Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Lehigh, PA
Northampton County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
A fee shall be established by resolution of the Township to defer Township costs for drainage plan review and processing.
The fees required by this chapter shall at a minimum cover:
A. 
The review of the drainage plan by the Township Engineer.
B. 
The site inspection.
C. 
The inspection of required controls and improvements during construction.
D. 
The final inspection upon completion of the controls and improvements required in the plan.
E. 
Any additional work required to enforce any permit provisions, regulated by this chapter, correct violations, and assure the completion of stipulated remedial actions.
F. 
Administrative and clerical costs.
Fees required under this chapter shall not be in excess of costs incurred by the Township and shall not duplicate fees already required by Chapter 180, Zoning, and/or Chapter 147, Subdivision and Land Development.