[HISTORY: Adopted by the City Council of
the City of Rockwood 4-17-2002. Amendments noted where applicable.]
A.
Engineering review fees.
(1)
Subdivisions and site condominiums.
(a)
Checking closure, lot areas: $500 plus $20 per
lot. (This amount to be deposited by the developer.)
(b)
Review and processing of grading utilities,
paving, storm sewers, sanitary sewers, water mains, retention basins
and pump stations: 1.0% of construction cost for projects. (This amount
to be deposited by the developer based upon the Engineer's estimate.)
(c)
Field check to assure monuments and property
irons are installed within one year of recording of the plat: to be
billed to the developer on a time basis in accordance with the then
Standard Rate Schedule as established by the City Engineers. (To be
deducted from escrow account established to insure irons and monuments
are installed.)
(d)
Full-time inspection of grading, utilities,
paving, sanitary sewers, storm sewers, water mains, detention basins,
pump stations and all other site improvements: Charges are based upon
hourly rate of the Standard Rate Schedule as established by the Engineer
and the City. This amount to be deposited by the developer, based
upon Engineer's estimate, shall be 6% of the first $100,000 of construction
cost, 4% of the next $100,000 of construction cost, and 3% of the
remaining construction costs of the improvements.
(2)
Apartment complexes and attached condominiums.
(a)
Site plan review for compliance with all ordinances
and standards: $500 plus $15 per unit or any part thereof. (This amount
to be deposited by the developer.)
(b)
Grading, paving, sanitary sewer, water mains
and storm sewers other than building leads: 1.0% of the construction
of each utility. (This amount to be deposited by the developer based
upon Engineer's estimate.)
(c)
Full-time inspection of the construction for
grading, paving, storm sewers, sanitary sewers, water mains, and other
utilities to be dedicated to the City: Charges are based upon hourly
rate of the Standard Rate Schedule as established by the Engineer
and the City. This amount to be deposited by the developer, based
upon Engineer's estimate, shall be 6% of the first $100,000 of construction
cost, 4% of the next $100,000 of construction cost, and 3% of the
remaining construction costs of the improvements.
(3)
Industrial and commercial developments.
(a)
Site plan review for compliance with all ordinances
and standards: $500 plus $25 per acre or any part thereof. (This amount
shall be deposited by the developer.)
(b)
Sanitary sewers, water mains, storm sewers,
grading, paving, and other site improvements: 1.0% of construction
cost of each site improvement. (This amount shall be deposited by
the developer.)
(c)
Full-time inspection of construction of grading,
roadways, storm sewers, sanitary sewers, water mains, retention basins
and other utilities to be dedicated to the City. Charges are based
upon hourly rate of the Standard Rate Schedule as established by the
Engineer and the City. This amount to be deposited by the developer,
based upon Engineer's estimate shall be 6% of the first $100,000 of
construction cost, 4% of the next $100,000 of construction cost, and
3% of the remaining construction costs of the improvements.
B.
Zoning fees.
(1)
Rezoning fee: Each petitioner requesting or petitioning
for rezoning under or by amendment to the City of Rockwood Zoning
Ordinance shall at the time of filing such petition pay to the City
of Rockwood the following nonrefundable rezoning filing fee or charge
as a condition of and prior to the City's administrative processing
of such petitions for rezoning or amendment:
(a)
All districts, except as provided in 1(B): a
minimum charge of $500 which shall include the first five acres or
less petitioned to be rezoned plus a planning consultant fee of $450
and, thereafter, $10 per acre for each additional acre or portion
thereof included in such petition for rezoning.
(b)
Owner-occupied individual single-family or two-family
dwelling units: $100 for petitions to rezone single lots to residential
zones.
(2)
Zoning Board of Appeals fee. Each person filing an
appeal with the City of Rockwood Zoning Board of Appeals and Adjustments
shall at the time of filing its appeal pay to the Secretary of the
Board of Appeals the following nonrefundable fee or charge as a condition
of and prior to the City's administrative processing of such appeal
by the Zoning Board of Appeals and Adjustments:
(a)
For any appeal involving residentially zoned
property: $100.
(b)
For any appeal involving commercially zoned
property, except for individual single-family or two-family dwelling
units within a commercial zone, which shall be required to pay the
fee in Subsection B(1): $250.
(c)
For any appeal involving industrially zoned
property, except for individual single-family or two-family dwelling
units within an industrial zone, which shall be required to pay the
fee in Subsection B(1): $300.
(d)
For a petition for use variance review in any
zoning classification: $450
(3)
Lot splitting fee. Each person requesting or petitioning
the City of Rockwood for approval of a lot split shall, at the time
of filing its petition or request, pay to the City of Rockwood the
following nonrefundable lot split fee or charge as a condition of
and prior to the City's administrative processing of such petition
for lot splitting: $200 plus $20 per lot resulting.
(4)
Site plan review fees. Each person requesting a site
plan review as provided for and required under the zoning and other
ordinances of the City of Rockwood shall at the time that that such
site plan review is requested pay to the City of Rockwood the following
nonrefundable site plan review fees or charges as condition of and
prior to such site plan review procedures being instituted by the
City:
(a)
Multiple family (R-B and R-C Districts): $400
plus $6 per dwelling unit. For each submission of a revised site plan,
60% of the original fee shall be charged.
(b)
Commercial and industrial development (M-1,
M-2, PF-1, CM-1, B-1, B-2, B-3, O-1, O-R and F-S Districts): $475
plus $50 per acre or fraction thereof. For each submission of a revised
site plan, 60% of the original fee shall be charged.
(c)
Mobile home park: $600 plus $6 per site. For
each submission of a revised site plan, 60% of the original fee shall
be charged.
(d)
Planned unit development (PUD): $500 plus $50
per acre for any nonresidential area plus $6 per dwelling unit for
any residential component. For each submission of a revised site plan,
60% of the original fee shall be charged.
(e)
Other use (office/institutional): $425 plus
$50 per acre or fraction thereof. For each submission of a revised
site plan, 60% of the original fee shall be charged.
(g)
Subdivision site plans or site condominiums:
the same fee as D(6)(a) above. Each revision of plans shall be accompanied
by a fee equal to 60% of the original fee charged.
(5)
Special approval or conditional use (all districts):
$250 in addition to site plan review fee.
(6)
Application to schedule special meeting (A special
meeting is any meeting not held at a regularly scheduled date.):
(7)
Special City Planner, City Attorney and City Engineer
costs. Conferences, meetings or field inspections by City consultant(s)
(City Planner, City Attorney, or City Engineer) as requested by the
applicant or required by the City shall be the actual costs incurred
for consultants, planner or attorney. Such charges shall apply to
any special meeting, special review or special service requested by
the applicant or required by the City as part of the review process
for any of the applications covered by the above fee schedule.
(8)
Waiver provision. The fees established by this resolution
may be waived upon a determination by the City Council that a hardship
exists.
A.
Electrical permit fees:
(1)
New single-family residence: $125, includes the following:
(a)
Up to and including 200 amp service.
(b)
One furnace.
(c)
One humidifier.
(d)
One air cleaner.
(e)
One garbage disposal.
(f)
Up to and including 15 circuits.
(g)
One range hood.
(h)
One range plug (120 or 240 volts).
(i)
One utility circuit (120 volts).
(j)
Up to and including five smoke detectors ($5
each additional smoke detector).
(k)
One rough inspection.
(l)
One final inspection.
(2)
All permits, excluding new homes, base fee: $25.
Service
(amperes)
|
Fee
| |
---|---|---|
Through 200
|
$10
| |
Over 200 to 600
|
$15
| |
Over 600 to 800
|
$20
| |
Over 800
|
$25
|
(3)
Unit charges.
Miscellaneous:
| |||
---|---|---|---|
Circuits (each)
|
$3.00
| ||
Lamps/outlets/fixtures, each
|
$0.50
| ||
Dishwasher, garbage disposal and range hood
|
$4.00
| ||
Furnace or unit heater/water heater, each
|
$5.00
| ||
Electrical heating units (baseboards), each
|
$4.00
| ||
Power outlets including ranges, dryers, etc.,
each
|
$7.00
| ||
AC Units w/interruptible or uninterruptible
|
$10.00
| ||
Air cleaners (commercial), per
|
$5.00
| ||
Humidifiers
|
$5.00
| ||
HVAC
|
$7.00
| ||
Feeders, bus duct, per 50 feet and fraction
thereof
|
$6.00
| ||
Signs, per circuit
|
$5.00
| ||
Mobile home site, each
|
$6.00
| ||
Recreational vehicle site, each
|
$4.00
| ||
Transformers/industrial; ovens/machinery:
| |||
KVA and horsepower (each up to)
| |||
20 KVA or horsepower
|
$6.00
| ||
21 to 50 KVA or horsepower
|
$10.00
| ||
51 or over KVA or horsepower
|
$12.00
| ||
Fire alarm systems and smoke detectors:
| |||
Up to 10 stations and horns
|
$50.00
| ||
10 to 20 stations and horns
|
$100.00
| ||
Over 20 stations and horns, each
|
$5.00
| ||
Solar units:
| |||
Per hour
|
$25.00
|
(4)
Special inspections and miscellaneous fees:
Type
|
Fee
| |
---|---|---|
Inspections, hourly rate
|
$25
| |
Additional inspections
|
$20
| |
Final inspections
|
$20
| |
Reinspections
|
$20
| |
Reoccupancy of commercial/industrial building
|
$20
| |
No permit secured
|
$100
|
B.
Plumbing permit fees:
(1)
New single-family residence: $125.
(2)
Base fee, all permits, excluding new homes: $25.
(3)
Unit charges:
Fixtures: $5.00 each item
| ||
---|---|---|
Bathtub
|
Shower stall with valve and
| |
Bidet
|
trap
| |
Dental chair
|
Sink, any description
| |
Dishwasher
|
Soda fountain or bar, each
| |
Drain (acid, waste,
|
waste opening
| |
Condensate, etc.
|
Solar system
| |
Drinking fountain
|
Stack soil, revent, each
| |
Floor drain
|
waste inside conductor
| |
Grease trap
|
Sump pump and pit
| |
House bibb
|
Vacuum breaker
| |
Humidifier
|
Vent damper
| |
Laboratory (hospital/clinic),
|
Washing machine connection
| |
fixture, equipment, device
|
Water closet
| |
Laundry tray
|
Water-connected appliances
| |
Lavatory
|
(equipment)
| |
Reduced pressure and
|
Water disposal (garbage)
| |
backflow preventer
|
Water filter
| |
Sewage ejector with receptor
|
Water softener connection
|
Other fixtures not included in this section
@ $5.
| ||
Hot water tank:
| ||
Residential
|
$10
| |
Commercial
|
$30
|
Building drains:
|
Size of Line
(diameter in inches)
|
Fee
(each 100 linear feet or fraction thereof)
| |
---|---|---|
Not exceeding 6
|
$20
| |
Not exceeding 8
|
$30
| |
Not exceeding 10
|
$40
| |
12 and over
|
$50
|
Water distribution/water service:
|
Size at Meter
(inches)
|
Fee
| |
---|---|---|
3/4
|
$11
| |
1
|
$13
| |
2
|
$15
| |
3
|
$17
| |
4
|
$21
| |
Exceeding 4
|
$25
|
Storm or sanitary sewers:
|
Size of Line
(diameter inches)
|
Fee
(each 100 linear feet or fraction thereof)
| |
---|---|---|
6 to 12
|
$30
| |
Not exceeding 15
|
$40
| |
Not exceeding 18
|
$50
| |
Not exceeding 21 and over
|
$60
| |
24 and over
|
$70
| |
Manhole
|
$20
| |
Catch basins or inlet
|
$20
| |
Change crock to iron
|
$30
|
C.
Mechanical permit fees.
(1)
New single-family residence: $125.
(2)
Base fee: $25.
(3)
Unit charges. In addition to the base fee, there shall
be a per-unit charge as follows:
Air conditioning units:
| |||
Over 1 HP to HP
|
$20
| ||
Over 5 HP to 20 HP
|
$30
| ||
Over 20 HP to 50 HP
|
$50
| ||
Over 50 HP
|
$80
| ||
Air handlers, multizone, self-contained units,
ventilation and exhaust fans:
| |||
Residential
|
$10
| ||
Under 1,500 CFM
|
$20
| ||
1,500 to 10,000 CFM
|
$40
| ||
Over 10,000 CFM
|
$50
| ||
Chimneys and vents, all types
|
$25
| ||
Cooling towers with reservoir capacity:
| |||
Under 500 gallons
|
$35
| ||
Over 500 gallons
|
$65
| ||
Dampers
| |||
Distribution systems
|
$15
| ||
Residential (duct work)
|
$20
| ||
Under $3,000
|
$20
| ||
$3,000 to $6,999
|
$40
| ||
Over $7,000
|
$50
| ||
Electronic air cleaner:
| |||
Residential
|
$10
| ||
Commercial
|
$30
| ||
Heating equipment:
| |||
Under 500,000 BTU input
|
$30
| ||
Over 500,000 BTU input
|
$60
| ||
Gas piping or repiping
|
$25
| ||
Hot water tanks:
| |||
Residential
|
$10
| ||
Commercial
|
$30
| ||
Humidifiers:
| |||
Residential
|
$10
| ||
Commercial
|
$20
| ||
LPG and fuel oil tanks:
| |||
Under 500 gallons
|
$30
| ||
Over 500 gallons
|
$60
| ||
Oil burners:
| |||
Under 5 gallons (1 hour)
|
$30
| ||
Over 5 gallons (1 hour)
|
$40
| ||
Refrigeration, commercial
| |||
Under 5 HP (split system)
|
$25
| ||
5 HP to 50 HP (split system)
|
$50
| ||
Over 50 HP (split system)
|
$75
| ||
Solar equipment, each panel:
| |||
Residential
|
$15
| ||
Commercial
|
$20
| ||
Wood-burning equipment:
| |||
Vent connectors under 10 inches
|
$40
| ||
Vent connectors over 10 inches
|
$50
| ||
Unified pressure vessels (air tanks, steam,
etc.):
| |||
16 inches in diameter or less
|
$20
| ||
16 inches to 36 inches
|
$25
| ||
Over 36 inches
|
$30
|
(4)
Unit charges.
Miscellaneous:
| |||
Circuits, each
|
$3.00
| ||
Lamps, each
|
$0.50
| ||
Dishwasher, garbage disposal and range hood
|
$4.00
| ||
Furnace or unit heater, each
|
$5.00
| ||
Electrical heating units (baseboards), each
|
$4.00
| ||
Power outlets (including ranges, dryers, etc.),
each
|
$7.00
| ||
AC units w/interruptible or uninterruptible
|
$10.00
| ||
Air cleaners (commercial), per
|
$5.00
| ||
Humidifiers
|
$5.00
| ||
HVAC
|
$7.00
| ||
Feeders, bus duct, per 50 feet and fraction
thereof
|
$6.00
| ||
Signs, per circuit
|
$5.00
| ||
Mobile home site, each
|
$6.00
| ||
Recreational vehicle site, each
|
$4.00
| ||
Transformers, machinery, etc:
| |||
KVA and horsepower (each up to):
| |||
20 KVA or horsepower
|
$6.00
| ||
21 to 50 KVA or horsepower
|
$410.00
| ||
51 or over KVA or horsepower
|
$12.00
| ||
Fire alarm systems:
| |||
Fire alarm, up to 10 stations and horns
|
$50.00
| ||
10 to 20 stations and horns
|
$100.00
| ||
Over 20 stations and horns, each
|
$5.00
| ||
Solar units:
| |||
Per hour
|
$25.00
| ||
Special inspections and miscellaneous
fees:
| |||
Inspections, hourly rate:
|
$25.00
| ||
Additional inspections
|
$20.00
| ||
Final inspections
|
$20.00
| ||
Reinspections
|
$20.00
| ||
Reoccupancy of commercial/industrial building
|
$20.00
| ||
No permit secured
|
$100.00
|
D.
Building Department fee schedule:
(1)
Building permit fees: based on the BOCA Methodology
and the BOCA construction cost tables.
(2)
Plan review fee:
(a)
For all new structures, including residential,
commercial and industrial buildings; additions; alterations; and accessory
structures, the plan review fee shall be paid at the time of submission
of the plans for review and be paid in addition to any permit fees.
(b)
Single-family residential:
(c)
Outside review service may be used at the option
of the City. Fee for services will be the actual charge to the City.
(3)
Floodplain evaluation fee: $20.
(4)
Construction permit fee. Any work commencing prior
to issuance of a permit shall be charged a double permit fee.
Cost
|
Fee
| |
---|---|---|
Minimum for first $1,000 or fraction thereof
|
$30
| |
$1,001 to $50,000
|
$30 plus $5 for each $1,000 or fraction thereof
| |
$50,001 to $500,000
|
$275 plus $4 for each $1,000 or fraction thereof
over $50,000
| |
Over $500,000
|
$2,275 plus $3 per $1,000 or fraction thereof
over $500,000
|
(7)
Builders performance bonds: The City of Rockwood shall
require a cash bond or surety bond for each building permit for performance
of cleaning up after a job has been completed. Said bond shall be
returned to the builder at the time a final certificate of occupancy
is issued. Said cash bond or surety bond is not returnable if the
City must clean up in the event the builder fails to so perform.
Type of Job
|
Bond
| |
---|---|---|
Job up to $5,000
|
$50
| |
$5,000 to $10,000
|
$150
| |
$10,001 to $100,000
|
$500
| |
Multiple housing
|
2% estimated cost
| |
Commercial
|
2% estimated cost
| |
Industrial
|
2% estimated cost
|
(8)
Demolition permits:
Building or Structure
|
Fee
| |
---|---|---|
Accessory buildings
|
$15
| |
Residential buildings (1 or 2 stories)
|
$30
| |
Residential buildings (3 or more stories)
|
$50
| |
Commercial buildings
|
$50
| |
Industrial buildings
|
$100
| |
Pools (in-ground)
|
$30
|
(9)
Permit for moving a building:
(a)
The permit fee for moving a building or structure
from its locations on a parcel of land to some other location with
or without passing over or going upon a public street or way shall
be as follows:
(b)
Prior to issuance of a moving-of-a-building
permit by the Building Department, approval of the date, time schedule,
route and destination must be obtained from the Department of Public
Services, Traffic Safety Division, the City Engineer and the Fire
Marshal.
(10)
Sign permit fee:
Type of Sign
|
Fee
| ||
---|---|---|---|
Permanent signs
| |||
Wall-mounted or painted
|
$30
| ||
Freestanding ($1/sq. ft.), minimum
|
$30
| ||
Face change only
|
$25
| ||
Awning signs
|
$30
| ||
Temporary signs (30 days maximum)
|
$20
|
(13)
Swimming pool permit fee:
Type of Pool
|
Fee
| |
---|---|---|
Above-ground
|
$30
| |
Below-ground
|
$50
| |
Annual inspection
|
$25
|
(15)
Temporary structures/trailers permit fee: $30.
(16)
Inspection fees:
Type
|
Fee
| ||
---|---|---|---|
Hourly rate
|
$30
| ||
Reinspection (work not ready for inspection):
|
$30
| ||
First reinspection for original violations
|
N/C
| ||
Subsequent reinspections
|
$30
| ||
Zoning inspection
|
$30
| ||
Change of occupancy/continuation of use inspection
|
$30
| ||
Certificate of occupancy inspection
|
$20
| ||
Temporary certificate of occupancy inspection
|
$20
| ||
Stop-work order, each site
|
$20
| ||
Sprinkler system
|
$50
| ||
Building grade:
| |||
Residential
|
$30
| ||
Commercial
|
$40
| ||
Special inspection
|
Actual charge to the City
|
(17)
Cancellation and refund: Upon written request
by the permit holder, prior to commencement of any work, a permit
may be canceled and the permit fee refunded. A fee of $15 will be
retained by the City to defer administrative expenses. Review fees
are nonrefundable.
(18)
Renewal: The fee for renewing expired permits
shall be 25% of the original permit fee.
(19)
Transfer of a building permit (written authorization
by original permit holder required): $20.
(20)
Contractor's registration fees:
Type of Contractor
|
Fee
| |
---|---|---|
Residential builder
|
$25
| |
Maintenance and alterations contractor
|
$20
| |
Sign erector
|
$20
| |
Asphalt paving contractor
|
$20
| |
Fence erector
|
$20
| |
Wrecking contractor
|
$20
| |
Excavating contractor
|
$15
| |
Commercial building contractor
|
$25
| |
Reception antennas installer
|
$20
| |
Certificate of insurance
|
$15
|
See Chapter 45, Building Construction.
See Chapter 45, Building Construction.
A.
Article I, Cable Television Communications Franchise:
(1)
For a new or initial franchise: $3,000.
(2)
For renewal of a franchise: $1,500.
(3)
For a transfer of a franchise (other than a pro forma
transfer): $1,000.
(4)
For a pro forma transfer of a franchise: $500.
(5)
For modification of a franchise agreement pursuant
to 47 U.S.C. § 545: $1,000.
(6)
For any other relief: $500.
A.
Wastewater discharge permit: $25
[Amended 5-21-2014]
Schedule of Parking Fines
| ||
---|---|---|
(IF YOU PAY)
| ||
Offense
|
Within 72 Hours
|
After 72 Hours
|
Snow emergency
|
$100
|
$125
|
Parking in a handicapped area
|
$75
|
$100
|
Parking between sidewalk and curb
|
$25
|
$50
|
Parking in fire lane
|
$75
|
$100
|
Parking on private property
|
$50
|
$75
|
Traffic hazard
|
$25
|
$50
|
Blocking traffic
|
$75
|
$100
|
Blocking a driveway
|
$25
|
$50
|
Parking facing wrong way
|
$25
|
$50
|
Parking in a no stopping/standing or parking
zone
|
$50
|
$75
|
All other parking violations
|
$10
|
$20
|
A.
Water rates.
(1)
Meter charges. A meter charge shall be paid
each quarter by each user of water from the City water system, according
to the following schedule:
Meter Size
(inches)
|
Charge
| |
---|---|---|
3/4 or less
|
$2.00
| |
1
|
$2.50
| |
1 1/2
|
$2.75
|
(2)
Rates inside City. The following rates shall
apply in the City to all users of water from the City's water system.
(a)
Wholesale users. Wholesale users shall pay a
charge determined in each case by Council.
(b)
Other than wholesale users. Users other than
wholesale users shall pay a rate or charge of $1.46 per 1,000 gallons
or fraction thereof of water used in each quarter. Users of over 750,000
gallons in a quarter shall pay a charge or rate of $0.97 per 1,000
gallons or fraction thereof of water used in the quarter, or shall
pay for such quarterly water usage at the prevailing wholesale rate.
(c)
Minimum rate. All bills shall be subject to
a minimum rate of $5.35 per quarter for water used in the quarter,
except that the minimum charge shall not apply to users who:
[1]
Are citizens of the City and reside within the
City limits;
[2]
Are 65 years of age or older;
[3]
Quality for a senior citizens real property
tax exemption under the laws of the state;
[4]
Use water supplied to them by the City for their
own personal residential use and consumption, and for the personal
residential use and consumption of their spouse, children and others
residing with them, to such an extent that they qualify as dependents
under federal income tax laws; and
[5]
Are liable for payment of water service supplied
to their place of residence.
Such five qualifications must coexist in time
with respect to a user in order to qualify the user for a minimum
charge exemption.
|
(3)
Rates outside City. Users of water from the
City water system who are outside the City shall pay a rate of $2.50
per 1,000 gallons or fraction thereof of water used in each quarter.
B.
Sewer rates. The following charges for sewage disposal
service shall be levied upon all premises having any sewer connection
with the public sewers:
(1)
Rates inside City. The following rates shall
apply within the City to all users of the City's public sanitary sewers
for the discharge by such users of sewage into the City's sanitary
sewers:
(a)
Wholesale users. Wholesale users shall pay a
charge determined in each case by Council.
(b)
Other than wholesale users. Users other than
wholesale users shall pay for the treatment of sewage discharged by
such users into the City's sanitary sewer a rate or charge of $2.55
per quarter per 1,000 gallons or fraction thereof of water used by
such user in each quarter.
(2)
Industrial surcharge rate. Where it is determined
that the character of sewage from any manufacturing or industrial
plant, building or premises in the City is such that it imposes an
unreasonable additional burden upon the City's sewerage system, and
that the services necessary to treat such sewage are above that imposed
by the average sewage being treated, such manufacturing or industrial
plant, building or premises shall, in addition to the rates established
for sewage treatment as provided for in this chapter, pay an additional
quarterly sewage treatment surcharge, as established by Council in
each case, for such additional services necessary to treat such sewage
discharge.
C.
Replacement charge. In addition the rates set forth
in Subsection B(1) and (2), a replacement charge of $8.35 per unit
basis (see § 254-7 of Chapter 254 of the Code of the City
of Rockwood) per month shall be charged to all users of the City's
public sanitary sewer to fund the capital costs of upgrading and maintaining
the wastewater treatment plant.
D.
Debt charge. A debt charge of $9.10 per unit basis
(see § 254-7 of Chapter 254 of the Code of the City of Rockwood)
per month shall be charged to all users of the City's public sanitary
sewer to fund the debt service for bonds issued to pay for the upgrade
of the wastewater treatment plant.
[1-21-1998]
E.
Other charges.
(1)
Sanitary sewer tap-in charge: $1,500.
(2)
Storm sewer tap-in fee: $225
(3)
Water tap-in fee charge (one-inch line): $1,250.
(4)
Water privilege charge (per unit): $150.
(6)
Plumber's bond: $100
(7)
More than one trip to make an inspection or
to set a meter: $1 for each additional trip.
(8)
Water meter reader: $20
(9)
Deposit: not less than $25
(10)
Water turn-on charge: $10
A.
Weed cutting fees: $200 per hour.
[Added 11-17-2010]
A.
Police Department.
(1)
Police officer, Full-time: $37.75 per hour.
(2)
Police officer, Part-time: $30 per hour.
(3)
Police Chief: $46.50 per hour.
(4)
Police Sergeant: $40.45 per hour.
(5)
Police Clerk Typist: $26.32 per hour.
(6)
Vehicle costs: $25 per hour.
(7)
Attorney's fees: $100 per hour.
(8)
Lodging (jail): $35 per day.
(10)
PBT (preliminary breath test): $5.
C.
Gun registration, notary: $10.
D.
Records check: $10.
E.
Bond posting: $10.
F.
Drunk driving base fee: $262.50 (officer, minimum of three hours;