Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Township of Middlesex, PA
Butler County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: H
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Handicapped persons
Hearings
ยงย 4-8— Powers and duties. ยงย 84-17— Appeals. ยงย 84-33— General. ยงย 84-34— Variance procedures and conditions. ยงย 89-25— Appeals. ยงย 97-12— Impact Fee Advisory Committee. ยงย 120-6— Appeals. ยงย 134-9— Appeals. ยงย 150-5— Interpretation. ยงย 150-7— Definitions. 150-7{79}— PUBLIC HEARING 150-7{81}— PUBLIC NOTICE ยงย 150-11— Preliminary approval procedures. ยงย 150-14— Recording of final plat. ยงย 155-20— Powers and duties of officer. ยงย 162-25— Effect of payment of towing and storage charges. 175-8{28}— BOARD 175-8{58}— CONDITIONAL USE 175-8{211}— PUBLIC HEARING 175-8{213}— PUBLIC NOTICE 175-8{220}— REHEARING 175-8{277}— USE BY SPECIAL 175-8{278}— VARIANCE 175-8{304}— ZONING HEARING BOARD ยงย 175-11— District boundaries. ยงย 175-12— Regulations applicable in all districts. ยงย 175-73— Application for tentative approval. ยงย 175-74— Public hearings. ยงย 175-75— Grant or denial of approval. ยงย 175-80— Status of plan after tentative approval. ยงย 175-81— Application for planned residential development final approval. ยงย 175-92— Approval of conditional uses; expiration. ยงย 175-93— Approval of uses by special exception; expiration. ยงย 175-105— Comparable uses not specifically listed. ยงย 175-119— Mineral removal. ยงย 175-139— Performance standards. ยงย 175-167— Nonconforming uses. ยงย 175-168— Nonconforming structures. ยงย 175-169— Nonconforming lots. Ch 175 Art XVI— Zoning Hearing Board ยงย 175-171— Organization; general powers and duties. ยงย 175-172— Membership; terms; vacancies; holding of additional offices. ยงย 175-174— Jurisdiction of the board. ยงย 175-176— Uses by special exception. ยงย 175-177— Conduct of hearings. ยงย 175-178— Failure to render decision or hold hearing in time. ยงย 175-179— Mediation option. ยงย 175-180— Fees and expenditures. ยงย 175-181— Time limitations. ยงย 175-182— Stay of proceedings. ยงย 175-184— Enforcement. ยงย 175-185— Building permits. ยงย 175-188— Method of appeal. ยงย 175-192— Required referrals. ยงย 175-193— Posting of notice of hearing. ยงย 175-194— Public hearing. ยงย 175-198— Landowner curative amendments. ยงย 175-241— Appeals.
Height regulations
ยงย 53-3— Regulations regarding posting and display. ยงย 84-6— Warning and disclaimer of liability. ยงย 84-25— Design and construction standards. ยงย 84-34— Variance procedures and conditions. 84-36{30}— REGULATORY FLOOD ELEVATION ยงย 89-18— Retaining walls. ยงย 89-22— General requirements. ยงย 101-16— Stormwater management. ยงย 101-18— Pedestrian circulation. ยงย 101-25— Traffic/regulatory and guidance signs. ยงย 144-20— Design criteria for stormwater management and drainage facilities. ยงย 150-26— Final application contents. ยงย 150-44— Standards for development in identified floodplain areas. ยงย 150-48— Landscape screening. ยงย 150-49— Park street system. 175-8{26}— BASEMENT 175-8{34}— BUILDING HEIGHT 175-8{83}— DWELLING 175-8{118}— HEIGHT OF BUILDING 175-8{119}— HEIGHT OF STRUCTURE, OTHER THAN A BUILDING 175-8{250}— STRUCTURAL ALTERATION ยงย 175-10— Enumeration of districts; general concepts. ยงย 175-15— Area and bulk regulations. ยงย 175-22— Area and bulk regulations. ยงย 175-29— Area and bulk regulations. ยงย 175-36— Area and bulk regulations. ยงย 175-46— Area and bulk regulations. ยงย 175-56— Area and bulk regulations. ยงย 175-69— Landscaping, signs, parking and loading regulations. ยงย 175-72— Building spacing. ยงย 175-73— Application for tentative approval. ยงย 175-92— Approval of conditional uses; expiration. ยงย 175-93— Approval of uses by special exception; expiration. ยงย 175-98— Billboards. ยงย 175-104— Nonmunicipal recreation. ยงย 175-112— Hazardous waste disposal, treatment, transportation or storage. ยงย 175-115— Junkyards. ยงย 175-118— Landfills or resource recovery facilities. ยงย 175-127— Public utility buildings. ยงย 175-127.3— Solar energy production facility, large. ยงย 175-128— Supply yards. ยงย 175-132— Communication facilities. ยงย 175-135— Restaurants. ยงย 175-140— Screening and landscaping. ยงย 175-142— Special yard requirements. ยงย 175-144— Height exceptions. ยงย 175-149— Storage. ยงย 175-155.2— Oil and gas well site development. ยงย 175-155.3— Natural gas compressor station and natural gas processing plant. ยงย 175-155.6— Residential wind energy systems. ยงย 175-155.9— Nontower wireless communication facilities (WCFs). ยงย 175-156— Off-street parking. ยงย 175-161— General regulations. ยงย 175-162— Signs authorized in all zoning districts. ยงย 175-164— Signs authorized in commercial and industrial districts. ยงย 175-167— Nonconforming uses. ยงย 175-169— Nonconforming lots. ยงย 175-185— Building permits. ยงย 175-201— Area and bulk regulations. ยงย 175-211— Area and bulk regulations. ยงย 175-219— Design standards. ยงย 175-222— Area and bulk regulations. ยงย 175-230— Design standards. ยงย 175-231— Purpose. 175-233{8}— HEIGHT 175-233{13}— OBSTRUCTION ยงย 175-235— Permit applications; exceptions. ยงย 175-245— Area and bulk regulations. ยงย 175-255— Area and bulk regulations. ยงย 175-257— Lighting.