A.
Before starting demolition, all glass in exterior openings shall be removed. All gas, electric, water, steam and other supply lines shall be shut off and capped. In each case the service company involved shall be notified in advance. All sewer connections shall be sealed off in a manner satisfactory to the authority responsible for sewers.
B.
Where it is necessary to maintain any power, water, gas or electric lines during demolition, such lines shall be so relocated or protected with substantial coverings as to protect them from injury and to afford safety to the workmen and the public.
C.
Before demolition is started, the cellar shall be thoroughly cleaned of combustible material and all fixtures and equipment which would cause voids in the fill removed. If the cellar is to be filled to grade, the existing cellar floor shall be broken up to provide ground drainage and prevent accumulation of water. If the cellar is not to be filled, adequate drainage shall be provided.