A. 
The purpose of this section is to promote the health, safety and general welfare of the residents of the Town of Lake George, to provide standards for the safe provision of telecommunications consistent with applicable federal and state regulations; to minimize the total number of telecommunication towers in the community by encouraging shared use of existing and future towers, and the use of existing tall buildings and other high structures; and to minimize adverse visual effects from telecommunication towers by requiring careful siting, visual impact assessment, and appropriate landscaping.
B. 
These regulations are not intended to prohibit or have the effect of prohibiting the provision of personal wireless services nor shall they be used to unreasonably discriminate among providers of functionally equivalent services consistent with current federal regulations.
Placement of telecommunication towers is restricted to certain areas within the Town of Lake George. The restricted areas are as follows:
A. 
One thousand feet from the Adirondack Northway (I-87), as measured perpendicular to the right-of-way.
B. 
In the RCM-1 Zoning District on the west side of I-87.
C. 
In all LC-50 Zoning Districts.
D. 
Telecommunication towers are specifically excluded from all other zones within the Town of Lake George.
A. 
No telecommunication tower, except those approved prior to the first date of adoption of this section, shall be used unless in conformity with these regulations. No telecommunication tower shall hereafter be erected, moved, reconstructed, changed or altered unless in conformity with these regulations. No existing structure shall be modified to serve as a telecommunication tower unless in conformity with these regulations.
B. 
All applications pursuant to this article shall be subject to site plan review.
C. 
Exceptions to these regulations are limited to new uses, which are accessory to residential uses, and lawful or approved uses existing prior to the first date of adoption of this section, July 14, 2003.
D. 
Applications for construction of new telecommunication towers shall comply with the Code of Federal Regulations pertaining to objects affecting navigable airspace as delineated within Federal Aviation Regulations (FAR) Part 77. Additionally, no application for construction of a new telecommunication tower will be approved if the proposed tower violates the criteria for obstructions to air navigation as established by FAR Part 77 Subpart C, Obstruction Standards.
At all times, shared use of existing tall structures (for example, municipal water towers, multistory buildings, church steeples, farm silos, etc.) and existing or co-location (use of existing or approved towers) shall be preferred to the construction of new towers.
The Planning Board may consider a new telecommunication tower when the applicant demonstrates that shared use of existing tall structures and existing or approved towers is impractical. An applicant shall be required to present an adequate report inventorying all existing tall structures and existing or approved towers within a reasonable distance of the proposed site. This distance shall be determined by the Board in consultation with the applicant. The report shall outline opportunities for shared use of these existing facilities as an alternative to a proposed new tower. The report shall demonstrate good-faith efforts to secure shared use from the owner of each existing tall structure and existing or approved tower, as well as documentation of the physical, technical and/or financial reasons why shared usage is not practical in each case. Written requests and responses for shared use shall be provided.
Where shared use of existing tall structures, and existing or approved towers, is found to be impractical, the applicant shall investigate shared usage of an existing tower site for its ability to accommodate a new tower and accessory uses. Documentation and conditions shall be in accordance with Article IX, § 175-70, New telecommunication towers, above.
The Board may consider a new telecommunications tower on a site not previously developed with an existing tower when the applicant demonstrates that shared use of existing tall structures, and existing or approved towers, is impractical, and submits a report as described in Article IX, § 175-70, New telecommunications towers, above; and when the Board determines that shared use of an existing tower site for a new tower is undesirable based upon the applicant's investigation in accordance with Article IX, § 175-71, Shared usage of existing tower site for placement of new towers.
The applicant shall design a proposed new telecommunications tower to accommodate future demand for reception and transmitting facilities. The applicant shall submit to the board a letter of intent committing the owner of the proposed new tower, and his/her successors in interest, to negotiate in good faith for shared use of the proposed tower by other telecommunications providers in the future. This letter shall be filed with the Building Inspector prior to issuance of a building permit. Failure to abide by the conditions outlined in the letter may be grounds for revocation of the special permit. The letter shall commit the new tower owner and his/her successors in interest to:
A. 
Respond within 90 days to a request for information from a potential shared use applicant.
B. 
Negotiate in good faith concerning future requests for shared use of a new tower by other telecommunications providers.
C. 
Allow shared use of the new tower if another telecommunications provider agrees in writing to pay reasonable charges. The charge may include but is not limited to a pro rate share of the cost of site selection, planning, projection administration, land costs, site design, construction and maintenance financing, return on equity, and depreciation, and all of the costs of adapting the tower or equipment to accommodate a shared user without causing electromagnetic interference.
Alternative designs shall be considered for new towers, including lattice and single-pole structures. The design of a proposed new tower shall comply with the following:
A. 
Any new tower shall be designed to accommodate future shared use by other telecommunications providers.
B. 
Unless specifically required by other regulations, a tower shall have a finish (either painted or unpainted) that minimizes its degree of visual impact.
C. 
The maximum height of any new tower shall not exceed that which shall permit operation without artificial lighting of any kind or nature, in accordance with municipal, state, and/or federal law and/or regulation. The Board at its discretion may modify this requirement if the applicant can justify the need to exceed this height limitation.
D. 
The Board may request a review of the application by a qualified engineer in order to evaluate the need for, and the design of, any new tower. The cost of this review shall be borne by the applicant.
E. 
Accessory structures shall maximize the use of building materials, colors and textures designed to blend with the natural surroundings.
F. 
No portion of any tower or accessory structure shall be used for a sign or other advertising purpose, including but not limited to company name, phone numbers, banners, and streamers.
A. 
Existing vegetation. Existing on-site vegetation shall be preserved to the maximum extent possible. No cutting of trees exceeding four inches in diameter (measured at a height of four feet off the ground), shall take place prior to the approval of the special permit.
B. 
Screening. Deciduous or evergreen tree plantings may be required to screen portions of the tower and accessory structures from nearby residential property as well as from public sites known to include important views or vistas. Where a site abuts a residential property or public property, including streets, screening shall be required.
C. 
Access. Adequate emergency and service access shall be provided. Maximum use of existing roads, public or private, shall be made. Road construction shall, at all times, minimize ground disturbance and vegetation cutting to within the toe of fill, the top of cuts, or no more than 10 feet beyond the edge of any pavement. Road grades shall closely follow natural contours to assure minimal visual disturbance and reduce soil erosion potential.
D. 
Parking. Parking shall be provided to assure adequate emergency and service access. The Board shall determine the number of required spaces based upon a recommendation from the applicant. No parking spaces shall be located in any required yard.
E. 
Fencing. The tower and any accessory structures shall be adequately enclosed by a fence, the design of which shall be approved by the Board. The Board may waive this requirement if the applicant demonstrates that such measures are unnecessary to ensure the security of the facility.
A. 
An applicant shall be required to submit a site plan in accordance with Article VI. The site plan shall show all existing and proposed structures and improvements including roads, buildings, tower(s), guy wire and anchors, antennae, parking and landscaping, and shall include grading plans for new facilities and roads.
B. 
Supporting documentation. The applicant shall submit a complete short EAF, a complete visual environmental assessment form (visual EAF addendum), and documentation on the proposed intent and capacity of use as well as a justification for the height of any tower and justification for any clearing required. The applicant shall also submit a copy of its Federal Communications Commission (FCC) license.
C. 
Lot size and setbacks.
(1) 
All proposed telecommunication towers and accessory structures shall be located on a single parcel and shall be set back from abutting parcels and street lines a distance sufficient to substantially contain on-site all ice-fall or debris from tower failure and preserve the privacy of any adjoining residential properties.
(2) 
Telecommunication towers shall comply with all existing setback requirements of the underlying zoning district, or shall be located with a minimum setback from any property line equal to 1/2 of the height of the tower, whichever is greater. Accessory structures shall comply with the minimum setback requirements in the underlying zoning district.
D. 
Visual impact assessment. The Board may require the applicant to undertake a visual impact assessment, which may include:
(1) 
A zone of visibility map shall be provided in order to determine locations where the tower may be seen.
(2) 
Pictorial representations of before-and-after views from key viewpoints both inside and outside of the Town, including but not limited to: state highways and other major roads, state and local parks, other public lands, preserves and historic sites normally open to the public, and from any other location where the site is visible to a large number of visitors or travelers. The Board shall determine the appropriate key sites at a presubmission conference with the applicant.
(3) 
Assessment of alternative tower designs and color schemes, as described in Article IX, § 175-73, New towers: future shared use.
(4) 
Assessment of the visual impact of the tower base, guy wires, accessory buildings and overhead utility lines from abutting properties and streets.
E. 
Shared use or colocation. If the applicant is proposing a shared use of an existing structure or is proposing to collocate, then the following additional site plan review submission requirements shall apply:
(1) 
Documentation of intent from the owner of the existing facility to allow shared use.
(2) 
The site plan shall indicate any methods used to conceal the modification of the existing facility.
(3) 
An engineer's report certifying that the proposed shared use will not diminish the structural integrity and safety of the existing tall structure, and explaining what modifications, if any, will be required in order to certify to the completion.
The applicant shall submit to the Board a letter of intent committing the tower owner, and his/her successors in interest, to notify the Building Inspector within 30 days of the discontinuance of use of the tower. This letter shall be filed with the Zoning Officer prior to issuance of a building permit (assuming the telecommunication tower is approved according to this section). Obsolete or unused towers and accessory structures shall be removed from any site within four months of such notification. Failure to notify and/or to remove the obsolete or unused tower in accordance with these regulations shall be a violation of this chapter and shall be punishable according to Article XI.
In order to keep neighboring municipalities informed, and to facilitate the possibility of directing that an existing tall structure or existing telecommunications tower in a neighboring municipality be considered for shared use, and to assist in the continued development of County 911 Services, the Board shall require that:
A. 
An applicant who proposes a new telecommunication tower shall notify in writing the legislative body of each municipality that borders the Town of Lake George, the Warren County Planning Board, and the Director of Warren County Emergency Services. Notification shall include the exact location of the proposed tower, and a general description of the project including, but not limited to, the height of the tower and its capacity for future shared use.
B. 
Documentation of this notification shall be submitted to the Board at the time of application.
The applicant shall be required to mail notice of the public hearing directly to all landowners whose property is located within 500 feet of the property line of the parcel on which a new tower is proposed. Notice shall also be mailed to the administrator of any state or federal parklands from which the proposed tower would be visible if constructed. Notification, in all cases, shall be made by certified mail. Documentation of this notification shall be submitted to the Board prior to the public hearing.