Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Greencastle, PA
Franklin County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
A. 
All significant industrial users proposing to connect to or discharge to the sewer system shall obtain a wastewater discharge permit at least 90 days before connecting to or discharging to the sewer system. All existing significant industrial users connected to or discharging to the sewer system shall apply for a wastewater discharge permit within 45 days after notification from the Borough.
B. 
Following its review of the information provided, including any additional information which may be requested by the Borough, the Borough will issue or deny the issuance of a wastewater discharge permit to the significant industrial user.
A. 
Any significant industrial user required to obtain a wastewater discharge permit shall complete and file with the Borough an application in the form and containing information as prescribed by the Borough, and shall submit an administrative fee as established from time to time by the Borough. The application shall be executed by an authorized representative of the significant industrial user.
B. 
The Borough will evaluate the data furnished by the significant industrial user and may require additional information. After evaluation and acceptance of the data furnished, the Borough may issue a wastewater discharge permit subject to terms and conditions provided therein.
The wastewater discharge permit of a significant industrial user may be revised by the Borough when:
A. 
Necessitated to protect public health, welfare and safety;
B. 
In response to a change in process or discharge by the significant industrial user;
C. 
In response to a change in Borough, county, state and federal regulations;
D. 
In response to a change in Borough's NPDES permit, or any other permit, or a change in state and federal regulations governing sludge disposal, air quality, or water quality.
Wastewater discharge permits shall be expressly subject to all provisions of any Borough ordinance and all other applicable regulations, charges and fees established by the Borough. Permits may contain the following:
A. 
Limitations on the average and maximum wastewater constituents and characteristics including but not limited to flow, pollutant concentrations and mass limits;
B. 
Limitations on average and maximum rate and time of discharge or requirements for flow regulation and equalization;
C. 
Requirements of installation and maintenance of inspection, sampling and monitoring facilities;
D. 
Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, types and standards for tests and reporting schedule;
E. 
Compliance schedule and reporting requirements;
F. 
Requirements for submission of technical reports or discharge reports;
G. 
Requirements for maintaining and retaining records relating to wastewater discharge as specified by the Borough, and affording Borough access thereto;
H. 
Requirements for notification of the Borough of any new discharge of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being discharged to the sewage treatment plant;
I. 
Requirements for notification of slug loads and accidental discharges;
J. 
Other conditions as deemed appropriate by the Borough to insure compliance with any Borough ordinance, or state and federal regulations.
Permits shall be issued for a time period not to exceed five years and will expire on a specific date. The significant industrial user shall apply for permit reissuance a minimum of 180 days prior to the expiration of the significant industrial user's existing permit. The terms and conditions of the permit may be subject to modification by the Borough during the term of the permit as described in § 155-21, supra. The significant industrial user shall be informed of any proposed change in its wastewater discharge permit at least 30 days prior to the effective date of change. Any changes or new conditions in the wastewater discharge permit shall include a reasonable time schedule for compliance.
Wastewater discharge permits are issued to a specific significant industrial user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without the approval of the Borough.