If any guaranties on deposit are insufficient
to pay for the costs of proper backfilling and resurfacing of the
street, the property owner and/or contractor shall be liable for and
shall make additional payments to the borough as determined to be
necessary by the Borough Clerk on the recommendation of the Borough
Engineer or designate.
In the event of an emergency where circumstances
will not warrant delay to first secure a street opening permit, a
street may be opened without a permit; provided, however, that such
opening shall be confined in size to the area necessary to take care
of the emergency. A street opening permit for said emergency opening,
plus any additional area that it may be necessary to open, shall be
secured before the close of business on the next business day of the
borough following the opening. Each day's delay in securing the street
opening permit following an emergency street opening shall be deemed
a distinct and separate violation of this article.