A.
The work connected with the items required in Article V shall be accomplished so as not to interfere with previous work.
B.
The work required by Article V shall proceed with exceptions only by order of the Planning Board.
C.
The Planning Board shall have inspected all work done on the subgrade, surfacing and drainage, including trench, before placing drains and all work on water piping and related equipment. Trenches shall not be backfilled before inspection by the Planning Board.