City of New Berlin, WI
Waukesha County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Common Council of the City of New Berlin 6-17-2013 by Ord. No. 2489.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Housing Trust Fund — See Ch. 38.
Building construction — See Ch. 80.
Comprehensive Plan — See Ch. 96.
Electrical standards — See Ch. 106.
Erosion control — See Ch. 110.
Fair housing — See Ch. 116.
Fire prevention — See Ch. 124.
Historic preservation — See Ch. 141.
Noise — See Ch. 171.
Plumbing standards — See Ch. 193.
Stormwater runoff — See Ch. 226.
Subdivision of land — See Ch. 235.
Transient lodging facilities — See Ch. 250.
Water and sewers — See Ch. 267.
[1]
Editor's Note: This ordinance adopted a comprehensive revision of former Ch. 275, Zoning, adopted 4-12-2005 by Ord. No. 2266, as amended.
Article I General Provisions

§ 275-1 Authority.

§ 275-2 Title.

§ 275-3 Applicability.

§ 275-4 Purpose and intent.

§ 275-5 Abrogation and greater restrictions.

§ 275-6 Minimum requirements; construal of provisions.

§ 275-7 Rules of construction and interpretation.

§ 275-8 Severability.

§ 275-9 Warning and disclaimer of liability.

§ 275-10 Repealer.

§ 275-11 Compliance required.

§ 275-12 Municipalities and state agencies regulated.

§ 275-13 Effective date; transitional provisions.

§ 275-13.1 Zoning districts.

Article II Review and Decisionmaking Bodies

§ 275-14 Common Council.

§ 275-15 Plan Commission.

§ 275-16 Board of Appeals.

§ 275-17 Department of Community Development.

§ 275-18 Inspection Services Division.

§ 275-19 Community Development Authority.

Article III Review and Approval Procedures

§ 275-20 Common review and approval procedures.

§ 275-21 Development review procedure.

§ 275-21.1 Comprehensive Plan and/or future Land Use Map amendment procedures.

§ 275-21.2 Current Sewer Service Area amendment procedures.

§ 275-21.3 Urban Service Area amendment procedures.

§ 275-22 Changes and amendments.

§ 275-23 Planned unit development (PUD).

§ 275-24 Zoning permits (use, site plan and architectural review).

§ 275-25 Building permits.

§ 275-26 Occupancy permits.

§ 275-27 Conditional uses.

§ 275-28 Development agreements.

§ 275-29 Sign permits.

§ 275-30 Variances.

§ 275-30.1 Administrative adjustments.

§ 275-31 Appeals.

Article IV Zoning Districts

§ 275-32 Agricultural districts.

§ 275-33 Residential districts.

§ 275-34 Commercial districts.

§ 275-35 Office and industrial districts.

§ 275-36 Institutional and recreational/park districts.

§ 275-37 Special districts.

§ 275-38 (Reserved)

§ 275-39 Special overlay districts.

Article V Use Regulations

§ 275-40 General provisions.

§ 275-41 Use-specific regulations.

§ 275-42 Accessory uses and structures.

§ 275-43 Temporary uses and structures.

Article VI Measurements

§ 275-44 Lot measurement and requirements.

§ 275-45 Height measurement and requirements.

§ 275-46 Yard/setback measurement and requirements.

Article VII Nonconformities

§ 275-47 General provisions.

§ 275-48 Nonconforming uses.

§ 275-49 Nonconforming structures.

§ 275-50 Nonconforming lots.

§ 275-51 Nonconforming signs.

Article VIII General Development Regulations

§ 275-52 General provisions.

§ 275-53 Site plan review principles and standards.

§ 275-54 Natural resource protection.

§ 275-54.1 Woodland, tree and vegetation protection (existing lands).

§ 275-55 Grading and drainage.

§ 275-55.1 Post-construction stormwater management.

§ 275-55.2 Construction site erosion control.

§ 275-55.3 Illicit charges and connections.

§ 275-56 Landscaping and buffering.

§ 275-57 Off-street parking, loading and access.

§ 275-58 Adequate public facilities.

§ 275-59 Architectural design standards.

§ 275-60 Performance standards.

§ 275-61 Signs.

§ 275-61.1 Newsracks.

Article IX Nonmetallic Mine Reclamation

§ 275-62 General provisions.

§ 275-63 Definitions.

§ 275-64 Standards.

§ 275-65 Nonmetallic mining reclamation permit application.

§ 275-65.1 Reclamation plan.

§ 275-65.2 Financial assurance.

§ 275-65.3 Public notice and right of hearing.

§ 275-65.4 Issuance of nonmetallic mining reclamation permit.

§ 275-65.5 Permit denial.

§ 275-65.6 Alternative requirements.

§ 275-65.7 Permit duration.

§ 275-65.8 Permit transfer.

§ 275-65.9 Previously permitted sites.

§ 275-65.10 Review.

§ 275-65.11 Permit modification.

§ 275-65.12 Permit suspension and revocation.

§ 275-65.13 Annual operator reporting.

§ 275-65.14 Plan review fees.

§ 275-65.15 Annual fees.

§ 275-65.16 Regulatory reporting and documentation.

§ 275-65.17 Completed reclamation: reporting, certification and effect.

§ 275-65.18 Permit termination.

§ 275-65.19 Right of entry and inspection.

§ 275-65.20 Orders and citations.

§ 275-65.21 Violations and penalties.

Article IXA Floodplain Zoning

§ 275-65.22 Statutory authorization, findings of fact, statement of purpose, title and general provisions.

§ 275-65.23 General standards applicable to all floodplain districts.

§ 275-65.24 Floodway District (FW).

§ 275-65.25 Floodfringe District (FF).

§ 275-65.26 Other floodplain districts.

§ 275-65.27 Nonconforming uses.

§ 275-65.28 Administration.

§ 275-65.29 Amendments.

§ 275-65.30 Enforcement and penalties.

§ 275-65.31 Definitions.

Article X Enforcement and Penalties

§ 275-66 Responsibility for inspection and enforcement.

§ 275-67 Violations.

§ 275-68 Remedies and enforcement powers.

§ 275-69 Enforcement procedures.

Article XI Definitions

§ 275-70 Terms defined.