Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Marple, PA
Delaware County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: M
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Meetings
§ 8-21— Appeals and variance procedure. Ch 12 Art I— Meetings § 12-1— Time and place; exceptions. § 20-4— Records and reporting. § 22-7— Ethics Board. § 28-3— Organization. § 44-8— Enumeration of powers and duties. § 55-3— Rules and regulations; officers; records and reports. § 62-6— Health Officer as Police Surgeon. § 87-5— Disconnection of alarm system. § 95-10— Approval and adoption of rules. § 114-7— Bathroom facilities. § 114-10— Heating facilities. § 114-48— Emergency action. 129-1{7}— BLASTING AGENT 129-1{54}— SEMICONDUCTIVE HOSE § 129-22— Appeal to Board of Commissioners. 143-2E{19}— HISTORIC STRUCTURE § 143-6— Jurisdictional boundary changes. § 143-16— Elevation and floodproofing requirements. § 147-10— Approval of plans. § 147-58— Equipment and utensils. § 153-4— Exemption. § 153-7— Construction of machine. § 170-9— Bathroom facilities. § 170-12— Heating facilities. § 170-56— Emergency actions. § 224-4— Duration of right-of-way permit; suspension of permit. 229-1{5}— TATTOOING OR BODY PIERCING LICENSE § 229-9— Requirements of body piercing operating from facilities. § 235-6— Expenses to be met by charges. § 235-15— Charges. 244-1{6}— INDOOR PLACES OF PUBLIC ASSEMBLAGE § 244-3— Exceptions. § 252-38— Annual charge to be fixed by resolution. § 257-3— Purpose. 257-9{9}— BMP (BEST MANAGEMENT PRACTICE) 257-9{102}— PRETREATMENT 257-9{144}— STORMWATER MANAGEMENT DISTRICT § 257-10— General requirements. § 257-13— Nonstructural project design process (sequencing to minimize stormwater impacts). § 257-14— Infiltration volume requirements. § 257-16— Stream bank erosion requirements. § 257-17— Stormwater peak rate control. § 257-18— Calculation methodology. § 257-19— Other requirements. § 257-21— SWM site plan contents. § 257-31— Responsibilities for operations and maintenance (O&M) of stormwater controls and BMPs. § 257-44— Enforcement generally. § 261-17— Filing of plans for approval. § 265-5— Notification of property owners. § 265-10— Time limit for action by Board of Commissioners. § 265-17— Soil percolation tests. § 265-41— Street design; parking standards. § 265-44— Common open space. § 269-10— Rules of operation. § 274-17— Suspension of permit; hearing. 274-37{4}— FAMILY FARM CORPORATION § 285-3— Parking prohibited in designated locations. § 300-10— Hours of operation for businesses. 300-14{71}— FLOOR AREA, GROSS 300-14{90}— HOSPITAL 300-14{128}— NURSING HOME 300-14{149}— PUBLIC HEARING § 300-18— General provisions. § 300-30.1— RMHD Overlay District. § 300-32— Cluster Development Overlay District. § 300-34.1— Group homes. § 300-35.1— Conservation Overlay District. § 300-36— General provisions. § 300-41— O-1 Office MH District. § 300-42— B Business District. § 300-44— General provisions. § 300-48— Permitted uses. § 300-54— General provisions. § 300-60— Flood and floodplain protection. § 300-64— Historic resources protection. § 300-83— Recreational vehicle, boat and oversize vehicle parking in Residential Districts. § 300-84— Required parking for specific uses. § 300-87— Intent. § 300-95.1— Off-premises signs permitted in certain districts. § 300-110— Antennas. § 300-121— Enlargement. § 300-136— Zoning Hearing Board. § 300-139— Hearing procedure and notice.