[HISTORY: Adopted by the Town of Amesbury as Art. 40 of the 1990 Bylaws; amended in its entirety 10-30-2006 by Bill No. 2006-076. Subsequent amendments noted where applicable.]
This chapter is adopted for the purpose of preserving and protecting significant buildings or structures within the City which constitute or reflect distinctive features of the architectural, cultural, political, economic or social history of the City; to resist and restrain environmental influences adverse to this purpose; to encourage owners of preferably preserved significant buildings or structures to seek out persons who might be willing to purchase and to preserve, rehabilitate, or restore such buildings or structures rather than demolish them; and by furthering these purposes to promote the public welfare, to preserve the resources of the City, and to make the City a more attractive and desirable place in which to live. To achieve these purposes, the Amesbury Historical Commission is empowered to advise the Amesbury Building Commissioner with respect to the issuance of permits for demolition, and the issuance of demolition permits for significant buildings and structures is regulated as provided in this chapter.
The following terms, when used, whether or not capitalized, in this chapter, shall have the meanings set forth below, unless the context otherwise requires:
APPLICATION
An application for a permit for the demolition of a building or structure.
BUILDING
A combination of any materials having a roof and enclosed within exterior walls or fire walls built to form a structure for the shelter of persons, animals or property.
BUILDING COMMISSIONER
The person occupying the office of Building Commissioner or otherwise authorized to issue demolition permits.[1]
COMMISSION
The Amesbury Historical Commission.
COMMISSION STAFF
The Chairman of the Commission, the person performing the functions of the Chairman in the event that there is no person with the title of Chairman as such, or any other person regularly providing staff services for the Commission to whom the Commission has delegated authority to act as Commission staff under this chapter.
DEMOLITION
The act of pulling down, destroying, removing, or razing a building or structure or commencing the work of total or substantial destruction with the intent of completing the same. "Demolition" also includes any of the following actions when visible from a public way: removal of a roof or removal of one or more sides of a building or structure. "Demolition" does not include the removal of a roof or one or more sides of a building or structure if it is to be replaced in kind, subject to all other applicable codes and regulations.
DETERMINATION
Any determination contemplated in § 225-3 of this chapter made by the Commission or the Commission staff.
ESSENTIAL SERVICES
Those services/utilities which have been in place in a building, including but not limited to electric, gas, water, sprinkler systems, fire alarm, smoke alarm, and fire panel.
HISTORICALLY SIGNIFICANT BUILDING OR STRUCTURE
Any building or structure within the City which is in whole or in part 75 or more years old and one or more of the following:
A. 
Which is within any historic district;
B. 
Which is listed on or is within an area listed on the National Register of Historic Places or which is the subject of a pending application for listing on said National Register;
C. 
Which is or has been designated by the Commission to be a significant building or structure which either is:
(1) 
Importantly associated with one or more historic persons or events or with the broad architectural, cultural, political, economic, or social history of the City or the commonwealth; or
(2) 
Historically or architecturally significant (in terms of period, style, method of building construction, or association with a famous architect or builder) either by itself or in the context of a group of buildings; or
D. 
Which is included in Amesbury's Comprehensive Historic Resource Inventory.
HISTORIC DISTRICT
Any existing or pending National Register district or local historic district that may from time to time have been established by ordinance.[2]
PERMIT
A permit issued by the Building Commissioner for demolition of a building or structure pursuant to an application therefor.
PREFERABLY PRESERVED
Any significant building or structure which the Commission determines, as provided in § 225-3 of this chapter, is in the public interest to be preserved or rehabilitated rather than to be demolished.
STRUCTURE
A combination of materials assembled at a fixed location to give support or shelter, such as a building, bridge, trestle, tower, framework, retaining wall, or the like.
[1]
Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II).
[2]
Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II).
A. 
Demolition permit application. The Building Commissioner shall forward a copy of each demolition permit application for a building or structure that is more than 75 years old to the Commission within five business days of the filing of such application. A request for demolition of a building must be submitted to, received and approved by the Commission before any essential services to said building may be discontinued and/or shut off.
B. 
Determination as to historical significance. Within 60 days from its receipt of a demolition permit application, the Commission shall determine whether the building or structure is historically significant. The applicant for the permit shall be entitled to make a presentation to the Commission if he or she so chooses. If the Commission determines that the building or structure is not historically significant, the Commission shall so notify the Building Commissioner in writing and the Building Commissioner may issue a demolition permit. If the Commission determines that the building or structure is historically significant, the Commission shall notify the Building Commissioner in writing that a demolition review must be made prior to the issuance of any demolition permit. If the Commission fails to notify the Building Commissioner of its determination within 60 days of its receipt of the application, then the building or structure shall be deemed not historically significant and the Building Commissioner may issue a demolition permit.
C. 
Demolition review package.
(1) 
Demolition review package requirements. Not more than 60 days after the Commission's determination that a building or structure is historically significant, the applicant for the permit shall submit to the Commission 10 copies of a demolition review package which shall include all the following information:
(a) 
A map to scale showing the location of the building or structure to be demolished on its property, including the footprint of that building or structure and property boundaries (e.g., Assessors' Map).
(b) 
Photographs, four inches by six inches or larger, of all sides of the exterior of the building or structure. Surrounding areas and any deterioration should also be documented via photographs.
(c) 
A description of the building or structure, or part thereof, to be demolished to the extent known by the applicant. This may include information on the period, architectural style, method of building construction, association with a reputed architect or builder, or important associations with one or more historic persons or events or with the broad architectural, cultural, political, economic or social history of the City or the Commonwealth of Massachusetts.
(d) 
The reason for the proposed demolition and data supporting said reason, including where applicable data sufficient to establish any economic justification for demolition.
(e) 
A brief description of the proposed reuse of the property on which the building or structure to be demolished is located.
(f) 
Plans for site improvements and, if a new structure is being planned, preliminary plans and elevations of the new structure.
(g) 
Depending on the scope of the project, additional materials may also be requested for the hearing as follows:
[1] 
Structural analysis report prepared by a Massachusetts licensed structural engineer.
[2] 
Other materials that may help the Commission evaluate whether the property is subject to delay.
(2) 
Public hearing and public notice. Upon receipt of the demolition review package referenced in Subsection C(1), the Commission shall fix a reasonable time for a public hearing on the application within 65 days from receipt of the demolition review package. At least 28 days before said hearing, the Commission shall give notice thereof to the applicant in writing, including the time, place and purpose of the hearing.
(a) 
Notification of abutters. Not less than 14 days prior to said hearing, the applicant shall send a copy of said notice by certified mail to the owners of all abutting property at their mailing addresses shown in the most recent applicable tax list of the Assessors, including owners of land directly opposite on any public or private street or way, and abutters to the abutters within 300 feet of the property line of the applicant, including any in another municipality or across a body of water, and to such other persons as the Commission shall deem entitled to notice.
(b) 
Publication of notice.
[1] 
The applicant shall provide said notice to a newspaper of general circulation in the municipality, to be published as a legal notice at least 14 days and again seven days prior to public hearing.
[2] 
Certified mail receipts and newspaper tear sheet including date of publication shall be turned in to the Commission by the applicant prior to the opening of the public hearing.
[3] 
All costs associated with publication of legal notice and required mailings shall be the responsibility of the applicant. Failure to comply with any of the above will result in a delay of the public hearing.
(3) 
Time line for determination. The Commission shall have 90 days from the opening of public hearing to make its decision. During this period, the Commission may request comment from other City boards, committees, or individuals as appropriate. The Commission shall file, within 15 days from the close of said public hearing, a written report with the Building Commissioner which shall include the following:
(a) 
A description of the age, architectural style, historical associations and importance of the building or structure to be demolished.
(b) 
A determination as to whether or not the building or structure should be preferably preserved.
(4) 
Finding of building or structure to be preferably preserved. If the building or structure is determined to be preferably preserved following the demolition plan review, then the Building Commissioner shall not issue a demolition plan permit for a period of 18 months from the date the Commission's report is filed with the Building Commissioner unless the Commission informs the Building Commissioner prior to the expiration of such eighteen-month period that the Commission is satisfied that the applicant for the demolition permit has made a bona fide, reasonable and unsuccessful effort to locate a purchaser for the building or structure who is willing to preserve, rehabilitate or restore the building or structure or has agreed to accept a demolition permit on specified conditions approved by the Commission. If no such agreement has been made, after the eighteen-month period has passed the demolition permit shall be issued, provided that all plans for proposed use of the site after demolition have been found to comply with applicable laws and all permits and approvals for the development have been obtained. Notwithstanding the foregoing language contained in this Subsection C(4), if the demolition involves the removal of a roof or one or more sides of a building or structure, not to be replaced in kind, the maximum length of the demolition delay shall not exceed a period of 12 months from the date that the applicant has submitted an application for a permit for such demolition.
The demolition permit shall expire after 24 months of being issued. This means that once the above conditions have been satisfied, the owner of the property has 24 months to demolish the building or structure. If the building or structure is not taken down in that period, the owner shall submit a new demolition permit application for Commission review.
If a building or structure poses an immediate threat to public health or safety due to its deteriorated condition, the owner of such building or structure may request issuance of an emergency demolition permit from the Building Commissioner. As soon as practicable after receipt of such request, the Building Commissioner shall arrange to have the property inspected by a board consisting of himself or his designee, the City Engineer or his designee, the Chairman of the Commission or his designee, and one disinterested person chosen by the Building Commissioner. After inspection of the building or structure and consultation with the other members of the board, the Building Commissioner shall determine whether the condition of the building or structure represents a serious and imminent threat to public health and safety and whether there is any reasonable alternative to the immediate demolition of the building or structure which would protect public health and safety. If the Building Commissioner finds that the condition of the building or structure poses a serious and imminent threat to public health and safety and that there is no reasonable alternative to the immediate demolition of the building or structure, then the Building Commissioner may issue an emergency demolition permit to the owner of the building or structure. Whenever the Building Commissioner issues an emergency demolition permit, he shall prepare a written report describing the condition of the building or structure and the basis of his decision to issue an emergency demolition permit. A copy of this written report shall be filed with the Commission.
A. 
Enforcement. The Commission and Building Commissioner are each specifically authorized to institute all actions and proceedings, in law or in equity, as they may deem necessary and appropriate to obtain compliance with the requirements of this chapter or to prevent a threatened violation thereof.
B. 
Building permit to be withheld. No building permit shall be issued with respect to any premises upon which a building or structure that is included in Amesbury's Comprehensive Historic Resource Inventory or is 75 years or more old has been voluntarily demolished otherwise than pursuant to a demolition permit granted after compliance with the provisions of this chapter for a period of two years after the date of the completion of such demolition. As used herein "premises" refers to the parcel of land upon which the demolished building or structure was located and all adjoining parcels of land under common ownership or control.