This chapter shall be enforced by the Building Director or his
designee, who shall be appointed by the Town Board of North Greenbush.
No building shall hereafter be erected or structurally altered
within the area covered by the Zoning Map until a permit authorizing the same shall have been issued
by the Building Director or his designee.
The Building Director or his designee shall require that the
application for a building permit be accompanied by a plot plan, building
plans and specifications which shall contain all the information necessary
to enable him to ascertain whether the proposed building complies
with the provisions of this chapter.
No building permit shall be issued until the Building Director
or his designee has certified that the proposed building or alteration
complies with the provisions of this chapter.