The Township Engineer on this date __________ has reviewed and
hereby approves the stormwater management site plan as meeting all
design standards and criteria of the Stormwater Management Ordinance
of Mount Joy Township.
| ||
---|---|---|
|
| |
Secretary
|
Township Engineer
| |
I, ________________, hereby acknowledge that the stormwater
management facilities as depicted within the stormwater management
site plan are permanent fixtures that can be altered, modified or
removed only after approval of a revised stormwater management site
plan by the Township Engineer.
| ||
|
| |
Title Owner
|
Date
|