There shall be a Planning Board as established in Chapter 109 of this Code.
All appeals and hearings by the Planning Board
shall be conducted in accordance with requirements of the Municipal
Land Use Law (N.J.S.A. 40:55D-1 et seq.).
The Planning Board may require that conditional
uses be periodically renewed. Such renewal shall be granted following
public notice and hearing, and may be withheld only upon a determination
by the Construction Official to the effect that such conditions with
the issuance of the original conditional use have not been or are
being no longer complied with. In such cases, a period of 60 days
shall be granted the applicant for full compliance prior to the revocation
of the conditional use. Any use for which a conditional use may be
granted shall be deemed to be a conforming use in the district in
which such use is located, provided that:
A.Â
The provision of this chapter under which such conditional
use was issued is still in effect;
B.Â
Such conditional use was issued in conformity with
the provisions of this chapter;
C.Â
Such conditional use shall be deemed to affect only
the lot or portion thereof for which such permit shall have been granted.
A.Â
Whenever the Planning Board grants a variance of the minimum yard dimensions as set forth in Article XIX, the applicant for such variance shall furnish to the Construction Official two copies of a survey of the premises for which the variance has been granted. The survey shall show thereon the courses and dimensions of the perimeter of the premises, the location of the proposed construction to which the variance relates, the distance from the construction to all lot lines of the premises, and the location of all existing buildings on the premises.
B.Â
The survey shall be furnished to the Construction
Official upon completion of the installation of the foundation, if
any, of the proposed construction and prior to the commencement of
any further work thereon. In the event no foundation is to be constructed,
then the survey shall be furnished to the Construction Official prior
to the commencement of any of the work to which the variance relates.
C.Â
The survey shall be prepared to scale by a New Jersey
licensed land surveyor, who shall certify thereon that the same is
a true and accurate survey.