All timber-harvesting operations carried out
pursuant to this chapter shall be subject to inspections by the Town
Engineer, Code Enforcement Officer or other person designated by the
Town. If the Town finds that the work is not being performed in conformance
with applicable requirements or the approved plans or in accordance
with accepted practices, the Town shall immediately notify the person
in charge of the nonconformity and of the corrective measures to be
taken. The Town may designate or retain such expert personnel as may
be required for inspection and remedial services, with the costs to
be borne by the permittee.
Upon completion of the timber harvesting and
prior to the release of any surety, the Code Enforcement Office may
require the preparation of a final report certifying that the operation
was conducted in conformity with applicable requirements of the Town
and other agencies, that required remedial, restorative or replanting
measures have been satisfactorily completed and that any off-site
damage has been repaired.