A.
The Township Engineer or the Township designee shall inspect all
phases of the installation of the permanent BMPs and/or stormwater
management facilities as deemed appropriate by the Township Engineer.
B.
During any stage of the work, if the Township Engineer or the Township
designee determines that the permanent BMPs and/or stormwater management
facilities are not being installed in accordance with the approved
stormwater management plan, the Township shall revoke any existing
permits or other approvals and issue a cease-and-desist order until
a revised drainage plan is submitted and approved, as specified in
this chapter and until the deficiencies are corrected. In the event
a cease-and-desist order is issued as provided for in this section,
the applicant shall abide by, and ensure that all contractors, employees
or workmen at the site abide by, the cease-and-desist order.
C.
A final inspection of all BMPs and/or stormwater management facilities
shall be conducted by the Township Engineer or his designee and to
confirm compliance with the approved drainage plan prior to the issuance
of any occupancy permit.