An application shall be submitted to the administrative
officer, in writing and in duplicate, on forms supplied by the approving
authority. Applications shall be filed with the approving authority
no less than 21 days prior to the meeting date at which consideration
is requested. Required fees shall be submitted with the application.
The applicant shall furnish evidence:
A. That sewage facilities can be constructed in conformance
with state and Township regulations to service all lots in the subdivision
not having an individual disposal system, and
B. That an individual disposal system can be constructed
in conformance with state and Township regulations on each lot for
which such a system is proposed. For each individual disposal system,
the following information shall be submitted:
(1)
Soil logs and percolation or permeability test
results.
(2)
The high seasonal water table.
The approving authority may require an applicant
to submit evidence that there will be an adequate supply of potable
water conforming with quality standards of the New Jersey Department
of Environmental Protection.
[Amended 6-2-1997]
The approving authority may require the installation
and maintenance of on- and off-tract improvements. Such improvements
may require the furnishing of performance and maintenance guaranties
in accordance with Part 2, Site Plan Review.
The zoning requirements and general terms and conditions upon which approval is
based, whether conditional or otherwise, shall not be changed or abridged
for a period of two years after the date of minor subdivision approval,
provided that the approved minor subdivision shall have been duly
recorded as provided herein.