated public streets. The subdivider shall pay all costs of street signs.
The subdivider shall be responsible for the provision of electric power, telephone, cable facilities and gas. The Village, in its discretion, may require that such utilities be underground. The subdivider shall pay for the cost of providing all utilities.
The subdivider shall be responsible for the installation of streetlights according to Village-approved plans. The subdivider shall pay all costs of streetlights. Streetlights shall be operable at the time electricity is made available.
The subdivider shall pay a fee in the amount as prescribed in Chapter 40, Fees and Penalties, of this Code for street trees. The fee shall be kept by the Village in a separate account. Street trees will be planted by the Village within the street right-of-way for each lot after final grading of lots as determined by the Village.
[1]
Editor's Note: Amended at time of adoption of Code (see Ch. 25, Construction and Effect of Ordinances, Art. II).
The subdivider shall pay the reimbursable costs of subdivision work.
The subdivider shall be responsible for subdivision contingencies that may occur.
The subdivider shall be responsible for administrative costs as a percentage of the subdivision project.
The subdivider shall be responsible for miscellaneous costs related to the subdivision project.