Village of Central Square, NY
Oswego County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
In order that the Village has the assurance that the construction and installation of such improvements as storm sewer, public water supply, street signs, sidewalk and street surfacing will be constructed, the subdivider shall enter into one of the following agreements with the Village. The subdivider shall:
A. 
Construct all improvements directly affecting the subdivision as required by these regulations and by the Planning Board prior to final approval of the plat;
[Amended 1-8-2007 by L.L. No. 2-2007]
B. 
In lieu of the completion of the improvements, furnish bond executed by a surety company equal to the cost of construction of such improvements as shown on the plans and based on an estimate furnished by the Village Engineer; or
C. 
In lieu of the completion of improvements, deposit a certified check in sufficient amount equal to the cost of construction of such improvements as shown on the plat and based on an estimate furnished by the Village Engineer.
A. 
Before the final plat is approved, the subdivider shall have executed a subdivider's contract with the Village, and a performance bond or certified check shall have been deposited covering the estimated cost of the required improvements.
B. 
The performance bond or certified check shall be to the Village and shall provide that the subdivider, his or her heirs, successors and assigns, and their agent or servants, will comply with all applicable terms, conditions, provisions, and requirements of these regulations and will faithfully perform and complete the work of constructing and installing such facilities or improvements in accordance with such laws and regulations.
C. 
Before said bond is accepted it shall be approved by the Village Attorney as to the adequacy of such bond.
If the construction or installation of any improvements or facilities, for which guarantee has been made by the subdivider in the form of a bond or certified check deposit, is not completed within one year from the date of approval of the final plat, the subdivider may request an extension of time, provided he or she can show reasonable cause for inability to perform said improvements within the required time. The extension shall not exceed six months, at the end of which time the Village shall use as much of the bond or check deposit to construct the improvements as may be necessary. The same shall apply whenever construction of improvements is not performed in accordance with applicable standards and specifications.
When a certified check or performance bond is made pursuant to the preceding sections, the Village and the subdivider shall enter into a written agreement itemizing the schedule of improvements in sequence with the cost opposite each phase of construction or installation, provided that each cost as listed may be repaid to the subdivider upon completion and approval after inspection of such improvement or installation. However, 10% of the check deposit or performance bond shall not be repaid to the subdivider until all construction and installation covered by the check deposit or performance bond as outlined in the subdivider's contract is completed, inspected and accepted by the Village.
[Amended 1-8-2007 by L.L. No. 2-2007]
Periodic inspections during the installation of improvements shall be made by the Village Engineer to insure conformity with the approved plans and specifications as contained in the subdivider's contract and these regulations. The subdivider shall notify the Village Engineer when each phase of improvements is ready for inspection. Upon acceptable completion of installation and improvement, the Planning Board shall issue a letter to the subdivider or his or her representative and such letter shall be sufficient evidence for the release by the Village of the portion of the performance bond or check deposit as designated in the subdivider's contract to cover the cost of such completed work.
[Amended 1-8-2007 by L.L. No. 2-2007]
When the Village Engineer, following final inspection of the subdivision, certifies to the Planning board and the Village Board that all installation and improvements have been completed in accordance with the subdivider's contract, the Village Board may proceed to accept the facilities for which bond has been posted or check deposited.