Township of West Hanover, PA
Dauphin County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Board of Supervisors of the Township of West Hanover 12-20-2010 by Ord. No. 2010-17.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Uniform construction codes — See Ch. 88.
Floodplain management — See Ch. 108.
Sewers — See Ch. 158.
Streets and sidewalks — See Ch. 170.
Subdivision and land development — See Ch. 173.
Zoning — See Ch. 195.
168a Appendix A 168b Appendix B 168c Appendix C 168d Table C-2 168e Table C-3 168f Table C-4
[1]
Editor's Note: This chapter superseded former Ch. 168, Stormwater Management, adopted 4-4-2005 by Ord. No. 2005-4, as amended.
Article I General Provisions

§ 168-1 Short title.

§ 168-2 Statement of findings.

§ 168-3 Purpose.

§ 168-4 Statutory authority.

§ 168-5 Applicability.

§ 168-6 Repealer.

§ 168-7 Severability.

§ 168-8 Compatibility with other ordinance requirements.

§ 168-9 Duty of persons engaged in development of land.

§ 168-10 Other approvals.

Article II Definitions

§ 168-11 Definitions; word usage.

Article III Stormwater Management Standards

§ 168-12 General requirements.

§ 168-13 Exemptions; modifications of requirement.

§ 168-14 Volume controls.

§ 168-15 Rate controls.

Article IV E&S Standards

§ 168-16 Erosion and sedimentation requirements during earth disturbance activities.

§ 168-17 Total maximum daily load (TMDL) requirements.

Article V Design Criteria

§ 168-18 Design criteria for stormwater management and drainage facilities.

§ 168-19 Calculation methodology.

Article VI SWM Site Plan and Report Requirements

§ 168-20 General requirements.

§ 168-21 Contents.

§ 168-22 Submission.

§ 168-23 SWM site plan and report review.

§ 168-24 Modification of plans.

§ 168-25 Resubmission of disapproved SWM site plan and report.

§ 168-26 Authorization to construct and term of validity.

§ 168-27 Record drawings; completion certificate; final inspection.

Article VII Easements

§ 168-28 Easements.

Article VIII Maintenance Responsibilities

§ 168-29 Financial guarantee.

§ 168-30 Maintenance responsibilities.

§ 168-31 Maintenance agreement for privately owned stormwater facilities.

Article IX Inspections

§ 168-32 Schedule of inspections.

§ 168-33 Right of entry.

Article X Enforcement and Penalties

§ 168-34 Notification.

§ 168-35 Enforcement.

§ 168-36 Public nuisance.

§ 168-37 Suspension and revocation of approval or permit.

§ 168-38 Notification of violation.

§ 168-39 Violations and penalties.

§ 168-40 Appeals.

Article XI Prohibitions

§ 168-41 Prohibited discharges and connections.

§ 168-42 Roof drains.

§ 168-43 Alteration of BMPs.

Article XII Fees and Expenses

§ 168-44 General provisions.

§ 168-45 Expenses covered by fee.

§ 168-46 Filing fee.

§ 168-47 Fee schedule and payment.

§ 168-48 Recording of approved SWM site plan and related agreements.