home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Township of Middlesex, PA
chevron_right
2023-12-20
info
chevron_right
Index: I
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
I
add
Impact fees
Ch 65 — Construction Codes, Uniform
Ch 84 — Floodplain Management
Ch 89 — Grading, Excavation and Fill
Ch 97 — Impact Fees
ยงย 97-1 — Title.
ยงย 97-2 — Purpose.
ยงย 97-3 — Findings.
97-4{4} — IMPACT FEE
97-4{8} — PEAK-HOUR
97-4{10} — TRANSPORTATION CAPITAL IMPROVEMENTS PLAN
97-4{11} — TRANSPORTATION SERVICE AREAS
ยงย 97-5 — Applicability of impact fee and de minimus new development.
ยงย 97-6 — Imposition of impact fee.
ยงย 97-7 — Calculation of impact fee.
ยงย 97-8 — Additional impact fee.
ยงย 97-11 — Administration of impact fees.
ยงย 97-12 — Impact Fee Advisory Committee.
ยงย 97-13 — Disbursement of impact fees for projects not listed on Plan.
ยงย 97-14 — Method of payment.
ยงย 97-15 — Credit against impact fee.
ยงย 97-16 — Refunds.
ยงย 97-19 — Retroactive application.
Ch 101 — Improvement Design Standards
Ch 144 — Stormwater Management
Ch 147 — Streets and Sidewalks
Ch 150 — Subdivision and Land Development
ยงย 150-35 — Transportation network.
Ch 162 — Vehicles and Traffic
Ch 175 — Zoning
ยงย 175-68 — Additional building setbacks.
add
Impoundment
134-2{8} — LAGOON SYSTEM
134-2{18} — WATERS OF THIS COMMONWEALTH
144-10B{10} — DAM
144-10B{13} — DETENTION BASIN
144-10B{39} — IMPOUNDMENT
144-10B{54} — PARKING LOT STORAGE
144-10B{70} — RETENTION BASIN
144-10B{107} — WATERS OF THE COMMONWEALTH
Ch 162 Art V — Removal and Impounding of Certain Vehicles
ยงย 162-22 — Authority to remove and impound.
ยงย 162-23 — Designation of approved storage garages; bonding; towing and storage.
ยงย 162-24 — Notification of removal and impounding.
ยงย 162-25 — Effect of payment of towing and storage charges.
ยงย 162-26 — Records of vehicles removed and impounded.
ยงย 164-5 — Enforcement of remedies.
175-8{215} — PUBLIC UTILITY
ยงย 175-14 — Authorized uses.
ยงย 175-21 — Authorized uses.
ยงย 175-117 — Lakes, ponds or water impoundments.
ยงย 175-155.2 — Oil and gas well site development.
ยงย 175-244 — Authorized uses.
add
Improvements
ยงย 1-4 — Legislation saved from repeal; matters not affected by repeal.
ยงย 19-24 — Conditions of agreement.
Ch 65 — Construction Codes, Uniform
Ch 84 — Floodplain Management
ยงย 84-9 — Duties and responsibilities of Floodplain Administrator.
ยงย 84-10 — Application procedures and requirements.
ยงย 84-15 — Start of construction.
ยงย 84-19 — Description and special requirements of identified floodplain areas.
ยงย 84-23 — General.
ยงย 84-24 — Elevation and floodproofing requirements.
ยงย 84-26 — Development which may endanger human life.
ยงย 84-28 — Special requirements for manufactured homes.
ยงย 84-30 — General.
ยงย 84-31 — Existing structures.
ยงย 84-32 — Improvements.
84-36{9} — DEVELOPMENT
84-36{16} — FLOODPROOFING
84-36{24} — NEW CONSTRUCTION
84-36{27} — POST-FIRM STRUCTURE
84-36{28} — PRE-FIRM STRUCTURE
84-36{32} — SPECIAL PERMIT
84-36{33} — START OF CONSTRUCTION
84-36{37} — SUBSTANTIAL IMPROVEMENT
Ch 89 — Grading, Excavation and Fill
89-2{18} — LAND DEVELOPMENT
ยงย 89-8 — Application for permit.
ยงย 89-13 — Performance security.
ยงย 89-22 — General requirements.
Ch 97 — Impact Fees
ยงย 97-2 — Purpose.
ยงย 97-3 — Findings.
97-4{2} — COMPREHENSIVE PLAN
97-4{5} — NEW DEVELOPMENT
97-4{6} — OFF-SITE IMPROVEMENTS
97-4{7} — ON-SITE IMPROVEMENTS
97-4{9} — TRANSPORTATION CAPITAL IMPROVEMENTS
97-4{10} — TRANSPORTATION CAPITAL IMPROVEMENTS PLAN
97-4{11} — TRANSPORTATION SERVICE AREAS
97-4{13} — UNIT COST PER TRIP
ยงย 97-7 — Calculation of impact fee.
ยงย 97-11 — Administration of impact fees.
ยงย 97-12 — Impact Fee Advisory Committee.
ยงย 97-13 — Disbursement of impact fees for projects not listed on Plan.
ยงย 97-15 — Credit against impact fee.
ยงย 97-16 — Refunds.
Ch 101 — Improvement Design Standards
ยงย 101-1 — Title.
ยงย 101-2 — Purpose.
ยงย 101-4 — Applicability.
ยงย 101-5 — Construction of public and private improvements.
ยงย 101-6 — Control of construction of public and private improvements by developers.
ยงย 101-8 — Violations and penalties.
ยงย 101-9 — Stop-work orders.
ยงย 101-10 — Procedure for acceptance of public improvements.
ยงย 101-11 — Amendments.
101-13{1} — AS-BUILT PLAN
101-13{5} — DEVELOPER
101-13{10} — FINANCIAL SECURITY
101-13{14} — PRIVATE IMPROVEMENT
101-13{15} — PUBLIC IMPROVEMENT
Ch 101 Art IV — Construction Standards for Public and Private Improvements
ยงย 101-23 — Underground utility installation.
ยงย 101-24 — Acceptance of public improvements.
120-1{2} — MERCHANDISE OR SERVICES
134-14{2} — IMPROVED PROPERTY
ยงย 134-18 — Exclusiveness of rights and privileges.
ยงย 134-19 — Permits and requirements.
Ch 144 — Stormwater Management
144-10B{42} — LAND DEVELOPMENT (DEVELOPMENT)
ยงย 144-32 — Maintenance responsibilities.
ยงย 144-46 — Expenses covered by fees.
Ch 147 — Streets and Sidewalks
Ch 150 — Subdivision and Land Development
ยงย 150-2 — Purpose.
ยงย 150-3 — Compliance required.
150-7{11} — AS-BUILT PLANS
150-7{21} — COMPREHENSIVE PLAN
150-7{30} — DEVELOPMENT
150-7{33} — DRIVEWAY, COMMON
150-7{34} — DRIVEWAY, PRIVATE
150-7{41} — FINANCIAL SECURITY
150-7{46} — FLOODPROOFING
150-7{50} — IMPROVEMENTS, PRIVATE
150-7{51} — IMPROVEMENTS, PUBLIC
150-7{53} — LAND DEVELOPMENT
150-7{67} — MOBILE HOME LOT
150-7{68} — MOBILE HOME PARK
150-7{88} — STREET, PRIVATE
150-7{93} — SUBSTANTIALLY COMPLETED
150-7{100} — TOWNSHIP IMPROVEMENT DESIGN STANDARDS
ยงย 150-8 — General procedures.
ยงย 150-12 — Final approval procedures.
ยงย 150-14 — Recording of final plat.
ยงย 150-15 — Fee schedule.
ยงย 150-16 — Partial release of improvement security.
ยงย 150-17 — Approval of required improvements; final release of improvement security.
ยงย 150-18 — Remedies to effect completion of improvements.
ยงย 150-19 — Maintenance security.
ยงย 150-20 — Acceptance of public improvements.
ยงย 150-21 — Approval of private improvements.
ยงย 150-22 — Final inspection of public improvements.
ยงย 150-25 — Preliminary application contents.
ยงย 150-26 — Final application contents.
Ch 150 Art V — Required Improvements and/or Fees
ยงย 150-27 — General standards.
ยงย 150-28 — Monuments.
ยงย 150-29 — Public improvements.
ยงย 150-29.1 — Recreation fees.
ยงย 150-32 — Natural features.
ยงย 150-33 — Lots.
ยงย 150-34 — Phased development.
ยงย 150-35 — Transportation network.
ยงย 150-39 — Landscaping; street shade trees.
ยงย 150-43 — Permanent monuments.
ยงย 150-51 — Mobile home lots.
ยงย 150-53 — Preventive remedies.
155-41{10} — REAL ESTATE
155-41{14} — VALUE
Ch 175 — Zoning
175-8{132} — LAND DEVELOPMENT
175-8{164} — MOBILE HOME LOT
175-8{165} — MOBILE HOME PARK
175-8{247} — STREET
ยงย 175-65 — Design standards.
ยงย 175-68 — Additional building setbacks.
ยงย 175-81 — Application for planned residential development final approval.
ยงย 175-92 — Approval of conditional uses; expiration.
ยงย 175-93 — Approval of uses by special exception; expiration.
ยงย 175-123 — Planned industrial parks.
ยงย 175-124 — Planned shopping centers.
ยงย 175-132 — Communication facilities.
ยงย 175-142 — Special yard requirements.
ยงย 175-155.2 — Oil and gas well site development.
ยงย 175-155.10 — Logging and timbering.
A177-1{10} — TOWNSHIP IMPROVEMENT DESIGN STANDARDS
ยงย A177-4 — Conditions on use and occupancy of streets.
ยงย A177-9 — Operation and maintenance.
ยงย A177-27 — Conditions on use and occupancy of streets.
ยงย A177-32 — Operation and maintenance of system.
add
Indemnification
ยงย 175-155.9 — Nontower wireless communication facilities (WCFs).
ยงย A177-13 — Liability and indemnification.
add
Industrial districts
ยงย 175-10 — Enumeration of districts; general concepts.
Ch 175 Art IX — I-1 Restricted Industrial District
ยงย 175-55 — Authorized uses.
ยงย 175-56 — Area and bulk regulations.
ยงย 175-98 — Billboards.
ยงย 175-139 — Performance standards.
ยงย 175-142 — Special yard requirements.
ยงย 175-164 — Signs authorized in commercial and industrial districts.
add
Industrial wastes
65-7{3} — SANITARY SEWER SERVICE LINE
89-2{31} — SOIL WASTE
134-2{3} — COMMUNITY SEWAGE SYSTEM
134-2{7} — INDUSTRIAL WASTE
134-25{11} — SEWAGE
134-25{15} — STORM DRAIN or STORM SEWER
144-10B{91} — STORM SEWER
add
Infestation
ยงย 175-155.7 — Keeping of fowl.
add
Insects
ยงย 150-47 — Stormwater management.
add
Inspections
ยงย 1-12 — Publication of notices.
ยงย 19-30 — Agreement; adopted.
ยงย 65-3 — Methods of administration and enforcement.
ยงย 84-9 — Duties and responsibilities of Floodplain Administrator.
ยงย 84-24 — Elevation and floodproofing requirements.
ยงย 89-12 — Permit and fees.
ยงย 89-14 — Inspections.
ยงย 101-6 — Control of construction of public and private improvements by developers.
101-13{9} — ENGINEER
134-2{13} — SEWAGE ENFORCEMENT OFFICER
ยงย 134-18 — Exclusiveness of rights and privileges.
134-25{2} — AUTHORITY INSEPCTOR
ยงย 134-33 — Inspectors.
ยงย 144-23 — SWM site plan and report contents.
ยงย 144-29 — Record drawings; completion certificate; final inspection.
ยงย 144-30 — Easements.
ยงย 144-31 — Financial guarantee.
ยงย 144-32 — Maintenance responsibilities.
Ch 144 Art XI — Inspections
ยงย 144-34 — Schedule of inspections.
ยงย 144-35 — Right-of-entry.
ยงย 144-37 — Enforcement.
ยงย 144-39 — Suspension and revocation.
ยงย 144-46 — Expenses covered by fees.
150-7{52} — INSPECTOR
ยงย 150-8 — General procedures.
ยงย 150-15 — Fee schedule.
ยงย 150-17 — Approval of required improvements; final release of improvement security.
ยงย 150-20 — Acceptance of public improvements.
ยงย 150-22 — Final inspection of public improvements.
ยงย 155-20 — Powers and duties of officer.
ยงย 155-36 — Violations and penalties.
164-2{2} — INOPERABLE
ยงย 164-4 — Exemptions.
168-2A{2} — INSPECTOR
175-8{129} — JUNK VEHICLE
ยงย 175-98 — Billboards.
ยงย 175-115 — Junkyards.
ยงย 175-118 — Landfills or resource recovery facilities.
ยงย 175-119 — Mineral removal.
ยงย 175-127.2 — Short-term rentals.
ยงย 175-155.9 — Nontower wireless communication facilities (WCFs).
ยงย 175-155.10 — Logging and timbering.
ยงย 175-161 — General regulations.
ยงย 175-164 — Signs authorized in commercial and industrial districts.
ยงย 175-177 — Conduct of hearings.
ยงย 175-183 — Zoning Officer.
ยงย 175-185 — Building permits.
ยงย 175-186 — Certificates of occupancy.
ยงย A177-4 — Conditions on use and occupancy of streets.
ยงย A177-5 — Fees and reports.
ยงย A177-10 — Service standards.
ยงย A177-27 — Conditions on use and occupancy of streets.
ยงย A177-28 — Fees and reports.
add
Insurance
ยงย 19-14 — Remuneration of officers.
ยงย 19-28 — Funding; powers.
ยงย 19-31 — Purpose.
ยงย 19-38 — Power to enter into contracts.
ยงย 19-43 — Findings and determinations.
ยงย 84-7 — Designation of Floodplain Administrator.
ยงย 84-9 — Duties and responsibilities of Floodplain Administrator.
ยงย 84-18 — Identification.
ยงย 84-34 — Variance procedures and conditions.
84-36{4} — BASE FLOOD ELEVATION (BFE)
84-36{13} — FLOOD INSURANCE RATE MAP (FIRM)
84-36{14} — FLOOD INSURANCE STUDY (FIS)
84-36{20} — IDENTIFIED FLOODPLAIN AREA
84-36{27} — POST-FIRM STRUCTURE
84-36{28} — PRE-FIRM STRUCTURE
Ch 103 — Insurance
Ch 103 Art I — Fire Insurance Claims
ยงย 103-1 — Use of fire insurance proceeds.
ยงย 103-2 — Limits of liability.
ยงย 103-3 — Insurance company rights reserved.
ยงย 103-6 — Violations and penalties.
ยงย 140-4 — Separation of recyclables and placement for disposal.
144-10B{30} — FLOODPLAIN
144-10B{31} — FLOODWAY
150-7{43} — FLOOD INSURANCE STUDY
ยงย 155-20 — Powers and duties of officer.
ยงย 162-23 — Designation of approved storage garages; bonding; towing and storage.
175-8{181} — OFFICES, BUSINESS AND PROFESSIONAL
ยงย 175-92 — Approval of conditional uses; expiration.
ยงย 175-103 — Collection and recycling facilities.
ยงย 175-112 — Hazardous waste disposal, treatment, transportation or storage.
ยงย 175-119 — Mineral removal.
ยงย 175-155.2 — Oil and gas well site development.
ยงย 175-155.3 — Natural gas compressor station and natural gas processing plant.
ยงย 175-155.9 — Nontower wireless communication facilities (WCFs).
ยงย A177-4 — Conditions on use and occupancy of streets.
ยงย A177-13 — Liability and indemnification.
ยงย A177-36 — Insurance.
ยงย DL-1 — Disposition of legislation.
add
Investigations
ยงย 15-2 — Authorized activities.
ยงย 89-17 — Fills.
134-2{13} — SEWAGE ENFORCEMENT OFFICER
ยงย 144-23 — SWM site plan and report contents.
ยงย 155-20 — Powers and duties of officer.
ยงย 155-22 — Interest and penalties.
ยงย 155-27 — Exemption and refunds.
175-8{223} — RESEARCH AND DEVELOPMENT
ยงย 175-96 — Adult businesses.
ยงย 175-139 — Performance standards.
ยงย A177-10 — Service standards.
ยงย A177-33 — Service standards.