Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Monroe, CT
Fairfield County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
This work shall include placing and shaping topsoil on all unpaved areas within the street right-of-way, within drainage easements and in grassed ditches. The depth of topsoil shall be six inches.
Material for this work shall conform to the requirements for topsoil in State Form 810, Article M.13.01-1.
A. 
The areas on which topsoil is to be placed shall be graded to a reasonably true surface. Topsoil shall then be spread and shaped to the lines and grades shown on the plans or as directed by the Town Engineer. The depth of six inches to which the topsoil is to be placed is that required after settlement of the material has taken place. All stones, roots, debris, sod, weeds and other undesirable material shall be removed. After shaping and grading, all trucks and other equipment shall be excluded from the topsoiled area to prevent excessive compaction. The contractor shall perform such work as required to provide a friable surface for seed germination and plant growth prior to seeding.
B. 
During hauling and spreading operations, the contractor shall immediately remove any material dumped or spilled on the shoulders or pavement.
C. 
It shall be the contractor's responsibility to restore to the line, grade and surface all eroded areas with approved material and to keep topsoiled areas in acceptable condition until accepted by the Town.