Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Barre, MA
Worcester County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
All sewer service lateral connections must be connected by September 20, 1993. The only exemptions will be those commercial, industrial and residential buildings which are declared uninhabitable by the Building Inspector, in written documentation, after an on-site inspection.
The per-day penalty for failure to connect by September 20, 1993, will be $200 for the first day and $10 for each additional day. The Board of Health may require service lateral connections prior to September 20, 1993.