A. 
Drainage shall be provided on street frontages in accordance with the requirements of the village.
B. 
Drainage plans shall be submitted in accordance with the terms and requirements of this Article and shall include complete forms as provided by the village and, further, shall indicate existing surrounding drainage systems which may affect the site and shall indicate that the drainage of the site shall be self-contained and shall not affect surrounding areas.
C. 
Overall site layout shall be designed to minimize the effect on existing drainageways and channels, whether permanent or seasonal, and to prevent damage to surrounding properties.
D. 
The developer shall be responsible for the solution to all drainage problems within the site and along all street frontages bordering the site and off site if caused or contributed to by the proposed development whether or not they are indicated on the approved drainage plan.
E. 
The Planning Board, with recommendations from the Village Engineer, may consider alternatives to the drainage requirements contained herein.
F. 
Stormwater collection system.
(1) 
The stormwater collection system shall be designed in accordance with the Rational Method as follows (see Figure 108.1[1]):
Q
=
Air
Q
=
Discharge in cubic feet per second.
A
=
Tributary drainage area in acres.
i
=
Coefficient of runoff of the drainage area. Calculations of "i" shall be shown on design sheet.
R
=
Rainfall intensity in inches per hour as determined by:
R
=
120
t + 20
Where:
t
=
Time of concentration in minutes.
[1]
Editor's Note: Figure 108.1 is located at the end of this chapter.
(2) 
Pipes, conduits or ditches shall be designed by the use of the Mannings Formula as follows:
V
=
1.486 x R2/3 x S1/2
   n
Where:
V
=
Velocity in feet per second
R
=
Hydraulic radius in feet
n
=
Coefficient of roughness where:
n
=
0.13 for reinforced concrete pipe 24 inches or smaller in diameter.
n
=
0.15 for reinforced concrete pipe 18 inches or smaller in diameter.
n
=
To be determined and approved for special conduits and ditches. (1) Maximum velocity 10.0 feet/second
S
=
Slope of pipe to be used as hydraulic gradient of pipe flow except where system will be surcharged when recharge basin is full. Design gradient in this case may be assumed as lowest inlet invert to water surface at 80% storage volume where no overflow is provided. In case of outfall in tidal water, use maximum tide elevation.
(3) 
Manholes. The maximum distance apart shall be 350 feet.
(4) 
Pipe alignment and locations. Storm sewer pipe shall be in a straight line between manholes and shall be placed between the center line of the road and curbline.
(5) 
Valley gutters. Valley gutters may be permitted at T-intersections where they are parallel to the center line of the through road and shall be installed only after design approval by the village. In general, the crown of the intersecting road shall be gradually eliminated starting from a point about 30 feet back from the flow line of the through street. At other than T-intersections, valley gutters may be permitted only when warranted by limited traffic use as approved by the village.
(6) 
Gutter flow. Surface drainage in gutters shall be limited to that flow which shall not exceed five inches in depth at the curb based on the individual conditions of road grade, runoff factor, rainfall intensity, tributary area and inlet capacity.
(7) 
Catch basins. Not more than two catch basins shall be interconnected before being connected to a manhole. All drainage structures under pavement, including overflows, shall have surface access for cleaning.
(8) 
Brooks, ditches and stream beds. Areas such as brooks, water-bearing ditches and dry stream beds giving evidence of seasonal runoff use shall be maintained for drainage purposes in their existing or natural state.
(9) 
Drainage structures which are located on state or county highway rights-of-way shall be approved by the appropriate highway engineer's office. A letter of approval from that office shall be filed with the Village Planning Board. Where county highways are involved, the Planning Board shall obtain the approval from the county pursuant to § 239-k of the General Municipal Law.
G. 
Stormwater recharge basins shall be required as specified herein and designed in accordance with the village construction standards in Appendix A[2] and the following:
(1) 
Storage capacity. Storage capacity necessary to accommodate an eight-inch rainfall with coefficient of runoff based on runoff characteristics shall be provided (see Figure 108.2[3]). However, where a positive overflow acceptable to the Village Engineer is available, the storage capacity may be designed for a five-inch rainfall. Where the required volume is less than 4,000 cubic feet, a recharge basin shall not be required. In this case, precast leaching basins designed to store a two-inch rainfall may be used.
[3]
Editor's Note: Figure 108.2 is located at the end of this chapter.
(2) 
There shall be a minimum of two feet between the design depth of any leaching facility and groundwater as determined by test holes. Test hole locations, soil conditions and water level shall be shown on all plans.
(3) 
Maximum storage depth shall be 14 feet.
(4) 
Side slopes, berm, planting fence, curb and gate shall be in accordance with the village construction standards in Appendix A.[4]
[4]
Editor's Note: Appendix A, which contains the village construction standards, is on file in the office of the Village Clerk.
[2]
Editor's Note: Appendix A, which contains the village construction standards, is on file in the office of the Village Clerk.
H. 
Stormwater storage in leaching pools shall be designed to contain a rainfall and runoff of two inches and shall be designed in accordance with § 108-5.
I. 
To the extent applicable, all drainage improvements associated with land development shall conform as well to the provisions of and be consistent with the requirements of Chapter 143, Part 2.
[Added 3-4-2008 by L.L. No. 3-2008]