Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Union, NY
Broome County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: U
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Utilities
§ 12-5— Powers and duties. 12-10{1}— PARKS OR PARK 24-4{1}— AUTOMATICALLY ELIGIBLE CUSTOMERS 24-4{3}— COMMUNITY CHOICE AGGREGATION (CCA)/CCA PROGRAM 24-4{4}— ELIGIBLE CUSTOMERS 24-4{5}— ENERGY SERVICES COMPANY (ESCO) 24-4{8}— UTILITY § 24-6— Provisions for implementing CCA program. § 24-11— Liability. § 106-5— Duties of electrical inspectors. § 106-8— Nonapplicability of provisions. § 114-3— Permit required; testing and monitoring costs; bond; fee. § 121-3— Objectives. 121-4B{23}— MANUFACTURED HOME § 121-10.4— Flood-fringe provisions. § 121-10.5— Flood hazard area provisions. § 121-11— Establishment of development permit. § 121-12— Duties and responsibilities of local administrator. § 121-13— General standards. § 121-14— Specific standards. § 121-16— Board of Appeals. 141-3{4}— BUSINESS OFFICE § 144-2— Purpose. § 151-32— Issuance of licenses; performance regulations; display of licenses. 158-2{6}— UNOCCUPIED 158-2{8}— VACANT BUILDING § 158-4— Maintenance. 161-3{12}— REMOTE NET METERING § 161-5— Small-scale solar energy systems. § 161-6— Large-scale solar energy systems. 165-1A{1}— BOD (DENOTING "BIOCHEMICAL OXYGEN DEMAND") § 171-7— Stormwater Pollution Prevention Plans. § 178-3— Street-opening, sidewalk or curb alteration policy. 178-3A(2){11}— UTILITY § 178-23— Time limit for removal; notice. § 181-6— Land excluded from subdivision. 181-8B{10}— LETTER OF CREDIT (PERFORMANCE BOND) 181-8B{12}— MAINTENANCE BOND 181-8B{15}— PLAN, FINAL 181-8B{16}— PLAN, PRELIMINARY 181-8B{17}— PLAN, SKETCH § 181-10— Procedure. § 181-11— Requirements. § 181-14— Procedure. § 181-18— Installation of improvements. § 181-19— Street acceptance procedure. § 181-21— General provisions. § 181-22— Streets. § 181-24— Utilities. § 186-1— Statutory authority; legislative intent. 186-1.1C{1}— ACCESSORY FACILITY or STRUCTURE 186-1.1C{14}— MODIFICATION or MODIFY § 186-2— Permitted locations, approvals and bulk requirements. § 186-3— Tower or antenna special use permit application; fees and site plan. 193-4{3}— CONSTRUCTION ACTIVITY 193-4{7}— TOWN HIGHWAY § 199-1— Statement of recognition. § 199-7— Classifications of services. § 199-12— Changes in owner's equipment or use; cost. § 199-14— Responsibility for installation, maintenance and property damage. § 199-65— Adjustment of bills for meter errors. § A210-1— Legislative intent. § 300-20.3— Uses. § 300-21.3— Uses. § 300-22.3— Uses. § 300-32.3— Specially permitted uses. § 300-33.2— Procedures and requirements. § 300-40.4— Camps. § 300-40.11— Kennels. § 300-40.12— Mobile and manufactured homes. § 300-40.17— Public utilities. § 300-52.5— Prohibited signs. § 300-52.7— Construction and design standards. § 300-53.9— Height exceptions. § 300-56.2— General building design. § 300-57.3— Facades. § 300-57.4— Materials. § 300-63.2— Applicability. § 300-63.3— Procedure. § 300-63.5— Denial criteria. § 300-63.6— Findings for approval. § 300-65.1— Purpose. § 300-65.7— Required documents. § 300-65.8— PUD District process. § 300-65.9— Revision to PUD Districts. 300-70.2{131}— FUNCTIONAL AND FACTUAL FAMILY EQUIVALENT 300-70.2{154}— HOUSEHOLD PETS 300-70.2{159}— INSTITUTION 300-70.2{184}— MANUFACTURED HOME 300-70.2{187}— MANUFACTURING 300-70.2{192}— MOBILE HOME 300-70.2{236}— PUBLIC UTILITIES 300-70.2{237}— PUBLIC UTILITY BUILDING AND FACILITY 300-70.2{299}— TELECOMMUNICATIONS FACILITIES