[Amended 2-17-2010 by Ord. No. 3-10]
The fees required in connection with or for each application for development, soil erosion, sediment control plan, flood hazard development permit, zoning review, or any other permit or approval procedure pursuant to this chapter, shall be as specified in Chapter
171 of the Township Code.
Where an application is made under more than
one section of this chapter or the Township Code (for example, site
plan and variance, subdivision and grading permit, etc.), the filing
fee shall be the sum of the applicable fees unless specifically provided
to the contrary.
Fees for applications or for the rendering of
any service by the Planning Board or the Board of Adjustment or any
member of their administrative staffs which are not otherwise provided
by this chapter may be provided for and adopted by either such Board
as part of its rules and regulations.
The Harding Township Board of Education shall
be exempt from any fees in connection with development applications
or any other administrative requirements provided for in this chapter.