In all special flood hazard areas the following requirements
shall apply:
A. All subdivision proposals shall be consistent with the need to minimize
flood damage;
B. All subdivision proposals shall have public utilities and facilities
such as sewer, gas, electrical and water systems located and constructed
to minimize flood damage;
C. All subdivision proposals shall have adequate drainage provided to
reduce exposure to flood hazards; and
D. In Zone A, base flood elevation data shall be provided for subdivision
proposals and other proposed development (including manufactured home
parks and subdivisions) which are five acres or 50 lots, whichever
is lesser.