Index: C
Camping
ยงย 62-7—
Fees for permits and applications.
ยงย 71-3—
Applicability.
115-4B{166}—
TENTING AREA
ยงย 115-21—
Permitted accessory uses.
ยงย 115-22—
Conditional uses.
ยงย 115-30—
Permitted accessory uses.
ยงย 115-39—
Conditional uses.
ยงย 115-54—
Permitted accessory uses.
ยงย 115-87—
Conditional uses.
115-141.2{32}—
RECREATIONAL VEHICLE
ยงย 115-172—
Special requirements.
ยงย 115-185—
Accessory buildings and structures.
Camps
ยงย 62-7—
Fees for permits and applications.
ยงย 71-3—
Applicability.
115-4B{166}—
TENTING AREA
ยงย 115-21—
Permitted accessory uses.
ยงย 115-22—
Conditional uses.
ยงย 115-30—
Permitted accessory uses.
ยงย 115-39—
Conditional uses.
ยงย 115-54—
Permitted accessory uses.
ยงย 115-87—
Conditional uses.
115-141.2{32}—
RECREATIONAL VEHICLE
ยงย 115-172—
Special requirements.
ยงย 115-185—
Accessory buildings and structures.
Campsites
Carnivals
ยงย 115-20—
Permitted uses.
ยงย 115-22—
Conditional uses.
ยงย 115-39—
Conditional uses.
ยงย 115-69—
Permitted uses.
ยงย 115-71—
Conditional uses.
ยงย 115-77—
Permitted uses.
ยงย 115-79—
Conditional uses.
ยงย 115-83.2—
Permitted uses.
ยงย 115-83.5—
Conditional uses.
ยงย 115-85—
Permitted uses.
ยงย 115-87—
Conditional uses.
ยงย 115-219—
Site plan review required for certain uses.
Cats
Cemeteries
ยงย 115-22—
Conditional uses.
ยงย 115-23—
Special use exceptions.
ยงย 115-31—
Conditional uses.
ยงย 115-32—
Special use exceptions.
ยงย 115-39—
Conditional uses.
ยงย 115-40—
Special use exceptions.
ยงย 115-48—
Special use exceptions.
ยงย 115-55—
Conditional uses.
ยงย 115-56—
Special use exceptions.
ยงย 115-64—
Special use exceptions.
ยงย 115-71—
Conditional uses.
ยงย 115-72—
Special use exceptions.
ยงย 115-75.2—
Permitted uses.
ยงย 115-79—
Conditional uses.
ยงย 115-80—
Special use exceptions.
ยงย 115-83.5—
Conditional uses.
ยงย 115-83.6—
Special use exceptions.
ยงย 115-83.40—
Permitted uses.
ยงย 115-88—
Special use exceptions.
ยงย 115-97—
Special use exceptions.
ยงย 115-105—
Special use exceptions.
ยงย 115-114—
Special use exceptions.
ยงย 115-172—
Special requirements.
ยงย 115-210—
Special exceptions.
Certificates of compliance
ยงย 72-29—
Government regulations; enforcement.
ยงย 99-29—
Minimum installation requirements.
115-4B{32}—
CERTIFICATE OF COMPLIANCE
ยงย 115-77.1—
Large-scale uses.
ยงย 115-83.3—
Large-scale uses.
ยงย 115-190—
Restrictions on issuance of certificates of compliance.
ยงย 115-191—
Parking, storing and maintaining of vehicles and trailers.
ยงย 115-223—
Certificate of compliance.
Certificates of insurance
Certificates of occupancy
ยงย 52-28—
Inspections.
ยงย 52-29—
Certificates of occupancy.
ยงย 62-8—
Filing of application; inspection fee.
ยงย 73-27—
Display of address numbers required; display.
ยงย 90-5—
Plan required for building permit.
ยงย 99-31—
Inspections; closeout procedures; fees.
ยงย 99-36—
Restrictions on issuance of building permit and certificate of occupancy.
ยงย 103-18—
Definitions.
ยงย 115-141.3—
Administration.
ยงย 115-165—
Joint use and off-site facilities.
ยงย 115-224—
Permits.
Cesspools
Charges
ยงย 29-24—
Sick leave.
ยงย 45-8—
Enforcement, violations and penalties; instances of noncompliance regarding building accessibility.
ยงย 45-9—
Enforcement; violations and penalties; instances of noncompliance with requirements regarding parking for disabled persons.
ยงย 52-14—
Liability.
ยงย 52-24—
Review and inspection fees.
ยงย 59-3—
Funding.
ยงย 60-2—
Fees for dog and kennel licenses; terms; violations and penalties.
ยงย 60-5—
Licensing agents; bond requirement; service charge; regulations.
ยงย 60-7—
Authority to establish rules and regulations and administrative fees.
ยงย 62-1—
Enumeration of fees.
ยงย 62-4—
Fees charged at time of filing.
ยงย 62-7—
Fees for permits and applications.
ยงย 62-8—
Filing of application; inspection fee.
ยงย 62-10—
Late charges.
ยงย 62-15—
Enumeration of fees.
ยงย 62-16—
Enumeration of fees.
ยงย 62-18—
Enumeration of fees.
71-6B{5}—
CODE OFFICIAL
71-6B{11}—
ENFORCEMENT OFFICER
71-6B{26}—
OPERATOR
ยงย 71-22—
Administrative liability.
ยงย 71-25—
Powers and duties of Code Official.
ยงย 71-26—
Condemnation.
ยงย 71-32—
Demolition orders.
ยงย 72-10—
Initial sale of new MPHUs.
ยงย 72-23—
SCRP Agreements.
ยงย 72-24—
SCRP Units.
ยงย 73-29.1—
Violations and penalties; start of enforcement.
ยงย 80-4—
Enforcement.
ยงย 91-4—
License fees; license period.
ยงย 91-8—
Charges for depositing solid waste at county facilities.
ยงย 91-9—
Restrictions and special requirements.
ยงย 95-2—
Preparation of petition form.
ยงย 95-4—
Action following receipt of petition.
ยงย 96-3—
Preparation of petition form.
ยงย 96-5—
Action following receipt of petition.
ยงย 96-11—
Assessments; district limits; establishment of separate account.
ยงย 99-14—
Fees.
ยงย 103-16—
Collection charge.
ยงย 103-18—
Definitions.
ยงย 103-41—
Late penalty; abatement.
110-1A{24}—
ENGINEER
ยงย 110-15—
Pretreatment.
ยงย 110-23—
Purpose.
ยงย 110-24—
Authorization for fees.
ยงย 110-29—
Permit conditions.
ยงย 110-55—
Discontinuance of service.
ยงย 110-56—
Public fire hydrants.
ยงย 110-57—
Private fire service.
ยงย 110-58—
Water meter testing.
ยงย 110-67—
Protection of potable water supply.
ยงย 110-80—
Conveyance of title and interest to County.
ยงย 110-83—
System connection charge.
ยงย 110-86—
Property exempt from assessment.
Ch 110 Art XIII—
Service Charges
ยงย 110-88—
Establishment of annual service charges; determination of amount of charge.
ยงย 110-89—
Basis for water service charge.
ยงย 110-90—
Basis for sewer service charge.
ยงย 110-91—
Collection of service charges.
ยงย 110-92—
Failure to pay charges when due.
ยงย 110-93—
Additional sewer laterals or water services.
ยงย 110-94—
Appeals to Board of Assessment Review.
115-4B{82}—
HOTEL
ยงย 115-160—
General regulations for all districts.
ยงย 115-165—
Joint use and off-site facilities.
ยงย 115-207—
Establishment membership; officers; meetings.
ยงย 116-2—
Enumeration of required current obligations.
ยงย DL-1—
Disposition of legislation.
Churches
45-4{2}—
ASSEMBLY OCCUPANCY
ยงย 110-88—
Establishment of annual service charges; determination of amount of charge.
ยงย 115-19—
Purpose.
ยงย 115-20—
Permitted uses.
ยงย 115-28—
Purpose.
ยงย 115-29—
Permitted uses.
ยงย 115-53—
Permitted uses.
ยงย 115-126—
Number of dwelling units permitted.
115-157.1B{3}—
DIRECTIONAL SIGN
ยงย 115-159.1—
Signs permitted in AR-1 and AR-2 Agricultural Residential Districts and GR General Residential Districts.
ยงย 115-159.2—
Signs permitted in MR Medium Density Residential and UR Urban Residential Districts.
ยงย 115-159.4—
Signs permitted in B-1 Neighborhood Business Districts, B-2 Business Community Districts, B-3 Business Research Districts, M Marine Districts and UB Urban Business Districts.
ยงย 115-159.5—
Signs permitted in C-1 General Commercial, CR-1 Commercial Residential, C-2 Medium Commercial, C-3 Heavy Commercial, C-4 Planned Commercial, C-5 Service Limited Manufacturing, I-1 Institutional, LI-1 Limited Industrial, and HI-1 Heavy Industrial Districts.
ยงย 115-162—
Requirements.
ยงย 115-172—
Special requirements.
ยงย 115-179—
Height regulations.
ยงย 115-219—
Site plan review required for certain uses.
Citations
Cluster developments
Combustibles
Commercial districts
ยงย 89-7—
Excellent groundwater recharge areas.
115-4B{51}—
DISTRICT, COMMERCIAL
ยงย 115-5—
Districts established.
ยงย 115-6—
References to district names.
Ch 115 Art XI—
C-1 General Commercial District
ยงย 115-77.1—
Large-scale uses.
ยงย 115-83—
Reference to additional regulations.
Ch 115 Art XIB—
C-2 Medium Commercial District
Ch 115 Art XIC—
C-3 Heavy Commercial District
Ch 115 Art XID—
C-4 Planned Commercial District
ยงย 115-83.25—
Minimum district requirements.
ยงย 115-102—
Permitted uses.
ยงย 115-166.1—
Parking lot landscaping.
ยงย 115-170.1—
Screening of loading areas.
ยงย 115-178—
Height, area and bulk requirements for mixed uses.
ยงย 115-183—
Side and rear yards.
ยงย 115-210—
Special exceptions.
ยงย 115-218—
Procedure for RPC District, C-4 Planned Commercial District and conditional use site plan approval.
Commercial vehicles
Communicable diseases
Compensation
Ch 26—
Pensions
ยงย 26-3—
Allowable interruptions.
ยงย 26-5—
Arbitration Commission.
ยงย 26-6—
Eligibility.
ยงย 26-7—
Computation of benefits.
ยงย 26-9—
Funding.
Ch 27—
Post-Employment Benefit Plan
ยงย 27-6—
Arbitration Commission.
Ch 29—
Personnel
ยงย 29-2—
Policy statement.
ยงย 29-5—
Personnel Board.
ยงย 29-9—
Preparation of pay plan.
ยงย 29-10—
Appointments, promotions and veterans' preference.
ยงย 29-15—
Conditions for continued employment; disciplinary action; resignations; demotions.
ยงย 29-24—
Sick leave.
ยงย 29-31A—
Short-term and long-term disability benefits.
ยงย 29-34—
Compensation for part-time work.
ยงย 29-35—
Compensation for overtime and holiday work.
Ch 35—
Salaries and Compensation
ยงย 52-1—
Adoption of standards; exemptions.
ยงย 62-15—
Enumeration of fees.
71-6B{9}—
DWELLINGS
ยงย 110-67—
Protection of potable water supply.
ยงย 110-83—
System connection charge.
ยงย 110-111—
Licensing and insurance requirements.
115-4B{63}—
FAMILY DAY-CARE HOME
115-4B{82}—
HOTEL
115-4B{108}—
MOTEL, MOTOR COURT, TOURIST COURT or MOTOR LODGE
115-4B{142}—
RIDING ACADEMY
115-141.2{22}—
FREEBOARD
Comprehensive Plan
ยงย 72-4—
Declaration of public policy.
72-5{19}—
QUALIFYING LAND
ยงย 72-14—
Phased implementation of provisions; test period.
ยงย 72-18—
Declaration of public policy.
99-5{33}—
MINOR SUBDIVISION
ยงย 99-8—
Submission of preliminary plat.
ยงย 99-15—
General requirements and restrictions.
ยงย 99-21—
Public sites and open spaces.
ยงย 99-33—
Unusual conditions.
ยงย 115-3—
Purpose.
ยงย 115-20—
Permitted uses.
ยงย 115-22—
Conditional uses.
ยงย 115-25—
Height, area and bulk requirements.
ยงย 115-29—
Permitted uses.
ยงย 115-37—
Permitted uses.
ยงย 115-45—
Permitted uses.
ยงย 115-53—
Permitted uses.
ยงย 115-83.24—
Purpose.
ยงย 115-83.25—
Minimum district requirements.
ยงย 115-118—
Purpose.
ยงย 115-125—
Review standards; conditions.
ยงย 115-132—
Purpose.
ยงย 115-136—
Review standards; conditions.
ยงย 115-141.7—
Variances.
ยงย 115-171—
Purpose.
ยงย 115-173—
Preliminary site plan.
ยงย 115-194.3—
Coastal Area.
ยงย 115-219—
Site plan review required for certain uses.
Conditional uses
ยงย 62-7—
Fees for permits and applications.
71-6B{33}—
PUBLIC NUISANCE
ยงย 80-6—
Withholding of permits and approvals.
ยงย 89-7—
Excellent groundwater recharge areas.
ยงย 89-12—
Exemptions.
ยงย 99-40—
Sunsetting of major subdivision approval.
ยงย 115-20—
Permitted uses.
ยงย 115-22—
Conditional uses.
ยงย 115-26—
Reference to additional regulations.
ยงย 115-31—
Conditional uses.
ยงย 115-35—
Reference to additional regulations.
ยงย 115-39—
Conditional uses.
ยงย 115-43—
Reference to additional regulations.
ยงย 115-47—
Conditional uses.
ยงย 115-51—
Reference to additional regulations.
ยงย 115-55—
Conditional uses.
ยงย 115-59—
Reference to additional regulations.
ยงย 115-63—
Conditional uses.
ยงย 115-67—
Reference to additional regulations.
ยงย 115-69—
Permitted uses.
ยงย 115-71—
Conditional uses.
ยงย 115-77—
Permitted uses.
ยงย 115-79—
Conditional uses.
ยงย 115-83—
Reference to additional regulations.
ยงย 115-83.2—
Permitted uses.
ยงย 115-83.5—
Conditional uses.
ยงย 115-83.9—
Reference to additional regulations.
ยงย 115-85—
Permitted uses.
ยงย 115-87—
Conditional uses.
ยงย 115-91—
Reference to additional regulations.
ยงย 115-96—
Conditional uses.
ยงย 115-100—
Reference to additional regulations.
ยงย 115-104—
Conditional uses.
ยงย 115-108—
Reference to additional regulations.
ยงย 115-113—
Conditional uses.
ยงย 115-117—
Reference to additional regulations.
ยงย 115-119—
Permitted uses.
ยงย 115-156—
Requirements.
ยงย 115-160—
General regulations for all districts.
ยงย 115-161.1—
Electronic message centers.
ยงย 115-163—
Interpretation of requirements.
ยงย 115-168—
Interpretation of requirements; modification of requirements.
Ch 115 Art XXIV—
Conditional Uses
ยงย 115-172—
Special requirements.
ยงย 115-173—
Preliminary site plan.
ยงย 115-174—
Period of validity of approval.
ยงย 115-175—
Preexisting uses.
ยงย 115-176—
Revocation of permits.
ยงย 115-191.5—
Withholding of permits and approvals.
ยงย 115-193—
Resource protection.
ยงย 115-194.3—
Coastal Area.
ยงย 115-194.5—
Solar facilities.
ยงย 115-217—
Procedure for RPC District and conditional use approval.
ยงย 115-218—
Procedure for RPC District, C-4 Planned Commercial District and conditional use site plan approval.
ยงย 115-219—
Site plan review required for certain uses.
ยงย 115-222—
Amendments and additions to site plans.
ยงย 115-226—
Fees.
ยงย 116-3—
Issuance of approvals dependent upon payment of obligations.
ยงย 116-4—
Procedure.
Confidentiality
Conflicts of interest
Conservation districts
ยงย 89-6—
Wellhead protection areas.
ยงย 90-5—
Plan required for building permit.
ยงย 90-6—
Suspension and revocation of permit.
99-5{4}—
BULK GRADING PLAN
ยงย 99-16—
Suitability of land; preservation of natural features.
ยงย 99-18—
Street design standards.
ยงย 99-26—
Information to be shown.
115-4B{28}—
BULK GRADING PLAN
ยงย 115-193—
Resource protection.
Construction
Ch 15—
Fire Companies
ยงย 15-4—
Imposition of surcharge.
Ch 45—
Architectural Accessibility
ยงย 45-2—
Applicability.
ยงย 45-3—
Purpose.
45-4{1}—
ARCHITECTURAL ACCESSIBILITY
ยงย 45-5—
Minimum requirements.
ยงย 45-7—
Building permit requirements.
Ch 52—
Building Construction
ยงย 52-1—
Adoption of standards; exemptions.
ยงย 52-3—
Code to be remedial.
ยงย 52-4—
Scope and effect.
ยงย 52-5—
Effect on existing buildings.
ยงย 52-6—
Effect on historic structures.
ยงย 52-8—
Restrictions on employees.
ยงย 52-10—
Right of entry.
ยงย 52-13—
Alternate materials and methods.
ยงย 52-16—
Permit required.
ยงย 52-18—
Drawings and specifications.
ยงย 52-20—
Examination of permits and drawings.
ยงย 52-21—
Action on permit application.
ยงย 52-22—
Time limit for action on application; effect of permit issuance; time for commencement of work; review fee.
ยงย 52-24—
Review and inspection fees.
ยงย 52-25—
Failure to obtain a permit.
ยงย 52-28—
Inspections.
ยงย 52-31—
Appeals.
ยงย 60-4—
Specifications for humane handling, care and treatment of dogs.
Ch 62—
Fees
ยงย 62-2—
Enumeration of fees.
62-6{2}—
CONSTRUCTION
ยงย 62-7—
Fees for permits and applications.
ยงย 62-8—
Filing of application; inspection fee.
Ch 71—
Housing Standards
ยงย 71-5—
Effect on other requirements and rights, exemptions and exceptions.
71-6B{1}—
APPROVED
71-6B{21}—
MAINTENANCE
71-6B{33}—
PUBLIC NUISANCE
71-6B{39}—
STRUCTURE
ยงย 71-11—
Condition of premises.
ยงย 71-12—
Exterior of structures.
ยงย 71-13—
Interior of structures.
ยงย 71-15—
Plumbing facilities and fixtures.
ยงย 71-23—
Conflicts of interest.
71-26B{3}—
UNSAFE STRUCTURE
ยงย 71-30—
Violations and penalties.
ยงย 71-32—
Demolition orders.
ยงย 71-33—
Creation of tax liens.
ยงย 72-4—
Declaration of public policy.
72-5{1}—
APPLICANT
72-5{17}—
MODERATELY PRICED HOUSING UNIT (MPHU)
ยงย 72-8—
MPHU agreements.
ยงย 72-10—
Initial sale of new MPHUs.
ยงย 72-15—
Government regulations; enforcement.
ยงย 72-18—
Declaration of public policy.
72-19{1}—
APPLICANT
72-19{9}—
DWELLING
72-19{16}—
SUSSEX COUNTY RENTAL PROGRAM UNIT (SCRP UNIT)
ยงย 72-23—
SCRP Agreements.
ยงย 72-25—
Leasing of SCRP Units.
ยงย 72-29—
Government regulations; enforcement.
ยงย 73-4—
Streets requiring naming.
ยงย 73-20—
Description of signs.
ยงย 73-26—
Addressing new construction and development.
ยงย 80-4—
Enforcement.
89-4{25}—
STORMWATER MANAGEMENT
89-4{28}—
WELL
ยงย 89-6—
Wellhead protection areas.
ยงย 89-7—
Excellent groundwater recharge areas.
Ch 90—
Sediment Control and Stormwater Management
ยงย 90-6—
Suspension and revocation of permit.
91-2A{3}—
CONSTRUCTION WASTES
Ch 95—
Streetlighting
ยงย 95-2—
Preparation of petition form.
ยงย 95-3—
Restrictions on voting and petitions.
96-1{1}—
COMMUNITY IMPROVEMENTS
ยงย 96-9—
Acquisition of rights-of-way.
ยงย 96-10—
Maintenance of improvements.
Ch 99—
Subdivision of Land
99-5{19}—
FORESTED AND/OR LANDSCAPED BUFFER STRIP
99-5{20}—
INDIVIDUAL LOT GRADING PLAN
99-5{26}—
LOT GRADING CERTIFICATE
99-5{34}—
NONTIDAL WETLANDS
99-5{53}—
TECHNICAL ADVISORY COMMITTEE
ยงย 99-6—
General requirements and restrictions.
ยงย 99-18—
Street design standards.
ยงย 99-23—
Information to be shown.
ยงย 99-25—
General requirements.
ยงย 99-26—
Information to be shown.
ยงย 99-28—
Required improvements.
ยงย 99-29—
Minimum installation requirements.
ยงย 99-30—
Plans.
ยงย 99-31—
Inspections; closeout procedures; fees.
ยงย 99-32—
Bonds and guaranties.
ยงย 99-36—
Restrictions on issuance of building permit and certificate of occupancy.
ยงย 99-40—
Sunsetting of major subdivision approval.
ยงย 103-18—
Definitions.
Ch 110—
Water and Sewers
110-1A{43}—
NEW SOURCE
110-1A{59}—
SEPTIC TANK
110-1A{70}—
TRAP
ยงย 110-4—
Use of privies, privy vaults, septic tanks and cesspools.
ยงย 110-9—
Separate building sewers required.
ยงย 110-11—
Materials and methods.
ยงย 110-24—
Authorization for fees.
ยงย 110-27—
Permit application.
ยงย 110-33—
Monitoring structures and devices.
ยงย 110-35—
Pretreatment requirements.
ยงย 110-50—
Materials and methods for connection.
ยงย 110-72—
Right of entry.
ยงย 110-77—
Authorization for extensions; responsibility for costs.
ยงย 110-78—
Sewer system design and easements acquisition.
ยงย 110-79—
Project construction agreement.
ยงย 110-80—
Conveyance of title and interest to County.
ยงย 110-82—
Annual assessment fees.
ยงย 110-83—
System connection charge.
ยงย 110-87—
Adjustment of assessment.
ยงย 110-88—
Establishment of annual service charges; determination of amount of charge.
ยงย 110-93—
Additional sewer laterals or water services.
ยงย 110-97—
Requirement of infrastructure use agreements.
ยงย 110-115—
Purpose.
ยงย 110-118—
Review of request.
ยงย 110-126—
Tier descriptions.
Ch 115—
Zoning
ยงย 115-4—
Definitions and word usage.
115-4B{18}—
BIOTECH CAMPUS
115-4B{34}—
CLINIC, MEDICAL
115-4B{43}—
CONSTRUCTION, STARTING OF
115-4B{55}—
DWELLING
115-4B{74}—
GRADING CERTIFICATE
115-4B{83}—
INDIVIDUAL SITE GRADING PLAN
115-4B{102}—
MANUFACTURED HOME (a.k.a. HOUSE TRAILER, SINGLE-WIDE, DOUBLE-WIDE, MOBILE HOME)
115-4B{106}—
MARINE CONTRACTING
115-4B{110}—
NONTIDAL WETLANDS
115-4B{125}—
PLACE OF WORSHIP
115-4B{149}—
SHOPPING CENTER
115-4B{159}—
STRUCTURE
115-4B{163}—
TECHNICAL ADVISORY COMMITTEE
ยงย 115-14—
Construction of accessory buildings prior to main building.
ยงย 115-21—
Permitted accessory uses.
ยงย 115-22—
Conditional uses.
ยงย 115-23—
Special use exceptions.
ยงย 115-25—
Height, area and bulk requirements.
ยงย 115-28—
Purpose.
ยงย 115-30—
Permitted accessory uses.
ยงย 115-39—
Conditional uses.
ยงย 115-40—
Special use exceptions.
ยงย 115-48—
Special use exceptions.
ยงย 115-54—
Permitted accessory uses.
ยงย 115-56—
Special use exceptions.
ยงย 115-64—
Special use exceptions.
ยงย 115-70—
Permitted accessory uses.
ยงย 115-72—
Special use exceptions.
ยงย 115-75.3—
Permitted accessory uses.
ยงย 115-75.4—
Special use exceptions.
ยงย 115-75.10—
Permitted accessory uses.
ยงย 115-75.11—
Special use exceptions.
ยงย 115-80—
Special use exceptions.
ยงย 115-83.6—
Special use exceptions.
ยงย 115-83.12—
Permitted accessory uses.
ยงย 115-83.13—
Special use exceptions.
ยงย 115-83.19—
Permitted accessory uses.
ยงย 115-83.20—
Special use exceptions.
ยงย 115-83.25—
Minimum district requirements.
ยงย 115-83.27—
Permitted accessory uses.
ยงย 115-83.28—
Special use exceptions.
ยงย 115-83.34—
Permitted accessory uses.
ยงย 115-83.35—
Special use exceptions.
ยงย 115-83.41—
Permitted accessory uses.
ยงย 115-83.42—
Special use exceptions.
ยงย 115-84—
Purpose.
ยงย 115-88—
Special use exceptions.
ยงย 115-93—
Special conditions.
ยงย 115-95—
Permitted accessory uses.
ยงย 115-96—
Conditional uses.
ยงย 115-97—
Special use exceptions.
ยงย 115-103—
Permitted accessory uses.
ยงย 115-104—
Conditional uses.
ยงย 115-105—
Special use exceptions.
ยงย 115-110—
Permitted uses.
ยงย 115-112—
Permitted accessory uses.
ยงย 115-113—
Conditional uses.
ยงย 115-114—
Special use exceptions.
ยงย 115-130—
Schedule of construction.
ยงย 115-141.1—
General provisions.
115-141.2{7}—
BREAKAWAY WALL
115-141.2{15}—
FLOOD-DAMAGE-RESISTANT MATERIALS
115-141.2{24}—
HIGHEST ADJACENT GRADE
115-141.2{30}—
NEW CONSTRUCTION
115-141.2{34}—
START OF CONSTRUCTION
115-141.2{37}—
SUBSTANTIAL IMPROVEMENT
ยงย 115-141.3—
Administration.
ยงย 115-141.4—
Requirements in all special flood hazard areas.
ยงย 115-141.5—
Requirements in special flood hazard areas other than coastal high-hazard areas.
ยงย 115-141.6—
Requirements in coastal high-hazard areas.
ยงย 115-141.7—
Variances.
ยงย 115-141.8—
Enforcement.
115-145{11}—
LARGER-THAN-UTILITY RUNWAY
115-145{20}—
STRUCTURE
115-145{23}—
UTILITY RUNWAY
ยงย 115-147—
Height limitations.
ยงย 115-149—
Nonconforming uses.
ยงย 115-150—
Permits and variances.
ยงย 115-159—
Signs permitted in all districts.
ยงย 115-160—
General regulations for all districts.
ยงย 115-161—
Construction and lighting.
ยงย 115-170.1—
Screening of loading areas.
ยงย 115-172—
Special requirements.
ยงย 115-174—
Period of validity of approval.
ยงย 115-183—
Side and rear yards.
ยงย 115-185—
Accessory buildings and structures.
ยงย 115-186—
Boathouses, docks and piers.
ยงย 115-187—
Manufactured homes.
ยงย 115-189—
Coastal area protection.
ยงย 115-191.4—
Exemptions.
ยงย 115-194.4—
Wind turbines.
ยงย 115-195—
Construction of preexisting uses.
ยงย 115-210—
Special exceptions.
ยงย 115-211—
Variances.
ยงย 115-212—
Conditions attached to approvals.
ยงย 115-213—
Lapse of special exception or variance.
ยงย 115-218—
Procedure for RPC District, C-4 Planned Commercial District and conditional use site plan approval.
ยงย 115-220—
Preliminary site plan requirements.
ยงย 115-221—
Final site plan requirements.
ยงย 115-224—
Permits.
ยงย 115-225—
Drawings or plats.
ยงย 115-227—
Interpretation.
ยงย 115-228—
Enforcement.
Ch 116—
Enforcement of County Obligations
ยงย DL-1—
Disposition of legislation.
Construction permits
Construction signs
Convalescent homes
ยงย 71-3—
Applicability.
115-4B{43}—
CONSTRUCTION, STARTING OF
115-4B{80}—
HOME OCCUPATION[Amended 7-28-1992 by Ord. No. 847]
115-4B{112}—
NURSING HOME
ยงย 115-23—
Special use exceptions.
ยงย 115-72—
Special use exceptions.
ยงย 115-80—
Special use exceptions.
ยงย 115-83.6—
Special use exceptions.
ยงย 115-88—
Special use exceptions.
ยงย 115-162—
Requirements.
ยงย 115-210—
Special exceptions.
Costs and expenses
ยงย 15-5—
Accounting for grant funds.
ยงย 26-6—
Eligibility.
ยงย 26-7—
Computation of benefits.
ยงย 26-9—
Funding.
ยงย 27-7—
Eligibility for benefits.
ยงย 29-15—
Conditions for continued employment; disciplinary action; resignations; demotions.
ยงย 29-21—
Part-time employment.
ยงย 29-30—
Special leaves of absence.
ยงย 52-24—
Review and inspection fees.
ยงย 52-27—
Building permit fees.
ยงย 59-1—
Creation of 911 Emergency Reporting System Fund.
ยงย 59-3—
Funding.
ยงย 62-1—
Enumeration of fees.
ยงย 62-2—
Enumeration of fees.
ยงย 62-5—
Deposit in guaranty.
ยงย 62-15—
Enumeration of fees.
ยงย 71-20—
Extermination.
ยงย 71-26—
Condemnation.
ยงย 71-32—
Demolition orders.
ยงย 72-3—
Governmental findings.
ยงย 72-4—
Declaration of public policy.
72-5{12}—
EXCESS PROCEEDS
ยงย 72-7—
Density incentive; other incentives.
ยงย 72-8—
MPHU agreements.
ยงย 72-9—
Maximum sale prices of new MPHUs.
ยงย 72-10—
Initial sale of new MPHUs.
ยงย 72-11—
Resale of MPHUs.
ยงย 72-13—
Defaults and foreclosures.
ยงย 72-17—
Governmental findings.
72-19{12}—
EXPEDITED REVIEW
ยงย 72-23—
SCRP Agreements.
ยงย 72-29—
Government regulations; enforcement.
ยงย 73-29.1—
Violations and penalties; start of enforcement.
ยงย 80-4—
Enforcement.
ยงย 80-6—
Withholding of permits and approvals.
ยงย 89-2—
Preface.
ยงย 91-9—
Restrictions and special requirements.
ยงย 95-2—
Preparation of petition form.
ยงย 95-4—
Action following receipt of petition.
ยงย 95-6—
Assessments, district limits, establishment of separate account.
ยงย 95-7—
Modifications, termination of district.
ยงย 96-3—
Preparation of petition form.
ยงย 96-5—
Action following receipt of petition.
ยงย 96-11—
Assessments; district limits; establishment of separate account.
ยงย 99-7—
Preliminary conference.
ยงย 99-14—
Fees.
ยงย 99-29—
Minimum installation requirements.
ยงย 99-31—
Inspections; closeout procedures; fees.
ยงย 99-32—
Bonds and guaranties.
ยงย 99-39—
Appeals.
ยงย 103-18—
Definitions.
ยงย 103-21—
Payment from proceeds of judicial sale.
ยงย 103-29—
Use of funds by Sussex County.
ยงย 110-5—
Connection to public sewer required.
ยงย 110-8—
Expenses and indemnification.
ยงย 110-15—
Pretreatment.
ยงย 110-17—
Maintenance of pretreatment structures and equipment.
ยงย 110-22—
Accidental discharge protection and procedures.
ยงย 110-23—
Purpose.
ยงย 110-24—
Authorization for fees.
ยงย 110-33—
Monitoring structures and devices.
ยงย 110-35—
Pretreatment requirements.
ยงย 110-42—
Connection required.
ยงย 110-44—
Permit application.
ยงย 110-48—
Responsibility for costs of connection; indemnification of County.
ยงย 110-54—
Water meters.
ยงย 110-57—
Private fire service.
ยงย 110-58—
Water meter testing.
ยงย 110-67—
Protection of potable water supply.
ยงย 110-75—
Liability for expenses caused by violation.
ยงย 110-77—
Authorization for extensions; responsibility for costs.
ยงย 110-78—
Sewer system design and easements acquisition.
ยงย 110-79—
Project construction agreement.
ยงย 110-83—
System connection charge.
ยงย 110-87—
Adjustment of assessment.
ยงย 110-93—
Additional sewer laterals or water services.
ยงย 110-97—
Requirement of infrastructure use agreements.
ยงย 110-109—
Violations and penalties.
ยงย 110-122—
Application and fee.
ยงย 110-124—
Sewer district extension requirements.
ยงย 110-126—
Tier descriptions.
ยงย 115-3—
Purpose.
ยงย 115-83.25—
Minimum district requirements.
ยงย 115-141.1—
General provisions.
115-141.2{36}—
SUBSTANTIAL DAMAGE
115-141.2{37}—
SUBSTANTIAL IMPROVEMENT
ยงย 115-141.3—
Administration.
ยงย 115-141.7—
Variances.
ยงย 115-149—
Nonconforming uses.
ยงย 115-150—
Permits and variances.
ยงย 115-160—
General regulations for all districts.
ยงย 115-166—
Design standards.
ยงย 115-170—
Design standards.
ยงย 115-191.2—
Deposit of waste materials on premises outside of commercial establishments.
ยงย 115-191.5—
Withholding of permits and approvals.
ยงย 115-194.2—
Commercial communications towers and antennas.
ยงย 115-200—
Extension of use.
ยงย 115-211—
Variances.
ยงย 116-2—
Enumeration of required current obligations.
Crosswalks
Culverts
99-5{26}—
LOT GRADING CERTIFICATE
99-5{34}—
NONTIDAL WETLANDS
ยงย 99-18—
Street design standards.
115-4B{74}—
GRADING CERTIFICATE
115-4B{110}—
NONTIDAL WETLANDS
ยงย 115-141.5—
Requirements in special flood hazard areas other than coastal high-hazard areas.
ยงย 115-193—
Resource protection.
ยงย 115-221—
Final site plan requirements.
Curbs
ยงย 73-20—
Description of signs.
99-5{26}—
LOT GRADING CERTIFICATE
ยงย 99-18—
Street design standards.
ยงย 99-31—
Inspections; closeout procedures; fees.
ยงย 110-51—
Responsibility for and control of water main connections.
ยงย 110-65—
Protection of sewer system.
115-4B{74}—
GRADING CERTIFICATE
ยงย 115-77.1—
Large-scale uses.
ยงย 115-83.3—
Large-scale uses.
ยงย 115-166—
Design standards.
ยงย 115-194.1—
Combined Highway Corridor Overlay Zone (CHCOZ).
ยงย 115-221—
Final site plan requirements.