Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Rockwood, MI
Wayne County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the City Council of the City of Rockwood 4-17-2002. Amendments noted where applicable.]
A. 
Dog license fee: $10.
B. 
Dog license issued prior to May 15 of each year: $5.
C. 
Dog license fee (new resident): $5.
D. 
Dog license fee for dog licensed within 30 days after attaining age of four months: $5.
E. 
After thirty-day time limit: $10.
F. 
Duplicate dog tags: $0.25
G. 
Redemption: $15.
A. 
Engineering review fees.
(1) 
Subdivisions and site condominiums.
(a) 
Checking closure, lot areas: $500 plus $20 per lot. (This amount to be deposited by the developer.)
(b) 
Review and processing of grading utilities, paving, storm sewers, sanitary sewers, water mains, retention basins and pump stations: 1.0% of construction cost for projects. (This amount to be deposited by the developer based upon the Engineer's estimate.)
(c) 
Field check to assure monuments and property irons are installed within one year of recording of the plat: to be billed to the developer on a time basis in accordance with the then Standard Rate Schedule as established by the City Engineers. (To be deducted from escrow account established to insure irons and monuments are installed.)
(d) 
Full-time inspection of grading, utilities, paving, sanitary sewers, storm sewers, water mains, detention basins, pump stations and all other site improvements: Charges are based upon hourly rate of the Standard Rate Schedule as established by the Engineer and the City. This amount to be deposited by the developer, based upon Engineer's estimate, shall be 6% of the first $100,000 of construction cost, 4% of the next $100,000 of construction cost, and 3% of the remaining construction costs of the improvements.
(2) 
Apartment complexes and attached condominiums.
(a) 
Site plan review for compliance with all ordinances and standards: $500 plus $15 per unit or any part thereof. (This amount to be deposited by the developer.)
(b) 
Grading, paving, sanitary sewer, water mains and storm sewers other than building leads: 1.0% of the construction of each utility. (This amount to be deposited by the developer based upon Engineer's estimate.)
(c) 
Full-time inspection of the construction for grading, paving, storm sewers, sanitary sewers, water mains, and other utilities to be dedicated to the City: Charges are based upon hourly rate of the Standard Rate Schedule as established by the Engineer and the City. This amount to be deposited by the developer, based upon Engineer's estimate, shall be 6% of the first $100,000 of construction cost, 4% of the next $100,000 of construction cost, and 3% of the remaining construction costs of the improvements.
(3) 
Industrial and commercial developments.
(a) 
Site plan review for compliance with all ordinances and standards: $500 plus $25 per acre or any part thereof. (This amount shall be deposited by the developer.)
(b) 
Sanitary sewers, water mains, storm sewers, grading, paving, and other site improvements: 1.0% of construction cost of each site improvement. (This amount shall be deposited by the developer.)
(c) 
Full-time inspection of construction of grading, roadways, storm sewers, sanitary sewers, water mains, retention basins and other utilities to be dedicated to the City. Charges are based upon hourly rate of the Standard Rate Schedule as established by the Engineer and the City. This amount to be deposited by the developer, based upon Engineer's estimate shall be 6% of the first $100,000 of construction cost, 4% of the next $100,000 of construction cost, and 3% of the remaining construction costs of the improvements.
B. 
Zoning fees.
(1) 
Rezoning fee: Each petitioner requesting or petitioning for rezoning under or by amendment to the City of Rockwood Zoning Ordinance shall at the time of filing such petition pay to the City of Rockwood the following nonrefundable rezoning filing fee or charge as a condition of and prior to the City's administrative processing of such petitions for rezoning or amendment:
(a) 
All districts, except as provided in 1(B): a minimum charge of $500 which shall include the first five acres or less petitioned to be rezoned plus a planning consultant fee of $450 and, thereafter, $10 per acre for each additional acre or portion thereof included in such petition for rezoning.
(b) 
Owner-occupied individual single-family or two-family dwelling units: $100 for petitions to rezone single lots to residential zones.
(2) 
Zoning Board of Appeals fee. Each person filing an appeal with the City of Rockwood Zoning Board of Appeals and Adjustments shall at the time of filing its appeal pay to the Secretary of the Board of Appeals the following nonrefundable fee or charge as a condition of and prior to the City's administrative processing of such appeal by the Zoning Board of Appeals and Adjustments:
(a) 
For any appeal involving residentially zoned property: $100.
(b) 
For any appeal involving commercially zoned property, except for individual single-family or two-family dwelling units within a commercial zone, which shall be required to pay the fee in Subsection B(1): $250.
(c) 
For any appeal involving industrially zoned property, except for individual single-family or two-family dwelling units within an industrial zone, which shall be required to pay the fee in Subsection B(1): $300.
(d) 
For a petition for use variance review in any zoning classification: $450
(3) 
Lot splitting fee. Each person requesting or petitioning the City of Rockwood for approval of a lot split shall, at the time of filing its petition or request, pay to the City of Rockwood the following nonrefundable lot split fee or charge as a condition of and prior to the City's administrative processing of such petition for lot splitting: $200 plus $20 per lot resulting.
(4) 
Site plan review fees. Each person requesting a site plan review as provided for and required under the zoning and other ordinances of the City of Rockwood shall at the time that that such site plan review is requested pay to the City of Rockwood the following nonrefundable site plan review fees or charges as condition of and prior to such site plan review procedures being instituted by the City:
(a) 
Multiple family (R-B and R-C Districts): $400 plus $6 per dwelling unit. For each submission of a revised site plan, 60% of the original fee shall be charged.
(b) 
Commercial and industrial development (M-1, M-2, PF-1, CM-1, B-1, B-2, B-3, O-1, O-R and F-S Districts): $475 plus $50 per acre or fraction thereof. For each submission of a revised site plan, 60% of the original fee shall be charged.
(c) 
Mobile home park: $600 plus $6 per site. For each submission of a revised site plan, 60% of the original fee shall be charged.
(d) 
Planned unit development (PUD): $500 plus $50 per acre for any nonresidential area plus $6 per dwelling unit for any residential component. For each submission of a revised site plan, 60% of the original fee shall be charged.
(e) 
Other use (office/institutional): $425 plus $50 per acre or fraction thereof. For each submission of a revised site plan, 60% of the original fee shall be charged.
(f) 
Subdivision review: Conventional or cluster subdivision, preliminary plan.
[1] 
Preliminary plat review: $600 plus $6 per lot.
[2] 
Final plat review: $150 plus $1 per lot.
[3] 
For each submission thereafter of a revised plat under D(6)(a) and (b) above, 60% of the original fee shall be charged.
(g) 
Subdivision site plans or site condominiums: the same fee as D(6)(a) above. Each revision of plans shall be accompanied by a fee equal to 60% of the original fee charged.
(5) 
Special approval or conditional use (all districts): $250 in addition to site plan review fee.
(6) 
Application to schedule special meeting (A special meeting is any meeting not held at a regularly scheduled date.):
(a) 
City Council: $500 plus all costs incurred for consultants and legal fees.
(b) 
Planning Commission: $400 plus all costs incurred for consultants and legal fees.
(c) 
Zoning Board of Appeals: $300 plus all costs incurred for consultants and legal fees.
(7) 
Special City Planner, City Attorney and City Engineer costs. Conferences, meetings or field inspections by City consultant(s) (City Planner, City Attorney, or City Engineer) as requested by the applicant or required by the City shall be the actual costs incurred for consultants, planner or attorney. Such charges shall apply to any special meeting, special review or special service requested by the applicant or required by the City as part of the review process for any of the applications covered by the above fee schedule.
(8) 
Waiver provision. The fees established by this resolution may be waived upon a determination by the City Council that a hardship exists.
A. 
Electrical permit fees:
(1) 
New single-family residence: $125, includes the following:
(a) 
Up to and including 200 amp service.
(b) 
One furnace.
(c) 
One humidifier.
(d) 
One air cleaner.
(e) 
One garbage disposal.
(f) 
Up to and including 15 circuits.
(g) 
One range hood.
(h) 
One range plug (120 or 240 volts).
(i) 
One utility circuit (120 volts).
(j) 
Up to and including five smoke detectors ($5 each additional smoke detector).
(k) 
One rough inspection.
(l) 
One final inspection.
(2) 
All permits, excluding new homes, base fee: $25.
Service
(amperes)
Fee
Through 200
$10
Over 200 to 600
$15
Over 600 to 800
$20
Over 800
$25
(3) 
Unit charges.
Miscellaneous:
Circuits (each)
$3.00
Lamps/outlets/fixtures, each
$0.50
Dishwasher, garbage disposal and range hood
$4.00
Furnace or unit heater/water heater, each
$5.00
Electrical heating units (baseboards), each
$4.00
Power outlets including ranges, dryers, etc., each
$7.00
AC Units w/interruptible or uninterruptible
$10.00
Air cleaners (commercial), per
$5.00
Humidifiers
$5.00
HVAC
$7.00
Feeders, bus duct, per 50 feet and fraction thereof
$6.00
Signs, per circuit
$5.00
Mobile home site, each
$6.00
Recreational vehicle site, each
$4.00
Transformers/industrial; ovens/machinery:
KVA and horsepower (each up to)
20 KVA or horsepower
$6.00
21 to 50 KVA or horsepower
$10.00
51 or over KVA or horsepower
$12.00
Fire alarm systems and smoke detectors:
Up to 10 stations and horns
$50.00
10 to 20 stations and horns
$100.00
Over 20 stations and horns, each
$5.00
Solar units:
Per hour
$25.00
(4) 
Special inspections and miscellaneous fees:
Type
Fee
Inspections, hourly rate
$25
Additional inspections
$20
Final inspections
$20
Reinspections
$20
Reoccupancy of commercial/industrial building
$20
No permit secured
$100
(5) 
Plan review. The plan review fee shall be 5% of the building permit fee as follows:
(a) 
Minimum: $10.
(b) 
Maximum: $100.
B. 
Plumbing permit fees:
(1) 
New single-family residence: $125.
(2) 
Base fee, all permits, excluding new homes: $25.
(3) 
Unit charges:
Fixtures: $5.00 each item
Bathtub
Shower stall with valve and
Bidet
trap
Dental chair
Sink, any description
Dishwasher
Soda fountain or bar, each
Drain (acid, waste,
waste opening
Condensate, etc.
Solar system
Drinking fountain
Stack soil, revent, each
Floor drain
waste inside conductor
Grease trap
Sump pump and pit
House bibb
Vacuum breaker
Humidifier
Vent damper
Laboratory (hospital/clinic),
Washing machine connection
fixture, equipment, device
Water closet
Laundry tray
Water-connected appliances
Lavatory
(equipment)
Reduced pressure and
Water disposal (garbage)
backflow preventer
Water filter
Sewage ejector with receptor
Water softener connection
Other fixtures not included in this section @ $5.
Hot water tank:
Residential
$10
Commercial
$30
Building drains:
Size of Line
(diameter in inches)
Fee
(each 100 linear feet or fraction thereof)
Not exceeding 6
$20
Not exceeding 8
$30
Not exceeding 10
$40
12 and over
$50
Water distribution/water service:
Size at Meter
(inches)
Fee
3/4
$11
1
$13
2
$15
3
$17
4
$21
Exceeding 4
$25
Storm or sanitary sewers:
Size of Line
(diameter inches)
Fee
(each 100 linear feet or fraction thereof)
6 to 12
$30
Not exceeding 15
$40
Not exceeding 18
$50
Not exceeding 21 and over
$60
24 and over
$70
Manhole
$20
Catch basins or inlet
$20
Change crock to iron
$30
(4) 
Special inspections and miscellaneous fees:
(a) 
Failure to secure a permit: $100 or double permit fee, whichever is greater.
(b) 
Reinspection (not ready or unattainable): $25.
(c) 
Rough inspection: $25.
(5) 
Plan review fee: The plan review fee shall be 5% of the building permit fee as follows:
(a) 
Minimum: $10.
(b) 
Maximum: $100.
C. 
Mechanical permit fees.
(1) 
New single-family residence: $125.
(2) 
Base fee: $25.
(3) 
Unit charges. In addition to the base fee, there shall be a per-unit charge as follows:
Air conditioning units:
Over 1 HP to HP
$20
Over 5 HP to 20 HP
$30
Over 20 HP to 50 HP
$50
Over 50 HP
$80
Air handlers, multizone, self-contained units, ventilation and exhaust fans:
Residential
$10
Under 1,500 CFM
$20
1,500 to 10,000 CFM
$40
Over 10,000 CFM
$50
Chimneys and vents, all types
$25
Cooling towers with reservoir capacity:
Under 500 gallons
$35
Over 500 gallons
$65
Dampers
Distribution systems
$15
Residential (duct work)
$20
Under $3,000
$20
$3,000 to $6,999
$40
Over $7,000
$50
Electronic air cleaner:
Residential
$10
Commercial
$30
Heating equipment:
Under 500,000 BTU input
$30
Over 500,000 BTU input
$60
Gas piping or repiping
$25
Hot water tanks:
Residential
$10
Commercial
$30
Humidifiers:
Residential
$10
Commercial
$20
LPG and fuel oil tanks:
Under 500 gallons
$30
Over 500 gallons
$60
Oil burners:
Under 5 gallons (1 hour)
$30
Over 5 gallons (1 hour)
$40
Refrigeration, commercial
Under 5 HP (split system)
$25
5 HP to 50 HP (split system)
$50
Over 50 HP (split system)
$75
Solar equipment, each panel:
Residential
$15
Commercial
$20
Wood-burning equipment:
Vent connectors under 10 inches
$40
Vent connectors over 10 inches
$50
Unified pressure vessels (air tanks, steam, etc.):
16 inches in diameter or less
$20
16 inches to 36 inches
$25
Over 36 inches
$30
(4) 
Unit charges.
Miscellaneous:
Circuits, each
$3.00
Lamps, each
$0.50
Dishwasher, garbage disposal and range hood
$4.00
Furnace or unit heater, each
$5.00
Electrical heating units (baseboards), each
$4.00
Power outlets (including ranges, dryers, etc.), each
$7.00
AC units w/interruptible or uninterruptible
$10.00
Air cleaners (commercial), per
$5.00
Humidifiers
$5.00
HVAC
$7.00
Feeders, bus duct, per 50 feet and fraction thereof
$6.00
Signs, per circuit
$5.00
Mobile home site, each
$6.00
Recreational vehicle site, each
$4.00
Transformers, machinery, etc:
KVA and horsepower (each up to):
20 KVA or horsepower
$6.00
21 to 50 KVA or horsepower
$410.00
51 or over KVA or horsepower
$12.00
Fire alarm systems:
Fire alarm, up to 10 stations and horns
$50.00
10 to 20 stations and horns
$100.00
Over 20 stations and horns, each
$5.00
Solar units:
Per hour
$25.00
Special inspections and miscellaneous fees:
Inspections, hourly rate:
$25.00
Additional inspections
$20.00
Final inspections
$20.00
Reinspections
$20.00
Reoccupancy of commercial/industrial building
$20.00
No permit secured
$100.00
(5) 
Plan review. The plan review fee shall be 5% of the building permit fee as follows:
(a) 
Minimum: $10.
(b) 
Maximum: $100.
D. 
Building Department fee schedule:
(1) 
Building permit fees: based on the BOCA Methodology and the BOCA construction cost tables.
(2) 
Plan review fee:
(a) 
For all new structures, including residential, commercial and industrial buildings; additions; alterations; and accessory structures, the plan review fee shall be paid at the time of submission of the plans for review and be paid in addition to any permit fees.
(b) 
Single-family residential:
[1] 
One dollar for each $1,000 of construction costs, or fraction thereof.
[a] 
Minimum fee: $5.
[b] 
Maximum fee: $200.
[2] 
Commercial, industrial, multifamily:
Square Feet
Fee
Less than 12,000
$300
12,001 to 50,000
$500
Over 50,000, for each 1,000 square feet or fraction thereof
Additional $5
(c) 
Outside review service may be used at the option of the City. Fee for services will be the actual charge to the City.
(3) 
Floodplain evaluation fee: $20.
(4) 
Construction permit fee. Any work commencing prior to issuance of a permit shall be charged a double permit fee.
Cost
Fee
Minimum for first $1,000 or fraction thereof
$30
$1,001 to $50,000
$30 plus $5 for each $1,000 or fraction thereof
$50,001 to $500,000
$275 plus $4 for each $1,000 or fraction thereof over $50,000
Over $500,000
$2,275 plus $3 per $1,000 or fraction thereof over $500,000
(5) 
Fast-track construction permits: The fees for permits issued to begin construction of foundations or site work or other preliminary construction work pending issuance of a regular full permit shall be as follows:
(a) 
Residential: $50.
(b) 
Commercial/industrial: $50 plus 5% of construction cost.
(6) 
Revised permits:
(a) 
Residential permits: $15 plus $5 for each $1,000 of increased construction cost or fraction thereof.
(b) 
Commercial/industrial: $25 plus $7 for each $1,000 of increased construction cost or fraction thereof.
(7) 
Builders performance bonds: The City of Rockwood shall require a cash bond or surety bond for each building permit for performance of cleaning up after a job has been completed. Said bond shall be returned to the builder at the time a final certificate of occupancy is issued. Said cash bond or surety bond is not returnable if the City must clean up in the event the builder fails to so perform.
Type of Job
Bond
Job up to $5,000
$50
$5,000 to $10,000
$150
$10,001 to $100,000
$500
Multiple housing
2% estimated cost
Commercial
2% estimated cost
Industrial
2% estimated cost
(8) 
Demolition permits:
Building or Structure
Fee
Accessory buildings
$15
Residential buildings (1 or 2 stories)
$30
Residential buildings (3 or more stories)
$50
Commercial buildings
$50
Industrial buildings
$100
Pools (in-ground)
$30
(9) 
Permit for moving a building:
(a) 
The permit fee for moving a building or structure from its locations on a parcel of land to some other location with or without passing over or going upon a public street or way shall be as follows:
[1] 
Structure moved 1/4 mile or less: $150.
[2] 
Structure moved over 1/4 mile: $150 plus $30 per each additional one quarter mile.
(b) 
Prior to issuance of a moving-of-a-building permit by the Building Department, approval of the date, time schedule, route and destination must be obtained from the Department of Public Services, Traffic Safety Division, the City Engineer and the Fire Marshal.
(10) 
Sign permit fee:
Type of Sign
Fee
Permanent signs
Wall-mounted or painted
$30
Freestanding ($1/sq. ft.), minimum
$30
Face change only
$25
Awning signs
$30
Temporary signs (30 days maximum)
$20
(11) 
Sidewalk permit fee:
(a) 
Up to 50 feet (10 squares): $15.
(b) 
Over 50 feet $15 plus $0.10 per additional linear foot.
(12) 
Fence permit fee:
(a) 
Fence permit: $5.
(b) 
Fence location and posthole inspection: $15 per visit.
(13) 
Swimming pool permit fee:
Type of Pool
Fee
Above-ground
$30
Below-ground
$50
Annual inspection
$25
(14) 
Reception antennas permit fee:
(a) 
Residential: $30.
(b) 
Commercial/industrial: $45.
(15) 
Temporary structures/trailers permit fee: $30.
(16) 
Inspection fees:
Type
Fee
Hourly rate
$30
Reinspection (work not ready for inspection):
$30
First reinspection for original violations
N/C
Subsequent reinspections
$30
Zoning inspection
$30
Change of occupancy/continuation of use inspection
$30
Certificate of occupancy inspection
$20
Temporary certificate of occupancy inspection
$20
Stop-work order, each site
$20
Sprinkler system
$50
Building grade:
Residential
$30
Commercial
$40
Special inspection
Actual charge to the City
(17) 
Cancellation and refund: Upon written request by the permit holder, prior to commencement of any work, a permit may be canceled and the permit fee refunded. A fee of $15 will be retained by the City to defer administrative expenses. Review fees are nonrefundable.
(18) 
Renewal: The fee for renewing expired permits shall be 25% of the original permit fee.
(19) 
Transfer of a building permit (written authorization by original permit holder required): $20.
(20) 
Contractor's registration fees:
Type of Contractor
Fee
Residential builder
$25
Maintenance and alterations contractor
$20
Sign erector
$20
Asphalt paving contractor
$20
Fence erector
$20
Wrecking contractor
$20
Excavating contractor
$15
Commercial building contractor
$25
Reception antennas installer
$20
Certificate of insurance
$15
See Chapter 45, Building Construction.
A. 
Quarry excavations:
(1) 
Application fee: $500.
(2) 
Annual inspection fee: $100.
B. 
Removal or filling operations permit:
Acres
Fee
5 or less
$20
More than 5 but not more than 10
$30
More than 10 but not more than 20
$50
More than 20
$100
See Chapter 45, Building Construction.
A. 
Article I, Cable Television Communications Franchise:
(1) 
For a new or initial franchise: $3,000.
(2) 
For renewal of a franchise: $1,500.
(3) 
For a transfer of a franchise (other than a pro forma transfer): $1,000.
(4) 
For a pro forma transfer of a franchise: $500.
(5) 
For modification of a franchise agreement pursuant to 47 U.S.C. § 545: $1,000.
(6) 
For any other relief: $500.
B. 
Article III, Electrical Franchise:
(1) 
Nonrefundable application fee: $1,500.
(2) 
Amount of actual expenses resulting from the process of adopting Article III, which shall together with the application fee not exceed: $2,500.
A. 
Wastewater discharge permit: $25
A. 
Article I, Street Openings, Excavations and Obstructions:
(1) 
Street opening permit: $3.
(2) 
Cash deposit: $50.
[Amended 5-21-2014]
Schedule of Parking Fines
(IF YOU PAY)
Offense
Within 72 Hours
After 72 Hours
Snow emergency
$100
$125
Parking in a handicapped area
$75
$100
Parking between sidewalk and curb
$25
$50
Parking in fire lane
$75
$100
Parking on private property
$50
$75
Traffic hazard
$25
$50
Blocking traffic
$75
$100
Blocking a driveway
$25
$50
Parking facing wrong way
$25
$50
Parking in a no stopping/standing or parking zone
$50
$75
All other parking violations
$10
$20
A. 
Fines increase if not paid within 72 hours.
B. 
An additional penalty may be assessed if it is necessary to issue an arrest warrant.
C. 
The Violation Bureau is located at 32409 Fort Street, Rockwood, Michigan 48173.
D. 
Office hours are Monday through Friday, 9:00 a.m. to 5:00 p.m.
A. 
Water rates.
(1) 
Meter charges. A meter charge shall be paid each quarter by each user of water from the City water system, according to the following schedule:
Meter Size
(inches)
Charge
3/4 or less
$2.00
1
$2.50
1 1/2
$2.75
(2) 
Rates inside City. The following rates shall apply in the City to all users of water from the City's water system.
(a) 
Wholesale users. Wholesale users shall pay a charge determined in each case by Council.
(b) 
Other than wholesale users. Users other than wholesale users shall pay a rate or charge of $1.46 per 1,000 gallons or fraction thereof of water used in each quarter. Users of over 750,000 gallons in a quarter shall pay a charge or rate of $0.97 per 1,000 gallons or fraction thereof of water used in the quarter, or shall pay for such quarterly water usage at the prevailing wholesale rate.
(c) 
Minimum rate. All bills shall be subject to a minimum rate of $5.35 per quarter for water used in the quarter, except that the minimum charge shall not apply to users who:
[1] 
Are citizens of the City and reside within the City limits;
[2] 
Are 65 years of age or older;
[3] 
Quality for a senior citizens real property tax exemption under the laws of the state;
[4] 
Use water supplied to them by the City for their own personal residential use and consumption, and for the personal residential use and consumption of their spouse, children and others residing with them, to such an extent that they qualify as dependents under federal income tax laws; and
[5] 
Are liable for payment of water service supplied to their place of residence.
Such five qualifications must coexist in time with respect to a user in order to qualify the user for a minimum charge exemption.
(3) 
Rates outside City. Users of water from the City water system who are outside the City shall pay a rate of $2.50 per 1,000 gallons or fraction thereof of water used in each quarter.
B. 
Sewer rates. The following charges for sewage disposal service shall be levied upon all premises having any sewer connection with the public sewers:
(1) 
Rates inside City. The following rates shall apply within the City to all users of the City's public sanitary sewers for the discharge by such users of sewage into the City's sanitary sewers:
(a) 
Wholesale users. Wholesale users shall pay a charge determined in each case by Council.
(b) 
Other than wholesale users. Users other than wholesale users shall pay for the treatment of sewage discharged by such users into the City's sanitary sewer a rate or charge of $2.55 per quarter per 1,000 gallons or fraction thereof of water used by such user in each quarter.
(2) 
Industrial surcharge rate. Where it is determined that the character of sewage from any manufacturing or industrial plant, building or premises in the City is such that it imposes an unreasonable additional burden upon the City's sewerage system, and that the services necessary to treat such sewage are above that imposed by the average sewage being treated, such manufacturing or industrial plant, building or premises shall, in addition to the rates established for sewage treatment as provided for in this chapter, pay an additional quarterly sewage treatment surcharge, as established by Council in each case, for such additional services necessary to treat such sewage discharge.
C. 
Replacement charge. In addition the rates set forth in Subsection B(1) and (2), a replacement charge of $8.35 per unit basis (see § 254-7 of Chapter 254 of the Code of the City of Rockwood) per month shall be charged to all users of the City's public sanitary sewer to fund the capital costs of upgrading and maintaining the wastewater treatment plant.
D. 
Debt charge. A debt charge of $9.10 per unit basis (see § 254-7 of Chapter 254 of the Code of the City of Rockwood) per month shall be charged to all users of the City's public sanitary sewer to fund the debt service for bonds issued to pay for the upgrade of the wastewater treatment plant.
[1-21-1998]
E. 
Other charges.
(1) 
Sanitary sewer tap-in charge: $1,500.
(2) 
Storm sewer tap-in fee: $225
(3) 
Water tap-in fee charge (one-inch line): $1,250.
(4) 
Water privilege charge (per unit): $150.
(5) 
Water connection applications:
(a) 
$450 for a one-inch line.
(b) 
$450, plus engineering costs, labor and materials, for lines in excess of one inch.
(6) 
Plumber's bond: $100
(7) 
More than one trip to make an inspection or to set a meter: $1 for each additional trip.
(8) 
Water meter reader: $20
(9) 
Deposit: not less than $25
(10) 
Water turn-on charge: $10
A. 
Weed cutting fees: $200 per hour.
[Added 11-17-2010]
A. 
Police Department.
(1) 
Police officer, Full-time: $37.75 per hour.
(2) 
Police officer, Part-time: $30 per hour.
(3) 
Police Chief: $46.50 per hour.
(4) 
Police Sergeant: $40.45 per hour.
(5) 
Police Clerk Typist: $26.32 per hour.
(6) 
Vehicle costs: $25 per hour.
(7) 
Attorney's fees: $100 per hour.
(8) 
Lodging (jail): $35 per day.
(9) 
Reports:
(a) 
Accident report: $10.
(b) 
Incident report: by the page.
(10) 
PBT (preliminary breath test): $5.
B. 
Finger Prints.
(1) 
Nonresident: $25.
(2) 
Resident: $15.
C. 
Gun registration, notary: $10.
D. 
Records check: $10.
E. 
Bond posting: $10.
F. 
Drunk driving base fee: $262.50 (officer, minimum of three hours; prosecution minimum of one hour; administrative fee $50).