A.
Upon application for a permit, pursuant to the provisions of this chapter, the applicant shall pay the fees specified in Chapter 88, Fees, and shall also deposit such sum as may be specified in Chapter 88, Fees, with the township to be applied toward the cost of inspections as provided herein. At the end of each year the applicant shall reimburse the township for any additional amount expended by it for such inspections, or if there is a surplus left in the account, the applicant shall be entitled to a credit or refund.
B.
The permittee shall, on or before December 31 of each year during the continuance of the term of the permit, obtain an annual operating license for each ensuing calendar year and shall pay to the township, to cover the cost of the routine periodic spot field checks and the annual review of the quarry operation, the following fees or, where deemed appropriate, a maintenance bond or deposit in an amount set by the Township Engineer:
(1)
Where the permit is for less than 2,000 cubic yards per year, the sum as set forth in Chapter 88, Fees.
(2)
Where the permit is for the removal of more than 2,000 cubic yards per year, the sum as set forth in Chapter 88, Fees.
(3)
In the event that the annual operating license fees are not paid by January 31 of the license year for which the fee is due, the Township Clerk shall notify the delinquent permittee that no further quarry operation shall be conducted under the expired annual operating license until the required fees are paid, and further, if the required annual operating license fee is not paid by February 28 of the license year for which the fee is due, that said delinquency is grounds for revocation of the permit, and that the permit will be revoked without further notice to the permittee on account of nonpayment of the required fees if said fees are not received on or before March 31 of the license year for which the operating license fee is due.