Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Mountain Lakes, NJ
Morris County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Borough Council of the Borough of Mountain Lakes 6-23-1980 as Ch. XVI of the 1980 Code. Amendments noted where applicable.]
This chapter shall be known as the "Codification of Fees and Costs of the Borough of Mountain Lakes."
[Amended by Ord. No. 11-92]
This chapter is adopted in order to advise the citizens of the Borough and any and all persons doing business with the Borough of the various fees charged for services rendered by the departments and agencies of municipal government and to provide ready access to any and all such information.
[Last amended 11-24-2014 by Ord. No. 12-14[1]]
The following fees shall be charged by the Borough for services rendered or licenses/permits issued. All license fees shall be annual, unless otherwise noted.
Fee
A.
Borough Clerk.
(1)
Amusement devices, each machine
$100
(2)
Animals
[Amended 3-17-2017 by Ord. No. 01-17]
Annual cat license:
Neutered or spayed
$21
Unneutered or unspayed
$24
Late charge effective February 1
$25
Replacement tag
$5
Annual dog license:
Neutered or spayed
$21
Unneutered or unspayed
$24
Late charge effective February 1
$25
Replacement tag
$5
Kennel license
*The fee for a kennel license shall be the maximum fee authorized by the State of New Jersey
*Maintenance, per day
Fee set by contract
*Pet shop license
$25
*Recovery, each incident
Fee set by contract
(3)
Lake encroachment permit (new construction)
$150
(4)
Parking.
The fees for parking at the Railroad Station are as follows:
Annual permit:
*Per motor vehicle owned by Borough resident or by owner or employee of business located in Borough, provided that employee status, as such, is certified by owner
$25
*Per motor vehicle owned by non-Borough resident
$100
Daily permit:
Resident
$5
Nonresident
$10
Romaine Parking Area:
*Per motor vehicle owned by Borough resident or by owner or employee of business located in Borough, provided that employee status, as such, is certified by owner
$25
Fee for replacement of any parking sticker
$5
(5)
Peddlers and solicitors:
Licensing processing, per year
$100
(6)
Raffle license
*The fee for a raffle license shall be the maximum fee authorized by the State of New Jersey
(7)
Honorary/memorial tree
[Added 6-28-2021 by Ord. No. 13-21; amended 4-24-2023 by Ord. No. 9-23]
$425
B.
Construction Code.
[Amended 6-22-2020 by Ord. No. 6-20; 2-27-2023 by Ord. No. 3-23]
(1)
Building Subcode
Minimum fee
$85
New construction, including additions, per cubic foot of volume
$0.085
Renovations, alterations and repairs
Up to first $50,000 in cost, per $1,000
$28
Additionally from $50,001 to and including $100,000 in cost, per $1,000
$24
Additionally over $100,000 in cost, per $1,000
$20
For the purpose of determining estimated cost, the applicant shall submit such cost data as may be available produced by the architect or engineer of record, or by a recognized estimating firm, or by the contractor. A bona fide contractor's bid, if available, shall be submitted. The Construction Official shall make the final decision regarding estimated cost.
Fees for combination renovations and additions shall be computed as the sum of the fees computed separately.
Building or structural demolition
R5 Use Group, complete
$500
All other use groups, complete
$1,000
R5 Use Group, interior nonstructural
$85
All other use groups, nonstructural
$150
Garage or accessory building demolition
R5 Use Group
$80
All other use groups
$150
Moving a building, per $1,000 of estimated cost of work
$28
Asbestos abatement
$100
Administrative certificate of occupancy
$25
Lead hazard abatement
$150
Administrative certificate of clearance
$50
Flat fees for the following (not subject to minimum fee):
Swimming pools
$150
Temporary structures
Sheds, each
$25
House and construction trailers, each
$250
Tents, each
$120
Retaining wall with a surface area of 550 square feet or more that is associated with a Class 3 residential structure
$250
Retaining wall with a surface area of 550 square feet or less that is associated with a Class 3 residential structure
$150
Retaining wall, newly constructed, at other than a Class 3 residential structure shall be based on the cost of construction
Signs, per square foot
$4
Double-faced signs shall be based on the area of one face of the sign
Certificate of occupancy
New construction, R5 Use Group
$250
All other Use Groups
$300
Additions, R5 Use Group
$100
All other Use Groups
$200
Change of use group
$160
Certificate of continued occupancy
Minimum of all subcode fees plus Certificate of Occupancy fee
Temporary certificate of occupancy
Initial issuance
No fee
Subsequent renewals, each
$100
Certificate of approval
No fee
Plan review, nonrefundable
20% of construction permit fee
Permit surcharge fees
Permit surcharge [state-mandated, N.J.A.C. 5:23-4.19(b)], per cubic foot of volume (new work and additions only)
$0.00371
Alterations, per $1 of cost
$0.0019
Variation application as per N.J.A.C. 5:23-2.10
Class I structure
$700
Class I structure, resubmission
$250
Class II and III structures
$150
Class II and III structures, resubmission
$75
Reinstatement of lapsed permit for continuation of work
Minimum of each subcode section not completed
Withdrawn permit administration fee payable once application has been released for permit
20% of construction permit fee
Change of agent or contractor, each
$25
Closure of outstanding open permit, each
$85
(2)
Electrical Subcode
Minimum fee
$85
Electrical devices (i.e., lighting outlets, convenience receptacles, wall switches, smoke and heat detectors, fluorescent fixtures, fractional horsepower motors, emergency lights, exit lights, communication points, fire alarm devices, fire alarm control panel)
1 to 20 devices
$80
Each additional 20 devices
$25
Motors (all except those in plug-in appliances)
1 to 10 horsepower
$20
11 to 50 horsepower
$75
51 to 100 horsepower
$100
Over 100 horsepower
$450
Appliance equipment
1 to 10 kilowatts
$20
11 to 45 kilowatts
$75
46 to 112.5 kilowatts
$100
Over 112.5 kilowatts
$450
Transformers, generators
1 to 10 kilowatts
$50
11 to 45 kilowatts
$100
46 to 112.5 kilowatts
$200
Over 112.5 kilowatts
$450
Service entrance, panel, subpanel or disconnect
Up to 100 amperes
$75
101 to 200 amperes
$150
201 to 1,000 amperes
$250
Over 1,000 amperes
$450
Air-conditioning units (includes disconnect, compressor/condenser, air handler), each
$80
Replacement of any system part
$40
Burglar alarm system
$50
Replacement of any system part
$25
Swimming pools (includes receptacle, switch, trench, bonding)
$200
Equipotential bonding grid
$50
Hydromassage tub
$50
Hot tub, spa
$80
Certificate of compliance, annual inspection for public swimming pools, spas, hot tubs
$200
Photovoltaic systems
1 to 50 kilowatts
$125
51 to 100 kilowatts
$250
Greater than 100 kilowatts
$500
(3)
Fire Subcode fees
Minimum fee
$85
Sprinkler systems, each
Pipe schedule
$100
Hydraulically calculated
$100
R5 Use Group, 20 or fewer heads
$75
Sprinkler system heads, all use groups
1 to 20 heads
$100
21 to 100 heads
$200
101 to 200 heads
$400
201 to 400 heads
$750
401 to 1,000 heads
$1,150
Over 1,000 heads
$1,450
Sprinkler system supervisory devices (i.e., tamper switches low/high air), each
$20
Standpipes, each
$300
Fire alarm systems
Control panel, R5 Use Group, each
$50
Control panel, non-R5 Use Group, each
$100
Fire alarm systems alarm devices (i.e., smoke detector heads, heat detector heads, pull stations, waterflow alarms)
1 to 20 devices
$100
21 to 100 devices
$200
101 to 200 devices
$400
201 to 400 devices
$750
401 to 1,000 devices
$1,150
Over 1,000 devices
$1,450
Fire alarm system security devices (i.e., door locks, electromagnetic releases), each
$20
Fire alarm system signaling devices (i.e., horns, strobes, bells), each
$10
Independent preengineered system, each
Wet chemical system
$100
All other systems
$200
Gas- or oil-fired appliances, each
R5 Use Group
$50
All other use groups
$75
Metal chimney liner installation, each
$75
Exhaust systems, each
Commercial kitchen
$100
Smoke control system
$200
Incinerators, each
$460
Crematorium, each
$460
Fuel storage tanks
R5 Use Group, install, remove or abandon, each
$80
All other use groups, install remove or abandon, each
Up to 275 gallons
$100
276 gallons to 1,000 gallons
$200
Each additional 500 gallons
$50
Firepump, each
$100
(4)
Plumbing Subcode
Minimum fee
$85
Fixtures (i.e., lavatories, kitchen sinks, basins, urinals, water closets, bathtubs, shower stalls, sill cocks, laundry tubs, floor drains, drinking fountains, dishwashers, garbage disposals, clothes washers and similar devices), each
$25
Stacks, each
$65
Special devices (i.e., grease traps, oil separators, refrigeration units, utility service connections, backflow preventers, gas service interceptors and fuel oil piping), each
R5 Use Group
$60
All other use groups
$80
Utilization equipment (i.e., steam boilers, hot-water boilers, warm-air furnaces), all use groups other than R5
$150
Extension of existing heating systems
$75
Air-conditioning units, all use groups other than R5
$100
Water heaters, all use groups other than R5
$100
Gas piping, all use groups other than R5
$100
Vapor recovery systems, each
$100
Required annual reinspections (i.e., cross-connections, backflow preventers)
$100
Medical gas piping, per outlet
$25
VAV boxes
$25
Humidifiers
$25
Premanufactured homes, plan review, and connection inspections
$250
Swimming pools
$100
(5)
Mechanical Subcode
Minimum fee, initial device installed for an R3 or R5 Use Group residential structure
$85
Each additional device after the first, for an inspection by a mechanical inspector for an R5 or R3 Use Group residential structure
$60
(6)
Engineering
Engineering review fee
$300
Review of applications for construction permits which involve new construction, additions, modification of improved lot coverage or other work requiring review as determined by the Municipal Engineer.
C.
Department of Public Works.
[Amended 5-26-2015 by Ord. No. 03-15; 12-14-2015 by Ord. No. 14-15]
$100
(1)
Sewer connection permits:
Residential
$100
Commercial (businesses)
$200
Industrial/manufacturing
$460
(2)
Sewer connection fee:
$460
Per dwelling unit
(3)
Water services fee:
$80
Turning water on
Turning water off
$100
Remove meter
$200
Set meter, 5/8 or 3/4 inch, includes meter (new meters on 3/4 inch)
[Amended 11-9-2020 by Ord. No. 13-20]
$325
Set meter, one inch, includes meter
[Amended 11-9-2020 by Ord. No. 13-20]
$406.25
Set meter, larger than one inch
[Amended 11-9-2020 by Ord. No. 13-20]
N/A
Set meter, two inch, includes meter
[Added 11-9-2020 by Ord. No. 13-20]
$1,325
Set meter, four inch, includes meter
[Added 11-9-2020 by Ord. No. 13-20]
$1,325
Final meter reading for account closeout
$50
Test meter
$50
Temporary water service/construction purposes (nonpotable)
$60 plus water usage/volume
Hydrant flow test observation
$100
Pit meter installation plus cost of meter
$150
Water connection fee, per dwelling unit
1 inch or smaller
$2,000
1 1/2 inch or larger
$3,000
(4)
Water rates.
[Amended 10-8-2018 by Ord. No. 7-18; 10-14-2019 by Ord. No. 12-19; 9-30-2020 by Ord. No. 12-20]
Water meters per 100 gallons
Residential:
Minimum charge up to 11,968 gallons
$50.25
From 11,969 to 22,440 gallons
$0.4396
From 22,441 to 37,400 gallons
$0.4520
From 37,401 to 59,840 gallons
$0.4737
From 59,841 to 74,800 gallons
$0.4914
From 74,801 gallons and above
$0.5183
Commercial/industrial:
Minimum charge up to 11,968 gallons
$53.46
From 11,969 to 22,440 gallons
$0.4859
From 22,441 to 37,400 gallons
$0.5093
From 37,401 to 59,840 gallons
$0.5718
From 59,841 to 74,800 gallons
$0.6254
From 74,801 gallons and above
$0.6790
Sprinkler meters per 100 gallons
Residential:
Minimum charge up to 11,968 gallons
$64.14
From 11,969 to 22,440 gallons
$0.6326
From 22,441 to 37,400 gallons
$0.6933
From 37,401 to 59,840 gallons
$0.7434
From 59,841 to 74,800 gallons
$0.9113
From 74,801 gallons and above
$1.1723
Commercial:
Minimum charge up to 11,968 gallons
$69.51
From 11,969 to 22,440 gallons
$0.6771
From 22,441 to 37,400 gallons
$0.7379
From 37,401 to 59,840 gallons
$0.7899
From 59,841 to 74,800 gallons
$0.9363
From 74,801 gallons and above
$1.2152
Water meters per cubic feet
Residential:
Minimum charge up to 1,600 cubic feet
$50.25
From 1,601 to 3,000 cubic feet
$0.0329
From 3,001 to 5,000 cubic feet
$0.0338
From 5,001 to 8,000 cubic feet
$0.0354
From 8,001 to 10,000 cubic feet
$0.0368
From 10,001 cubic feet and above
$0.0387
Commercial/industrial:
Minimum charge up to 1,600 cubic feet
$53.46
From 1,601 to 3,000 cubic feet
$0.0363
From 3,001 to 5,000 cubic feet
$0.0380
From 5,001 to 8,000 cubic feet
$0.0427
From 8,001 to 10,000 cubic feet
$0.0467
From 10,001 cubic feet and above
$0.0507
Sprinkler meters per cubic feet
Residential:
Minimum charge up to 1,600 cubic feet
$64.14
From 1,601 to 3,000 cubic feet
$0.0474
From 3,001 to 5,000 cubic feet
$0.0519
From 5,001 to 8,000 cubic feet
$0.0553
From 8,001 to 10,000 cubic feet
$0.0681
From 10,001 cubic feet and above
$0.0877
Commercial:
Minimum charge up to 1,600 cubic feet
$69.51
From 1,601 to 3,000 cubic feet
$0.0506
From 3,001 to 5,000 cubic feet
$0.0552
From 5,001 to 8,000 cubic feet
$0.0591
From 8,001 to 10,000 cubic feet
$0.0700
From 10,001 cubic feet and above
$0.0908
Late charge on delinquent
8%
(5)
Sewer (rates based on water usage by water meter)
[Amended 11-14-2016 by Ord. No. 11-16; 10-8-2018 by Ord. No. 7-18; 9-30-2020 by Ord. No. 12-20]
Rates per 100 gallons
Residential
$0.6938
Commercial/Industrial
$0.7527
Rates per cubic feet
Residential
$0.0519
Commercial/Industrial
$0.0563
Late charge on delinquent sewer bills
8% per quarter
Minimum charge for sewer usage, pro rata when meter is connected for less than a quarter:
Residential sewer fee
$83.04
Commercial sewer fee
$90.09
(6)
Solid waste rates
(a)
Bag charges for garbage collection (sold in quantities of 10)
15-gallon capacity
$12.50
30-gallon capacity
$25
(b)
Garbage and recycling collection base rate, per quarter for nonresident
$88.50
*
Late penalty on delinquent garbage/recycling bill per quarter or part thereof
8%
(c)
Trash day charges
Car
$20
Station wagon, minivan, small SUV
$30
Large SUV, small pickup
$40
Large pickup, full-size van
$60
Exterior items
$20
Trailer ("U-Haul" type):
5 feet x 5 feet x 4 feet
$100
10 feet x 6 feet x 6 feet
$350
20 feet x 6 feet x 6 feet
$700
22 feet x 6 feet x 6 feet
$1,400
24 feet x 8 feet x 8 feet
$1,500
*An additional fee of $10 will be charged for trash that extends beyond the vehicle interior and/or is attached to the exterior of the vehicle
(7)
Street opening, driveway connection, curb permits
Curb lowering permit
$25
Driveway or private road construction permit
$25
Street opening, driveway connection or curb opening permit
$100
In addition to the fee for a street opening permit, there shall be an additional fee charged for street openings which occur earlier than five years from completion of the street improvement as follows:
(a)
During the first year following completion of street improvement
$1,000
(b)
During the second year following completion of street improvement
$900
(c)
During the third year following completion of street improvement
$800
(d)
During the fourth year following completion of street improvement
$700
(e)
During the fifth year following completion of street improvement
$600
(8)
Boat/watercraft removal fee
End of season removal
$50
Removal after December 15
An additional $5 per day up to an additional maximum of $50
Boat/watercraft retrieval
$50
D.
Alcoholic Beverages.
Club license
$188
Plenary retail consumption license
$2,500
Plenary retail distribution license
$2,500
Liquor permit (one day)
*Civic, religious or educational organization
$50
*All other organizations
$75
E.
Recreation
[Added 3-17-2017 by Ord. No. 01-17]
(1)
Beach Fees
[Amended 3-8-2021 by Ord. No. 6-21]
(a)
Family
$125
(b)
Family after June 30
$150
(c)
Individual
$30
(d)
Individual after June 30
$35
(e)
Nanny
$30
(f)
Nanny after June 30
$35
(g)
Seniors - 62+
Free
(h)
Children under two years old
Free
(i)
Guest books
$25 for 5 days
(j)
Replacement tags
[Amended 4-24-2023 by Ord. No. 9-23]
$20
(k)
Guest fee daily–purchased at beach
[Added 4-24-2023 by Ord. No. 9-23]
$8
(2)
Tennis fobs
[Amended 3-8-2021 by Ord. No. 6-21]
$25 per season
(3)
Boat rack and rings
[Amended 3-8-2021 by Ord. No. 6-21]
(a)
Racks and rings per season
$50
(b)
Seniors - 62+
$35
(4)
Boat registration
$5 per boat
(5)
Night fishing permit
$5 per year
(6)
Swim lessons
[Amended 4-24-2023 by Ord. No. 9-23]
$150 per week per student
(7)
Sailing lessons
[Amended 4-24-2023 by Ord. No. 9-23]
$150 per week per student
(8)
Summer camp
[Amended 4-24-2023 by Ord. No. 9-23]
$150 per week per student per session
(9)
Recreation programs
[Amended 3-8-2021 by Ord. No. 6-21; 4-24-2023 by Ord. No. 9-23]
$50 to $500
F.
Soil moving.
[Amended 12-14-2015 by Ord. No. 14-15; 3-17-2017 by Ord. No. 01-17]
(1)
Minor soil moving permit
$400
(2)
Major soil moving permit
$1,250
(3)
Soil moving escrow
$1,250
Soil erosion and sediment control certification fees shall be as follows:
Individual single-family residential products
$300 per project
Residential subdivisions per lot
$500 base fee plus $100
Residential developments and site plans per dwelling unit
$1,000 base fee plus $50
Nonresidential development and site plans
$1,000 base fee plus $100 per acre
G.
Planning Board.
[Amended 5-26-2015 by Ord. No. 03-15; 6-22-2020 by Ord. No. 6-20]
(1)
Minor subdivision
$450
Additional fee, each lot
$50
(2)
Major subdivision
(a)
Preliminary plat
$750
Additional fee, each lot
$150
Resubmission within one year, 50% of original fee
Minimum fee
$500
(b)
Final plat
$500
Additional fee, each lot
$100
(c)
Engineering inspection
$300
Plus % of cost of improvements
5%
(d)
Additional fee for variance, per application
$250 per variance
(e)
Combine preliminary and final subdivision
Combined fee for preliminary and final
(3)
Site plan
(a)
Preliminary
[1]
Basic
$500
[2]
Per 1,000 square feet of land
$5
[3]
Per 1,000 square feet of building floor area
$50
(b)
Final
[1]
Basic
$200
[2]
Per 1,000 square feet of land
$2.50
[3]
Per 1,000 square feet of building floor area
$30
(c)
Combine preliminary and final subdivision
Combined fee for preliminary and final
(d)
Resubmission within one year, of original fee
50%
Minimum fee
$400
(e)
Engineering inspection, plus
$200
Plus % of cost improvements
4%
(f)
Amended site plan
50% of original fee
(g)
Additional fee for variance, per application
$250 per variance
(h)
Informal review
No charge
(4)
Conditional use or change in use
Application
$750
(5)
Escrow fees
Residential subdivision
$5,000
Residential site plan (single-family home)
$750
Residential site plan (multiunit) per unit
$1,000
Nonresidential subdivision
$6,000
Nonresidential site plan
$10,000
Per review and/or testimony by outside consultants or experts
$3,500
Informal review
$750
(6)
Compiled and certified list of property owners in Borough
$10
(7)
When the applicant request that an application can be carried to another meeting there shall be an additional charge of 10% of the particular fee paid
(8)
Research that entails extraordinary effort on behalf of the public agency
$25 per hour
H.
Zoning Board of Adjustment
[Amended 6-22-2020 by Ord. No. 6-20]
(1)
Appeals
$250
(2)
C variances [N.J.S.A. 40:55D-70(c)] For structural additions and alterations to the principle structure
$250 per variance
(3)
C variances [N.J.S.A. 40:55D-70(c)] For non-structural additions or alterations to the principle structure such as decks, patios, compressor, etc.
$150 per variance
(4)
D variances [N.J.S.A. 40:55D-70(d)(1),(2),(3)]
$750 per variance
(5)
D variances [N.J.S.A. 40:55D-70(d)(4),(5),(6)]
$250 per variance
(6)
Interpretations
$250
(7)
Issuance of permit [N.J.S.A. 40:55D-34]
$250
(8)
Escrow fees
(a)
D variances [N.J.S.A. 40:55D-70 (d)(1),(2),(3)]
$1,500
(b)
Per review and/or testimony by outside consultants or experts
$3,500
(c)
Residential subdivision
$5,000
Residential site plan (single-family home)
$750
Residential site plan (multiunit) per unit
$1,000
Nonresidential subdivision
$6,000
Nonresidential site plan
$10,000
(9)
Subdivision, site plan, or conditional use approval pursuant to § 40-21A(7)
Same as Planning Board fees § 111-3G
(10)
Compiled and certified list of property owners in Borough
$10
(11)
Research that entails extraordinary effort on behalf of the public agency
$25
I.
Board of Health.
(1)
Retail food establishment
For each premises or establishment licensed, or approval of existing permit:
Nonrestaurant establishments where food items are sold
$75
Institutions
$75
Temporary establishments
$50
Restaurants:
1-99 seats
$100
100+ seats
$125
Food plan review
$100
Late fee if not renewed by June 30
$25
(2)
Individual and semipublic water supply:
*Filing application and plans for permit to locate and construct a water supply
$100
*Filing application and plans for a permit to alter an existing water supply
$100
*Issuance of permit to locate and construct or alter a water supply
$50
*Each reinspection of a water supply or part thereof caused by the failure of the permittee to locate and construction the same in accordance with the terms of the permit issued or the terms of the code
$50
(3)
Individual sewage disposal:
*Filing application and plans for a permit to locate and construct an individual sewage disposal system issuance of a license and permit to locate and construct an individual sewage disposal system for issuance of a license and permit to locate and construct or alter an individual sewage disposal system
$100
*Each reinspection of an individual sewage disposal system or part thereof caused by the failure of permittee to locate and construct or alter same in accordance with the terms of the permit issued or the terms of the code
$50
*Issuance or renewal of a license to a person or corporation engaged in the business of cleaning or emptying receptacles for the reception and storage of human excrement or other putrescible material, each vehicle or conveyance
$100
*Issuance of a permit to clean or empty any receptacle used for the reception or storage of human excrement or other putrescible matter
$100
(4)
Garbage, ashes and rubbish license, per operator
$100
(5)
Keeping of animals or poultry
$25
(6)
Vital statistics
Certified copy of birth, death, marriage, and civil union recorded
1-10 copies
$15 each
11-20 copies
$5 each
21+ copies
$2.50 each
Marriage or civil union license ($25 to state, $3 to Borough)
$28
Burial or removal permit
$1
Transit permit
$1
J.
Copies of documents.
(1)
Master Plan
$30
(2)
Land use ordinances
$30
(3)
Tax map, per sheet
$5
(4)
Natural resources inventory
$2
(5)
Police accident reports
$5 plus
Fees for copies shall be the maximum authorized by the State of New Jersey
per page copy charge
(6)
Copy fees
Fees for copies shall be the maximum authorized by the State of New Jersey
(7)
Special service charges
(a)
Where the nature, format, manner of collation or volume of printed matter is such that it cannot be reproduced by ordinary document copying equipment in ordinary business size or where such record requires an extraordinary expenditure or time and effort to accommodate a request for inspection or copying of documents, a special service charge shall be imposed, in addition to the actual costs of duplicating the record. A special service charge will also be applied when the custodian changes the medium in which the record is normally kept in order to comply with the request.
$28
(b)
The special service charge shall be paid to the Borough of Mountain Lakes at the following rates:
[1]
For all services performed by employees of the Borough, the actual hourly rate of compensation for each clerical and supervisory employee performing the service plus the copying or reproduction cost and actual mailing cost, when applicable
[2]
Postage will be added to the fee for records requested by mail
[3]
All fees must be paid prior to the release of any copies. The custodian of the records may require a deposit of all documents for inspection where it is estimated that the records requested will cost in excess of $5 to reproduce
(c)
For reasons of security, the use of a floppy disk, CD, videotape or audiotape provided by the requestor is prohibited. All electronic reproduction materials shall be supplied by the Borough of Mountain Lakes.
(d)
If the request for access to a government record would substantially disrupt municipal operation, the custodian of the records may deny access to the records after attempting to reach a reasonable solution with the requestor that accommodates the interests of the requestor and the municipality.
(e)
In the event that the requestor of the documents objects to any charges permitted by this chapter and no resolution of the objection may be reasonably accomplished, the custodian of records shall not incur any charges on behalf of the Borough to fulfill the document request.
(f)
Nothing in this section or any other ordinance of the Borough shall be constructed as requiring the Borough of Mountain Lakes to furnish copies of any privileged documents or other documents which have been determined to be exempt from the requirements of the Open Public Records Act or otherwise nondisclosable in accordance with any provision of law.
K.
Uniform Fire Safety Code.
Permit
Type 1
$42
Type 2
$166
Type 3
$331
Type 4
$497
Blasting permit
$250
Certificate of compliance for residential smoke alarms and carbon monoxide alarms
$100
Certificate of compliance for residential smoke alarms and carbon monoxide alarm - reinspection
[Added 12-11-2017 by Ord. No. 10-17]
$50 per inspection visit
Non-life-hazard annual inspection fee for premises:
[Amended 5-26-2015 by Ord. No. 03-15]
Up to and including 3,000 square feet
$65
Over 3,000 square feet and up to and including 6,000 square feet
$150
Over 6,000 square feet and up to and including 12,000 square feet
$250
Over 12,000 square feet
$400
Fire extinguisher training
[Added 5-26-2015 by Ord. No. 03-15]
1 to 5 people
$100
6 to 10 people
$150
11 or more people
$200
L.
Zoning. The fee for a zoning permit shall be $50. When professional engineering review is required in conjunction with the issuance of a zoning permit, the applicant shall post an engineering escrow of $300, which shall be used to pay for engineering review. This escrow shall be replenished, if necessary, to complete the engineering review.
M.
Police.
Police vehicle use of outside detail
$100 per day
Police outside duty administrative fee for processing
15% total cost
N.
Tax Collector.
[Amended 12-14-2015 by Ord. No. 14-15; 6-22-2020 by Ord. No. 6-20]
Initial request for duplicate tax bill
$5 (N.J.S.A. 54:4-64)
Each subsequent request for duplicate tax bill (in same fiscal year)
$25
Fee for multiple lien redemption requests
$50
Lien redemption administrative fee
$75
O.
Dishonored or returned checks.
[Added 12-14-2015 by Ord. No. 14-15; amended 6-22-2020 by Ord. No. 6-20; 2-27-2023 by Ord. No. 3-23]
$20
P.
Tree removal permit. Fees received shall be deposited in the Borough Shade Tree Fund.
[Added 4-12-2021 by Ord. No. 8-21; amended 6-28-2021 by Ord. No. 13-21; 2-27-2023 by Ord. No. 3-23]
Tree removal permit under § 102-36
$425 per tree removed
No fee is required for the removal of 50% of the trees from the setback area up to a maximum of 3 trees in a 12-month period.
[1]
Editor's Note: Subsequent amendments noted where applicable.