Unless otherwise specified by the Borough, all work shall be performed in accordance with New Jersey State Highway Department Standard Specifications for Road and Bridge Construction - 1961, or later revision. These specifications shall govern the installation and construction of improvements in all subdivisions whose final plats have not received approval prior to the effective date of this chapter, and to all construction work hereafter performed on previously approved final plats.
A. 
Definitions (Article 1.1.3.). Through the context of these specifications and the state specifications, the word "contractor" shall mean the subdivider or applicant who is obligated to complete the required improvements and any subcontractors or others in his employ. The words "engineer" and "inspector" shall mean the Borough Engineer or his authorized representative.
B. 
Plans and specifications (Article 1.2.3). All work performed shall be in accordance with the engineering drawings which have been approved by the Borough Engineer and final appropriate standard details and in accordance with these standard supplementary specifications and the state standard specifications and also in accordance with any special conditions which may have been imposed as a condition of approval. When a discrepancy arises between the plans and specifications or between these supplementary specifications and the state specifications, it shall be referred to the Borough Engineer whose interpretation shall be final.
C. 
Subsurface conditions. (Article 1.2.12). Approval of the final engineering drawings shall not relieve the developer of any responsibility to construct the required improvements on suitable subgrade. If, during the course of construction, unsatisfactory subsurface conditions are discovered, the Borough Engineer shall examine the situation and advise the developer in writing of the necessary corrective measures.
D. 
Other contractors. (Article 1.4.2). The subdivider shall be responsible for all work performed by subcontractors in his employ. Prior to any subcontractor beginning work, the subdivider shall notify the Engineer in writing of the name and address of the subcontractor, the name of the person who will be in charge of the work to be performed and the scope of the work to be performed by each subcontractor.
E. 
Maintenance and protection of traffic (Article 1.4.3).
(1) 
Vehicular and pedestrian traffic shall be maintained over all existing streets and highways within or adjacent to the proposed subdivision. All roadways which are to be utilized for vehicular traffic shall be maintained free from obstructions and in a smooth riding condition at all times.
(2) 
Except as necessary during actual working hours, the contractor shall not occupy with his equipment, materials or personnel any roadway or sidewalk area that is open to traffic within or adjacent to the subdivision.
(3) 
The contractor shall provide means of access for pedestrian and vehicular traffic at all private driveways and occupied buildings affected by his work. During construction in the vicinity of a driveway, the access width at the driveway entrance shall be plainly marked by lights, torches and such other devices as meet with the approval of the Engineer. The contractor shall notify the owners of adjoining properties at least 24 hours prior to the time he proposes to begin any work which will interfere with their normal passage.
(4) 
No equipment or machinery having caterpillar or other heavy treads that mar or damage pavements shall be permitted to move over or operate from newly completed or existing pavements unless such equipment or machinery is moved on suitable pontoons or trailers.
(5) 
The contractor shall erect or place and maintain in good condition barricades, lights, flares, yellow electric flasher units, traffic cones and other warning signals and devices appropriate for the specific need, at working sites, open excavations, locations of obstructions and other locations where there is danger to vehicular or pedestrian traffic. All such devices and installations shall be subject to the approval of the Engineer.
F. 
Final cleaning up (Article 1.4.4). Before final acceptance of any improvements, the contractor shall remove from the site all temporary work, unused or useless material, rubbish and debris; repair or replace any public or private property which may have been damaged by his operation; fill all depressions and water pockets; remove any and all obstructions from waterways; clean all drains and drainage structures of any silt and other debris; sweep all streets; and leave the site and adjacent public and private property in a neat and presentable condition wherever his operations have disturbed conditions existing at the time of starting the work.
G. 
Sanitary provisions (Article 1.4.6). The contractor shall provide and maintain in a neat and sanitary condition, properly secluded, accommodations for himself and his employees, complying with the regulations of the State Department of Health and other bodies having jurisdiction.
H. 
Materials (Article 1.4.7).
(1) 
All materials for the project shall be furnished by the subdivider unless specific provisions have been made otherwise in any conditions of approval. Before beginning any work, the subdivider shall notify the Engineer in writing of the name and address of the suppliers of all material to be used in the construction of all improvements. No change shall be made in the type or quality of material as shown on the approved plans or required by ordinance unless specific written approval is obtained from the Engineer.
(2) 
The required samples of materials shall be as follows:
Material
Sample
Rate of Sample
Delivery Instructions
Bituminous concrete (in place)
6-inch square
Each 200 sq. yds.
Securely wrapped
Bituminous stabilized base course (in place)
6-inch square
Each 200 sq. yds.
Securely wrapped
Concrete
6- x 12-inch Cylinder
Each 50 cu. yds., each class
Common carrier in crates or delivery by vehicle
Landscaping materials
Subject to job site inspection
Soil aggregate
50 pounds
500 cu. yds.
Large sample bag
(3) 
For all materials not shown which are to be used on the project, the subdivider shall furnish to the Engineer certifications from each supplier attesting to the material being furnished in accordance with all applicable ordinances and regulations of the Borough of Tuckerton and shall contain the following information:
(a) 
The project to which the material is consigned.
(b) 
The name of the contractor to which the material is supplied.
(c) 
The kind of material supplied.
(d) 
The quantity of material represented by the certificate.
(e) 
That the material has been tested and found to be in conformity with all pertinent requirements.
(4) 
The Engineer shall at all times reserve the right to require samples other than listed above or to revise the rate of sampling to ensure the quality of the material being furnished. The required samples shall be taken by the Engineer. However, the contractor shall furnish all tools, labor and other assistance necessary.
I. 
Duties of Engineer (Article 1.5.1). The Engineer shall be responsible for the inspection of all work. He shall furnish to the subdivider or his representative any information concerning municipal facilities which may be required to complete the work.
J. 
Construction stakes (Article 1.5.4). The subdivider shall be required to perform all construction stakeout. Sufficient stakes shall be placed to ensure that the contractor with reasonable effort can transfer them accurately to the work. When, in the opinion of the Engineer, sufficient stakes are not being furnished to adequately control the work, he shall notify the contractor and subdivider and no work shall be undertaken until adequate stakes have been furnished. When, in the opinion of the Engineer, work has not been accurately constructed, he shall notify the subdivider of the nature and extent of the questionable work and the as-built information required to verify the work. The subdivider shall then furnish the required information.
K. 
Unauthorized or defective work (Article 1.5.6). Work performed and materials furnished which do not conform to the requirements therefor will be rejected and shall be removed, replaced or repaired as the Engineer may direct in a manner satisfactory to him at the expense of the subdivider.
L. 
Acceptance of work (Article 1.5.8). Upon completion of all required work, the subdivider shall make application to the Borough for municipal acceptance of all improvements which are to be maintained by the Borough. Application shall be made in the manner designated by the Borough. Upon receipt of a request for acceptance, the Engineer and other inspectors designated by the Borough shall make a final inspection of all improvements. If any improvements are incomplete or unacceptable, the Engineer shall notify the subdivider in writing of the missing or unacceptable portions of the work. The subdivider shall then make all necessary repairs. Prior to formal acceptance, the subdivider shall have posted all required maintenance guaranties.
M. 
Permits and licenses (Article 1.6.5). Except as may be provided otherwise, the subdivider shall procure all required permits and licenses, pay all charges and fees therefor and shall give all notices necessary and incidental to the due and lawful prosecution of the work.
N. 
Property damage (Article 1.6.10. The subdivider shall not enter upon or make use of private property without obtaining written approval to do so from the owner. A copy of such approval shall be filed with the Engineer and shall state the work to be performed, the approximate time for completion, the approximate location and extent of property to be altered and the manner in which the land is to be restored.
O. 
Commencement and procedure (Article 1.7.1). No work shall commence on any improvement until the necessary approvals have been obtained from all governmental agencies having jurisdiction. The subdivider shall notify the Engineer at least one week in advance of the time he will start work.
P. 
Progress and time of completion (Article 1.7.2). All work shall be completed within the time limit specified in the performance guaranty or within any extended time period which may be granted by the Borough.
Q. 
Change of plans (Article 1.8.4). If the subdivider wishes to make any changes in the work from that shown on the approved plans, he shall submit a request to do so in writing with all supporting documents or drawings to the Engineer. If, in the opinion of the Engineer, the change requested is within his authority to grant and he deems it advisable, he shall so notify the subdivider. If the change requested is not within the authority of the Engineer to grant, he will then notify the subdivider of the approvals which must be obtained.
A. 
Clearing site (Section 1).
(1) 
Methods of construction (Article 2.1.3). The site shall be cleared within the limits of construction. In all areas of the site, the ground shall be cleared of debris, rubbish and other unsuitable matter. In areas of street construction, subsurface installations, paved areas and building sites, trees shall be removed and stumps grubbed out. Stumps may remain extending not more than one foot above the ground surface only in those areas where the pavement subgrade is more than 3 1/2 feet above the ground surface. In the remaining areas of the subdivision site, trees should only be removed when dead or diseased, in the interests of selective thinning or when required grade changes make it impossible or impractical to preserve them. Branches of trees overhanging any traveled way shall be cut off to a height of 14 feet above it and cuts made more than one inch in diameter shall be painted.
(2) 
Street and road signs shall be removed carefully and shall be reset at the exact locations and in the manner designated by the authorities having jurisdiction.
(3) 
Where buildings are required to be demolished, the work shall consist of complete demolition or removal of the buildings, including foundation walls above the ground, porches, breaking of cellar floors, termination of utilities and other incidental work.
(4) 
When existing municipal facilities are being abandoned within the work site, the subdivider shall carefully remove all usable materials and deposit them where instructed by the Borough Superintendent of Public Works.
(5) 
All materials accumulated by the work of clearing the site shall be disposed of by the subdivider off the subdivision site. No burning or burying of accumulated materials will be permitted.
B. 
Roadway excavation (Section 2).
(1) 
Methods of construction (Article 2.2.3). After clearing the site and before commencing any grading, the underlying topsoil within excavation and embankment areas shall be stripped and stored on the site in locations which will not interfere with the work. Upon completion of the grading and other work, the topsoil shall be redistributed to all lot areas and other landscaped areas within the site. Excavation shall be carried to the lines and grades shown on the plans. Cellar walls and foundations shall be removed to a depth of not less than two feet below the proposed pavement subgrade. Roadway excavations shall be carried out so that the subgrade throughout is kept properly drained. If any unsuitable material is encountered at the bottom limits of the excavation, it shall be removed to firm bottom or as directed by the Engineer and replaced with satisfactory borrow. Material so removed may be used for lot fill if approved by the Engineer and if not, shall be disposed of by the contractor off the subdivision site.
(2) 
All excavated materials which are suitable therefor shall be used for embankment or lot backfill. All excess material shall be disposed of by the contractor off the subdivision site.
(3) 
All excavation shall be carried out in a manner which will minimize erosion potential. When excavation is required adjacent to private property, diversion ditches or berms shall be constructed to prevent washing of excavated materials onto adjoining lands.
C. 
Embankment (Section 3).
(1) 
Materials (Article 2.3.2). Embankment material shall be equal to soil aggregate Type 4, Class D, conforming to the requirements specified in Division 8, Section 8, of the state specifications and gradation listed below and any other materials which, in the opinion of the Borough Engineer, are suitable for the use intended.
Sieve Size
Percent by Weight Passing Square Mesh Sieves
4-inch
100
No. 200
0 to 5
(2) 
Methods of construction (Article 2.3.3). Before placing the embankment, the underlying topsoil shall be stripped as provided for under excavation. Embankment shall not proceed during freezing weather except upon approval of the Engineer, nor shall embankment be placed on ice, frozen ground or frozen layers of embankment. The stripped surface of existing ground shall be compacted by the dry-fill method prior to placing additional embankment. In areas of subsurface installations, embankment shall be placed to at least one foot above the proposed installation before trenching begins for the subsurface installation. Where existing pipes and conduits have insufficient earth cover during construction, the contractor shall protect them against damage by his operations. Any existing pipe damaged by the contractor shall be removed and replaced at his expense. No rock or broken paving materials which are permitted to be used for embankment larger than 12 inches in any dimension shall be placed within three feet of any subsurface installation. When such materials are permitted in the embankment, they shall be distributed throughout the embankment in a manner which will ensure that no unfilled voids are created.
(a) 
Dry fill method. The embankment shall be compacted by the rolling or vibrating method or by the density control method, as specified by the Engineer and more fully described in Article 2.3.3 of the state specifications. Where the conditions are such that access with compacting equipment specified above is not possible, the embankment shall be placed in six-inch layers and shall be compacted to a density of not less than 95%. Water shall be applied to the loose layers of embankment when directed by the Engineer. The construction of embankment shall not proceed when its moisture content exceeds the optimum by more than 2% as determined in the test for compaction specified by ASTM Designation D698.
(b) 
Backfill of wet excavation areas. Wet excavation shall be performed as specified in Article 2.2.3 of the state specifications. The contractor shall test the bottom of the excavation longitudinally and transversely at sufficient points to make sure that all muck and other unstable materials have been removed. The formation of embankment shall proceed in the form of a wedge of 60° with its axis following the center line of the roadway. The manner of filling and advancing the wedge shall be such as to force all remaining muck and silt laterally to the sides of the excavation, and not entrap it under the fill. All accumulations of muck and other unstable material at the sides of the excavated area shall be removed as the embankment wedge advances. If any muck or silt is spilled or otherwise deposited on the top or sides of the embankment during this operation, it shall be entirely removed by the contractor. If muck, silt, mud or clay are entrapped within or under the embankment or between any new and existing embankment, and the quantity and location or distribution thereof is such as to cause visible unstable areas in the embankment or to be detrimental to the stability of the embankment or of the proposed or future roadway or structures, in the opinion of the Engineer, the entrapped muck, mud, silt or clay and the overlying material shall be removed and all such excavated areas shall be backfilled with satisfactory material.
D. 
Borrow excavation (Section 4).
(1) 
Materials (Article 2.4.2). Borrow excavation materials shall conform to the requirements for embankment materials specified in Article 2.3.2 or other materials which in the opinion of the Engineer are satisfactory for the use intended.
(2) 
Methods of construction (Article 2.4.3). Borrow excavation material may be procured from upland borrow pits or from hydraulic sources. No borrow shall be brought to the site until the contractor has advised the Engineer of the location of the source and furnished samples for approval. Borrow shall only be obtained from locations which are being legally operated under all local and state regulations. Borrow excavation shall be placed as specified for embankment.
E. 
Channel and ditch excavation (Section 5).
(1) 
Methods of construction (Article 2.5.3). Excavated materials that are disposed of adjacent to the channels shall be neatly graded and sloped to provide adequate drainage flow from the lands adjacent to the channel.
F. 
Subsurface structure excavation (Section 7).
(1) 
Methods of construction (Article 2.7.3). Trenches shall be not less than one foot wider at the bottom than the outside diameter of the pipe and, when conditions permit, shall be opened for a distance of not more than 300 feet in advance of the laying of the pipe. When the material at the bottom of the trench is soft or otherwise unsuitable, it shall be removed as directed by the Engineer and replaced with suitable material. Backfill of trenches shall be made in layers not exceeding 12 inches in thickness and compacted in a manner satisfactory to the Engineer up to one foot above the top of the pipe. Backfill around inlets, manholes and other structures shall be compacted by flat face mechanical tampers.
Pavements (Division 3).
A. 
Gravel base course (Section 1).
(1) 
Materials (Article 3.1.2). The material shall be soil aggregate Type 2, Class A, conforming to the requirements specified in Division 8, Section 8, of the state specifications and gradation shown below:
Sieve Size
Percent by Weight Passing Square Mesh Sieves
2-inch
100
3/4-inch
70 to 100
No. 4
35 to 75
No. 40
15 to 30
No. 200
4 to 12, see text
(2) 
Methods of construction (Article 3.1.3). The gravel shall be placed in layers not exceeding eight inches in thickness and shaped with road scrapers so that when compacted and finished, it will be of the thickness and at the required grade and crown. The gravel shall be compacted as specified in Article 2.3.3 of the state specifications. The dry-fill method, except that alternative four with a minimum of five passes of a fifty-ton compactor loaded to a gross weight of 25 tons, or alternative five, shall be used. Inaccessible areas shall be compacted to a density of not less than 95%.
B. 
Bituminous stabilized base course (Section 2A).
(1) 
Materials (Article 3.2A.2). All material for the bituminous stabilized base course shall be in accordance with the provisions listed herein and in accordance with all applicable remaining provisions of this article of the state specifications including amendments contained in Addenda A to the 1961 Standard Specifications (hereinafter referred to as "Addenda A") and amendments contained in the Reference and Instructional Guide for Use in Preparation of Supplementary Specifications, March 1967, with current amendments thereto.
(2) 
Soil aggregates shall be natural or prepared mixtures consisting predominantly of stone, sand and stone dust for stone mix or hard durable particles or fragments of gravel and sand containing some silt-clay or stone dust for gravel mix meeting the requirements as specified in Articles 8.8.5 and 8.8.1 of the state specifications.
(3) 
Bituminous material shall be asphalt cement, viscosity grade AC-20, conforming to the requirements specified therefor in Article 8.1.2 of the state specifications.
(4) 
The mineral constituents for each mix shall be combined in such proportions that the resulting mixture will comply with the grading requirements prescribed in Article 3.10.2 for Mix No. 1 of the state specifications.
C. 
Bituminous concrete surface course, hot mixed (Section 10).
(1) 
Materials (Article 3.10.2). All materials shall conform to the requirements listed hereinafter and with those amendments listed under Article 3.2A.2 of the state specifications.
(a) 
Coarse aggregate shall be broken stone conforming to the requirements of Article 8.5.5 of the state specifications.
(b) 
Fine aggregate shall conform to the requirements of Article 8.5.12 of the state specifications.
(c) 
Mineral filler shall conform to the requirements of Article 8.5.34 of the state specifications.
(d) 
Composition of mixtures.
[1] 
The bituminous concrete for the bottom course shall be composed of coarse aggregate, fine aggregate and bituminous material. The bituminous concrete for the top course shall be composed of coarse aggregate, fine aggregate, mineral filler and bituminous material.
[2] 
The several mineral constituents for each mixture shall be combined in such proportions that the resulting mixture will meet the grading requirements shown in Table 3 below.
[3] 
In calculating the percentages of aggregates of the various sizes, the bituminous material is excluded.
[4] 
FABC top course shall be Mix No. 5 and bottom course shall be Mix No. 2.
TABLE 3
Bituminous Concrete Mixtures
Sieve
Grading of Total Aggregate*
(weight percent**)
Size
Gradation Mix No.
1
2
5
2-inch
100
--
--
1 1/2-inch
90 - 100
100
--
1-inch
--
90 - 100
--
3/4-inch
60 - 100
--
--
1/2-inch
--
60 - 80
100
3/8-inch
--
--
90 - 100
No. 4
25 - 60
25 - 60
60 - 80
No. 8
20 - 50
15 - 45
35 - 65
No. 16
--
--
--
No. 30
--
--
--
No. 50
8 - 30
3 - 18
6 - 25
No. 100
--
--
--
No. 200
4 - 12
1 - 7
4 - 10
Asphalt Cement
(weight percent of total mixtures)
3.5 - 8.0
4.0 - 8.5
5.0 - 10.0
NOTE: Material passing the No. 200 sieve may consist of fine particles of the aggregate or mineral filler or both. Material passing the No. 40 sieve shall be nonplastic when tested in accordance with the requirements of current American Association of State Highway Officials Designation T 90.
*
Course plus fine, plus filler if required.
**
Amounts finer than each laboratory sieve (square opening).
(e) 
Resistance to plastic flow. The bituminous mixture when combined in the proportions of the job mix formula shall conform to the design and control requirements of Table 3-B when tested in accordance with the requirements of current ASTM Designation D-1559.
TABLE 3-B
Design and Control Requirements
Test Limits
Mix No.
1
2
5
Criteria
Stone
Gravel
Stone
Stone
Design stability (lbs. min.)
1500
1100
1200
1200
Control stability (lbs. min.)
1200
800
900
900
Flow value (0.01 inch)
6-18
6-18
6-18
6-16
Design air voids (percentage)
3-7
3-7
3-7
3-6
Control air voids (percentage)
2-10
2-10
2-10
2-10
D. 
Traffic stripes (Section 14).
(1) 
Description (Article 3.14.1). Traffic stripes shall include the striping of pavements with white or yellow traffic paint and applying glass beads thereto.
(2) 
Materials (Article 3.14.2).
(a) 
White traffic paint shall conform to the requirements specified for Type 111, pure drying alkyd-chlorinated rubber vehicle in Article 8.6.14 of the state specifications, white traffic paint.
(b) 
Yellow traffic paint shall conform to the requirements specified for Type 111, pure drying alkyd-chlorinated rubber vehicle in Article 8.6.14A of the state specifications, yellow traffic paint.
A. 
Storm drains (Section 2).
(1) 
Materials (Article 5.2.2).
(a) 
Pipe shall be of a type listed herein as shown on the approved plans. No substitutions shall be permitted from that shown on the approved plan without the written approval of the Engineer.
(b) 
Reinforced concrete culvert pipe shall be Class III, Wall B, unless extra strength is required, in which case Class IV, Wall B, shall be used. All other requirements shall be in accordance with Article 8.7.5 of the state specifications.
(c) 
Corrugated metal culvert pipe and corrugated metal sewer pipe shall conform to the requirements of Article 8.7.6 of the state specifications and shall be furnished in the following minimum gauges:
Diameter
(inches)
15
18
21
24
30
36
42
48
54
60
66
72
78 - 90
Gauge
16
16
16
16
14
14
12
12
12
10
10
10
8
(d) 
Corrugated metal pipe arch and corrugated metal sewer pipe arch shall conform to the requirements of Article 8.7.7 of the state specifications and shall be furnished in the following minimum gauges:
Span
Rise
18
11
22
13
25
16
29
18
36
22
43
27
50
31
58
36
65
40
72
44
Gauge
16
14
14
12
12
10
10
8
8
8
(e) 
Structural plate pipe and pipe arch shall conform to the requirements specified therefor in Article 8.7.8 of the state specifications.
(f) 
Corrugated aluminum pipe and aluminum drains.
[1] 
Corrugated aluminum culvert pipe and pipe arch shall conform to the current requirements of AASHO Designation M196 and shall be furnished in the following minimum gauges:
Diameter
15
18
21
24
30
36
42
48
54
60 and larger
Gauge
16
16
14
14
12
12
10
10
10
8
Span
Rise
18
11
22
13
25
16
29
18
36
22
43
27
50
31
58
36
65
40
72
44
Gauge
16
14
14
12
12
10
10
8
8
8
[2] 
Aluminum drains shall only be permitted when the minimum cover is 24 inches for drains 36 inches in diameter or equivalent diameter and less. For drains greater than 36 inches in diameter, the minimum cover shall be 2/3 of the diameter.
(g) 
Reinforced concrete elliptical pipe shall conform to current AASHO Designation M207 and shall be Class HE-111 or VE-111 when standard strength is required and Class HE-IV or VE-IV when extra strength is required.
(h) 
Additional drain types may be permitted with the written approval of the Borough Engineer who will specify the requirements.
(2) 
Methods of construction (Article 5.2.3).
(a) 
Pipe shown on the plans or directed by the Engineer to be abandoned shall be plugged with Class C concrete as specified in Division 4, Section 1.
(b) 
Trench openings for pipes shall not remain open overnight within, or adjacent to, roadways on which traffic is being maintained or within the normal limits of pedestrian access, unless adequately protected to the satisfaction of the Engineer.
(c) 
The contractor shall maintain the roadways where storm drains are installed in good serviceable condition, and all abrupt depressions shall be immediately repaired to the satisfaction of the Engineer.
(d) 
The contractor shall maintain existing drainage flow during construction to the satisfaction of the Engineer until proposed drainage facilities are completed and put into service.
(e) 
Where the ends of pipes are to enter existing concrete or masonry walls, the pipe and wall shall be neatly cut to fit at the face of the wall and the pipe shall be grouted in place. Where pipes are to enter below the paved invert of existing structures, the contractor will be required to cut the existing concrete and shape a new channel, all as directed by the Engineer.
(f) 
The contractor shall construct any necessary ditches or trenches to keep the site and the work well drained at all times during the progress of the work.
B. 
Manholes, inlets and catch basins (Section 3).
(1) 
Methods of construction (Article 5.3.3). The concrete block and brick shall be laid with broken joints. All horizontal joints, all vertical joints of brick and all keyways of vertical joints of concrete block shall be filled with 1:2 cement-sand mortar. All horizontal joints and in brick, all vertical joints, shall be not more than three-eights-inch wide. The outside wall shall be plastered with a minimum of one-half-inch thickness of 1:2 cement-sand mortar, troweled to a smooth finish.
(2) 
Curb inlet castings shall be permanently set to final grade after adjacent curb back forms have been set to grade and before placement of concrete for the adjacent curb.
C. 
Curbs and headers (Section 5).
(1) 
Description (Article 5.5.1). Unless required otherwise by a governmental agency having jurisdiction, all curbing shall be six inches wide at the top, eight inches wide at the bottom and 18 inches deep. The reveal shall be six inches, except at driveways where a two-inch reveal shall be used. The top corners of the curb shall be rounded with a one-inch radius.
(2) 
Materials (Article 5.5.2). Concrete for curbs shall be air-entrained Class B as specified in Article 4.1.2. of the state specifications except as modified herein. Ultimate strength when tested by standard methods shall be not less than 4,000 pounds per square inch. The maximum water cement ratio shall be 5.5 gallons per sack.
(3) 
Methods of construction (Article 5.5.3).
(a) 
No concrete shall be poured between December 1 and March 1 of each year without the prior express written permission of the Engineer. Where such written permission is obtained, the Engineer shall specify the appropriate procedures to be followed from the state specifications whose requirements shall also apply from March to November in cold weather conditions.
(b) 
True joints shall be placed on a curb at ten-foot intervals. Backfilling for curbs shall be made within 72 hours after construction.
(c) 
Where the curb is to be constructed along lines having a radius of 250 feet or less, securely anchored curved forms shall be used. Multiple ten-foot long tangent straight forms will be permitted for curved curbs where the radius exceeds 250 feet, provided the ends of the tangents are finished to prevent the appearance of sharp angles. At street intersections the curb corners shall have a minimum radius of 20 feet.
D. 
Sidewalks (Section 8).
(1) 
Description (Article 5.8.1). Sidewalks shall have a minimum width of four feet and a minimum thickness of four inches, except in driveway areas where the thickness shall be increased to six inches. Unless directed otherwise by the Engineer, the far edge of all sidewalks shall be located on the right-of-way line.
(2) 
Materials (Article 5.8.2). Concrete for sidewalks shall be air-entrained Class C as specified in Article 4.1.2 of the state specifications except as modified herein. Ultimate strength when tested by standard methods shall be not less than 3,500 pounds per square inch. The maximum water cement ratio shall be six gallons per sack.
(3) 
Methods of construction (Article 5.8.3). Sidewalks shall be constructed with a slope towards the roadway of 1/4 inch per foot. The sidewalk shall be located at an elevation equivalent to 1/4 inch per foot from the top of the curb. Driveways in sidewalk areas and driveway aprons shall be six inches thick and reinforced with 66-1010 welded wire fabric.
E. 
Headwalls and culverts (Section 12).
(1) 
Description (Article 5.12.1). Unless specifically permitted otherwise by the Engineer, all discharge pipes shall terminate with an end section of the type permitted in the design specifications.
(2) 
Materials (Article 5.12.2). Corrugated metal end sections shall conform to the standard state details and the appropriate provisions of Division 5, Section 2, of the state specifications. Concrete end sections shall conform to the details furnished by the contractor and approved by the Engineer and to the appropriate provisions of Division 5, Section 2, of the state specifications. All shapes of cast-in-place concrete headwalls shall conform to the standard state details and the appropriate provisions of Division 4, Section 1.
(3) 
Methods of construction (Article 5.12.3). All preformed metal or concrete end sections shall be constructed on a cast-in-place Class C concrete cutoff wall at least eight inches thick, 12 inches deep and the width of the section. At the option of the Engineer, the cutoff wall may be increased in size or eliminated entirely.
F. 
Monuments (Section 13).
(1) 
Materials (Article 5.13.4). Monuments shall be Class A concrete as specified in Article 4.1.2 of the state specifications and shall be six inches square at the top and bottom and at least 30 inches long. Monuments shall be set firmly in the ground so as to be visible at all times.
A. 
General. All unpaved areas within the subdivision and all unpaved areas within the street rights-of-way shall be topsoiled, fertilized and seeded to provide a stabilized ground surface and prevent soil erosion. In difficult areas, all measures shall be taken to ensure the establishment of a satisfactory ground cover and shall include but not be limited to sodding, slope boards, jute matting and hay mulching. All work performed and all materials furnished shall be in accordance with the applicable provisions of Division 7 of the state specifications.
B. 
Planting (Section 10).
(1) 
Description (Article 7.10.1). Shade trees shall be planted along both sides of every street within the subdivision and along the abutting side of each street adjacent to the subdivision. Trees shall be planted off the street right-of-way in a five-foot strip behind the sidewalk and shall be at a maximum spacing of 50 feet.
(2) 
Materials (Article 7.10.2). Shade trees shall be nursery grown and shall be a minimum of two inches diameter at breast height and any one of the following types dependent upon the location of the subdivision:
(a) 
In areas adjacent to rivers, bays and lagoons, one of the following kinds of trees shall be planted:
[1] 
Honey Locust (Gleditsia triacanthos inermis).
[2] 
Oriental Plane (Platanus orientalis).
[3] 
Willow (Salix babylonica).
[4] 
Canoe Birch (Betula papyrifera).
[5] 
European White Birch (Betula alba pendula).
[6] 
Japanese Cherry (Prunus quanzan).
[7] 
Hawthorn (Crataegus).
(b) 
In the upland, which is away from rivers, bays and lagoons and not adjacent to large bodies of water, one of the following kinds of trees shall be planted:
[1] 
Pin Oak (Quercus palustris).
[2] 
Norway Maple (Acer platanoides).
[3] 
Honey Locust (Gleditsia triacanthos inermis).
[4] 
Crabapple (Malus).
[5] 
Mountain Ash, European (Sorbus aucuparia).
[6] 
Dogwood (Cornus florida, white) and (Cornus florida rubra, pink).
[7] 
European White Birch (Betula alba pendula)
C. 
Screening strips/buffers.
[Added 12-17-2007 by Ord. No. 16-2007]
(1) 
Screening strip/buffer areas are required along all lot lines and street lines which separate a nonresidential use from either an existing residential use or a residential zoning district.
(2) 
If a residential use is proposed next to a commercial uses then the residential use shall provide the appropriate buffer. Where a residential use on a single lot is proposed bordering a nonresidential use, the single lot shall provide a ten-foot-wide buffer.
(3) 
Buffer areas shall be developed in an aesthetic manner for the primary purposes of screening views and reducing noise perception beyond the lot. Buffer widths shall be measured horizontally and perpendicularly to lot and street lines. No structure, activity, storage of materials, or parking of vehicles shall be permitted in a buffer area. The standards for the location and design of buffer areas are intended to provide flexibility in order to provide effective buffers. The location and design of buffers shall consider the use of the portion of the property being screened, the distance between the use and the adjoining property line, differences in elevations, the type of buffer, such as dense planting, existing woods, a wall or a fence, buffer height, buffer width, and other combinations of man-made and natural features. The buffer shall be designed, planted, graded, landscaped and developed with the general guideline that the closer a use or activity is to a property line, or the more intense the use, the more effective the buffer area must be in obscuring light and vision and reducing noise beyond the lot.
(4) 
When buffers are required, building setbacks shall be measured from the buffer line.
(5) 
All buffer areas shall be planted and maintained with either grass or ground cover, together with a screen of live shrubs or scattered planting of live trees, shrubs, or other plant material meeting the following requirements:
(a) 
The preservation of all natural wooded tracts shall be an integral part of all site plans and may be calculated as part of the required buffer area, provided the growth is of a density and the area has sufficient width to serve the purpose of a buffer. Where additional plantings are necessary to establish an appropriate tone for an effective buffer, the plantings may be required;
(b) 
Plant materials used in screen planting shall be at least three feet in height when planted and be of such density as will obscure, throughout the full course of the year, the glare of automobile headlights emitted from the premises. Such strips shall consist of, but not be limited to, dense evergreen growth or other approved plantings or, in the absence of natural evergreen growth, densely planted evergreens from the ground to a height of not less than eight feet. The buffer must provide year-round screening. In instances where new planting is required to provide said screen, such planting shall attain a height of not less than five feet after one growing season and not less than eight feet after three growing seasons;
(c) 
The screen planting shall be so placed that at maturity it will not be closer than three feet to any street or property line (where possible);
(d) 
Trees shall be at least five feet in height and 1 1/2 inches in diameter, measured at 6 inches above the ground, when planted and be of species common to the area, be of nursery stock, and be free of insects and disease;
(e) 
Screening strips shall be at all times properly maintained so as not to become unsightly. Any plant material which does not live shall be replaced within one year or one growing season;
(f) 
Screen plantings and landscaping shall be broken at points of vehicular and pedestrian ingress and egress to assure a clear sight triangle at all street and driveway intersections.
(6) 
Wherever this chapter imposes a landscaping or seeding requirement, natural vegetation may be substituted in all areas where it exists and has attained a height of at least six feet. The landscaping and seeding requirement shall still apply, however, in all areas not so covered.
(7) 
A buffer zone shall be provided in conjunction with any nonresidential use abutting a lot zoned for residential purposes or occupied by a residential use. Such buffer requirements shall apply to every property line that abuts a residentially zoned or used lot. The minimum width of such buffer zone shall be 30 feet.
(8) 
A screening strip shall be required between land which is zoned for multifamily use and which is adjacent to a single-family residential use or zone. In addition, any special use in any residential zone shall provide a screening strip along any property line that adjoins a single-family residential use or zone.
A. 
Street signs.
(1) 
Materials. There shall be one sign assembly mounted at each intersection and each street will be clearly marked.
(2) 
Unless approval for other types is given by the Engineer, each sign unit shall consist of four sign plates with theftproof fixtures and hardware for assembling and mounting on a steel post.
(3) 
The background for the sign shall be green with white letters and shall be of similar design and construction as presently utilized by the Borough. Posts shall have a two-inch inside diameter, galvanized steel 10 feet six inches in length embedded in a twelve-inch circular concrete anchor three feet deep along each post. There shall be one-half-inch hole drilled six inches from the bottom of each post to accommodate an anchor rod 1 1/2 by nine inches, which shall be furnished with each post.
B. 
Sanitary sewers. All sanitary sewerage facilities shall be constructed in accordance with all current regulations, as applicable, of the Tuckerton Board of Health, the Tuckerton Municipal Utilities Authority, the New Jersey Department of Health and the appropriate provisions of these specifications and the state specifications.
C. 
Water supply facilities. All water supply facilities shall be constructed in accordance with all current regulations, as applicable, of the Tuckerton Board of Health, the New Jersey Water Policy and Supply Council, the franchised water company and the appropriate provisions of these specifications and the state specifications.
D. 
Traffic control signs and devices. All traffic control signs and devices shall be in accordance with the manual on Uniform Traffic Control Devices for Streets and Highways adopted by the United States Department of Transportation, dated 1971.