A.
All earth surfaces of slopes and disturbed areas related in any way to roads being constructed shall be covered with a minimum of four inches of topsoil and seeded. Work shall be performed in accordance with the New York State Department of Transportation Specifications.
B.
Topsoil shall be stripped from the road area and stockpiled for this purpose. If insufficient topsoil is available, it shall be imported.
C.
Seed shall be placed at a rate of 150 pounds per acre in such a manner and of such consistency to produce a hardy grass that will produce a turf which will stabilize the slope.
D.
All work and materials used under this item shall meet the approval of the Town Engineer and shall be done in accordance with town ordinances and regulations pertaining thereto.