[Adopted 4-1-1958 by Ord. No. 151; amended in its entirety 12-16-2002 by Ord. No. 771]
No connection or reconnection shall be made by property owners with the sanitary or trunk line sewers of the Borough of Baldwin until a written initial permit for connection, or permit for reconnection, as applicable, has been obtained from the Building Code Inspector of the Borough of Baldwin.
A. 
Conditions for issuance of initial permit for connection; fees.
(1) 
An initial permit for connection. An initial permit for connection shall be secured for the connection of sanitary facilities to said sanitary or trunk line sewers in all cases where the sewer abutting said property has been constructed by the Borough of Baldwin and where the property abutting the said sewer has not been heretofore assessed for the costs of the installation of said sewers, or where the property owner or owners refuse to pay such assessment or where a court of competent jurisdiction has declared that the assessment of benefits against said property is of no legal effect, provided that the owner of the property desiring to make said connection shall pay into the treasury of the Borough of Baldwin the sum of $2,000 per EDU.
B. 
Conditions for issuance of permit for reconnection; fees.
(1) 
Permit for reconnection. A permit for reconnection shall be secured for the connection of sanitary facilities to said sanitary or trunk line sewers, including but not limited to lateral lines intersecting therewith, in all cases where the sewer abutting said property has been constructed by the Borough of Baldwin and where the owner of the property abutting said sewer, or any person acting on said owner's direction, has or will cause any disturbance to be made at or about said connection, or where any replacement is made of, work is conducted upon, or repair is performed at or about said sanitary facilities, which will result in the disconnection and reconnection of any sanitary or trunk line sewers, including but not limited to lateral lines intersecting therewith.
(2) 
No person shall cause any work to be performed at or about any connection to the sanitary facilities of the Borough of Baldwin, including but not limited to its sanitary sewer lines, trunk line sewers, or any lateral lines intersecting therewith or joined thereto, except after making application to the Building Code Inspector of the Borough of Baldwin and upon issuance by said Inspector of a permit therefor, and no such connection or excavation, once commenced following issuance of a permit as provided in this subsection, shall be made or covered over until final inspection and certification thereof has been made and approved by the Inspector.
(3) 
A fee of $10 for tapping charges and permit and inspection fees shall be due and payable to the Borough of Baldwin at the time written application is made for a permit for reconnection.
(4) 
All applications for a permit for reconnection, and all requests to the Building Code Inspector of the Borough of Baldwin to make any inspection as required hereunder, shall be made at least three days prior to the date on which construction is scheduled to commence or certification is required.
The Council of the Borough of Baldwin reserves the right to make exceptions to and/or adjustments of the sums of money provided to be paid to the treasury of the Borough of Baldwin in § 134-25A above.