A.
Placement; marking. Monuments and markers must so be placed that the scored or marked point coincides exactly with the point of intersection of the lines being monumented. They must be set so that the top of the monument or marker is level with the surface of the surrounding ground. Monuments must be marked on top with a copper or brass dowel.
D.
Removal. Any monuments or markers that are removed must be replaced by a registered engineer or surveyor at the expense of the person removing them.