[Amended 6-9-2020 by Ord. No. 14-20]
Section 4-2.01 lists the types of projects that require site plans. The Department of Planning & Zoning shall provide a detailed checklist of all items to be submitted with conceptual and detailed site development plan applications.
The following is a general list of plot plan requirements. Section 4-2.01.C.2 lists the types of projects that require plot plans.
A. 
For new construction of primary structures:
[Amended 9-21-2010]
1. 
Plot plan showing existing and proposed buildings and structures, topography/ grading, location and dimensions of lot, lot and block number and name of subdivision, if any.
2. 
Road name(s), width of abutting right-of-way, centerlines, road widths and grades.
3. 
Front, side and rear setbacks, easements and rights to discharge.
4. 
Sediment control measures and limit of work.
5. 
Discharge and storm drainage measures including rights and easements.
6. 
Legal restrictions (such as easements, existing covenants, zoning boundaries, etc.)
7. 
Existing natural features such as, but not limited to, waterways, floodplain areas, existing and proposed forest areas, landscaping, buffers, screening, etc. including requirements found in Article 8 of this Ordinance.
8. 
Human burial sites.
9. 
Historically significant structures.
B. 
For new accessory structures, additions, minor commercial uses without permanent structures or parking, or remodeling projects, a scale-drawing shall be submitted showing the location, dimensions and use of existing buildings, structures, roads, driveways, access, etc. for which a permit is requested.