[Adopted 3-7-1977; amended in its entirety 2-21-1989]
Each new building constructed shall be assessed a fee as set forth hereafter, which assessment or charge shall be used toward contributing to the costs of maintenance, repair, replacement and expansion of sewer and water facilities of the Township.
The fees charged and collected pursuant to this Article shall be deposited in a separate account entitled "Utilities Escrow Account," and retained for the purposes set forth above.
[Amended 4-17-1995; 9-16-2016 by Ord. No. 16-18]
A. 
Connection fees.
(1) 
Residential properties. The applicant shall pay a connection charge of $1,675 at the time of the application for each service connection to the utility water system.
(2) 
Commercial, industrial and other nonresidential properties.
(a) 
Connection fees or connections made by owners of commercial, industrial and other nonresidential properties shall be based on the schedule of fees as set forth below for each sewer lateral connected, based on the size of the connection in accordance with the following schedule:
Size
(inches)
Connection Fee
4
$1,675
6
$3,350
8
$5,650
10
$8,625
12
$12,275
(b) 
The fee shall be collected at the time the construction permit is issued.