A. 
Required. No unauthorized person shall uncover, make any connections with or opening into, use, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the inspector.
B. 
Classes. There shall be two (2) classes of building sewer permits: Class 1, for residential, and Class 2, for commercial and for service to establishments producing industrial wastes.
C. 
Application. The owner or his agent shall make application for a permit of either class specified in Subsection B on a special form furnished by the village. The permit application shall be supplemented by any plans, specifications or other information considered pertinent in the judgment of the inspector.
D. 
Fees. The nonrefundable fees set forth in Chapter 118, Fees, shall be paid to the village at the time the application for a sewer permit is filed.
[Amended 12-20-1977 by L.L. No. 9-1977[1]]
[1]
Editor's Note: Amended at time of adoption of Code; see Ch. 1, General Provisions, Art. I.
All costs and expense incident to the installation and connection of the building sewer to the public sewer system shall be borne by the owner. The owner shall indemnify the village from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.
A separate and independent building sewer shall be provided for every building; except where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one (1) building sewer.
Old building sewers may be used in connection with new buildings only when they are found on examination and test by the inspector to meet all requirements of this chapter.
The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench shall all conform to the requirements of the building and plumbing code[1] or other applicable rules and regulations of the village. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply.
[1]
Editor's Note: See Ch. 82, Building Construction and Fire Prevention, and Ch. 185, Plumbing, respectively.
Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which a building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be filled by an approved means and discharged to the building sewer.
No person shall make connection of roof downspouts, exterior foundation drains, areaway drains or other sources of surface runoff or groundwater to a building sewer or building drain which, in turn, is connected directly or indirectly to a public sanitary sewer.
The applicant for the building sewer permit shall notify the inspector when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the inspector or his representative.
The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing code[1] or other applicable rules and regulations of the village and the procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9. All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved by the inspector before installation.
[1]
Editor's Note: See Ch. 82, Building Construction and Fire Prevention, and Ch. 185, Plumbing, respectively.
A. 
Guarding. All excavations for building sewer installations shall be adequately guarded with barricades and lights so as to protect the public from hazard.
B. 
Restoration of streets, sidewalks, etc. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the village.