Table of Contents
[HISTORY: Adopted by the Town Board of the Town of Cedarburg 10-1-2008 by Ord. No. 2008-16. Amendments noted where applicable.]
A. 
This chapter is adopted by the Town Board under the authority granted by § 60.627, Wis. Stats. This chapter supersedes all provisions of a chapter previously enacted under § 60.62, Wis. Stats., that relate to stormwater management regulations. Except as otherwise specified in § 60.627, Wis. Stats., § 60.62, Wis. Stats., applies to this chapter and to any amendments to this chapter.
B. 
The provisions of this chapter are deemed not to limit any other lawful regulatory powers of the same governing body.
C. 
The Town Board hereby designates the Director of Public Works and/or an authorized designee designated by the Director of Public Works (hereinafter in this chapter referred to as "designee") to administer and enforce the provisions of this chapter.
[Amended 5-5-2021 by Ord. No. 2021-5]
D. 
The requirements of this chapter do not preempt more stringent stormwater management requirements that may be imposed by any of the following:
(1) 
Wisconsin Department of Natural Resources administrative rules, permits or approvals, including those authorized under §§ 281.16 and 283.33, Wis. Stats.
(2) 
Targeted nonagricultural performance standards promulgated in rules by the Wisconsin Department of Natural Resources under § NR 151.004, Wis. Adm. Code.
The Town Board finds that uncontrolled, post-construction runoff has a significant impact upon water resources and the health, safety and general welfare of the community and diminishes the public enjoyment and use of natural resources. Specifically, uncontrolled post-construction runoff can:
A. 
Degrade physical stream habitat by increasing stream bank erosion, increasing streambed scour, diminishing groundwater recharge, diminishing stream base flows and increasing stream temperature.
B. 
Diminish the capacity of lakes and streams to support fish, aquatic life, recreational and water supply uses by increasing pollutant loading of sediment, suspended solids, nutrients, heavy metals, bacteria, pathogens and other urban pollutants.
C. 
Alter wetland communities by changing wetland hydrology and by increasing pollutant loads.
D. 
Reduce the quality of groundwater by increasing pollutant loading.
E. 
Threaten public health, safety, property and general welfare by overtaxing storm sewers, drainageways, and other minor drainage facilities.
F. 
Threaten public health, safety, property and general welfare by increasing major flood peaks and volumes.
G. 
Undermine floodplain management efforts by increasing the incidence and levels of flooding.
A. 
Purpose. The general purpose of this chapter is to establish long-term post-construction runoff management requirements that will diminish the threats to public health, safety, welfare and the aquatic environment. Specific purposes are to:
(1) 
Further the maintenance of safe and healthful conditions.
(2) 
Prevent and control the adverse effects of stormwater; prevent and control soil erosion; prevent and control water pollution; protect spawning grounds, fish and aquatic life; control building sites, placement of structures and land uses; preserve ground cover and scenic beauty; and promote sound economic growth.
(3) 
Control exceeding of the safe capacity of existing drainage facilities and receiving water bodies; prevent undue channel erosion; control increases in the scouring and transportation of particulate matter; and prevent conditions that endanger downstream property.
B. 
Intent. It is the intent of the Town Board that this chapter regulates post-construction stormwater discharges to waters of the state. This chapter may be applied on a site-by-site basis. The Town Board recognizes, however, that the preferred method of achieving the stormwater performance standards set forth in this chapter is through the preparation and implementation of comprehensive, systems-level stormwater management plans that cover hydrologic units, such as watersheds, on a municipal and regional scale. Such plans may prescribe regional stormwater devices, practices or systems, any of which may be designed to treat runoff from more than one site prior to discharge to waters of the state. Where such plans are in conformance with the performance standards developed under § 281.16, Wis. Stats., for regional stormwater management measures and have been approved by the Town Board, it is the intent of this chapter that the approved plan be used to identify post-construction management measures acceptable for the community.
A. 
Applicability.
(1) 
Where not otherwise limited by law, this chapter applies after final stabilization to a site of land-disturbing construction activity that results in one or more acres of land-disturbing construction activities.
(2) 
A site that meets any of the criteria in this subsection is exempt from the requirements of this chapter:
(a) 
A redevelopment post-construction site with no increase in exposed parking lots or roads.
(b) 
A post-construction site with less than 10% connected imperviousness based on complete development of the post-construction site, provided the cumulative area of all parking lots and rooftops is less than one acre.
(c) 
Nonpoint discharges from agricultural facilities and practices.
(d) 
Nonpoint discharges from silviculture activities.
(e) 
Routine maintenance for project sites under five acres of land disturbance if performed to maintain the original line and grade, hydraulic capacity or original purpose of the facility.
(f) 
Underground utility construction such as water, sewer and fiber optic lines. This exemption does not apply to the construction of any aboveground structures associated with utility construction.
(3) 
Notwithstanding the applicability requirements in Subsection A(1), this chapter applies to post-construction sites of any size that, in the opinion of the Director of Public Works or designee, is likely to result in runoff that exceeds the safe capacity of the existing drainage facilities or receiving body of water, that causes undue channel erosion, that increases water pollution by scouring or the transportation of particulate matter or that endangers property or public safety.
[Amended 5-5-2021 by Ord. No. 2021-5]
B. 
Jurisdiction. This chapter applies to post-construction sites within the boundaries and jurisdiction of the Town of Cedarburg.
C. 
Exclusions. This chapter is not applicable to activities conducted by a state agency, as defined under § 27.01(1), Wis. Stats., but also including the office of District Attorney, which is subject to the state plan promulgated or a memorandum of understanding entered into under § 281.33(2), Wis. Stats.
A. 
Design criteria, standards and specifications. All drainage facilities and practices required to comply with this chapter shall incorporate technical standards and design methods specified in the document "Town of Cedarburg Erosion Control and Stormwater Management Requirements," maintained and periodically updated by the Director of Public Works or designee.
[Amended 5-5-2021 by Ord. No. 2021-5]
B. 
Where not superseded by stricter requirements in the Town of Cedarburg Erosion Control and Stormwater Management Requirements, the following standards are also incorporated for reference:
(1) 
Applicable design criteria, standards and specifications identified in the Wisconsin Construction Site Best Management Practice Handbook, WDNR Pub. WR-222, November 1993 Revision.
(2) 
Other design guidance and technical standards identified or developed by the Wisconsin Department of Natural Resources under Subchapter V of Chapter NR 151, Wis. Adm. Code.
(3) 
Other standards. Other technical standards not identified or developed in Subsection B(1) may be used, provided that the methods have been approved by the Director of Public Works or designee.
[Amended 5-5-2021 by Ord. No. 2021-5]
A. 
Responsible party. The entity holding fee title to the property shall be responsible for either developing and implementing a stormwater management plan, or causing such plan to be developed and implemented through contract or other agreement. This plan shall be developed in accordance with § 185-8, which incorporates the requirements of this section.
B. 
Plan. A written stormwater management plan in accordance with § 185-8 shall be developed and implemented for each post-construction site.
C. 
Stormwater management performance standards. All drainage facilities and practices required to comply with this chapter shall meet performance standards specified in the document, "Town of Cedarburg Erosion Control and Stormwater Management Requirements," maintained and periodically updated by the Director of Public Works or designee.
[Amended 5-5-2021 by Ord. No. 2021-5]
D. 
Location and regional treatment option.
(1) 
Stormwater management facilities required to meet this chapter may be located on-site or off-site as part of a regional stormwater device, practice or system.
(2) 
The Director of Public Works or designee may approve off-site management measures, provided that all of the following conditions are met:
[Amended 5-5-2021 by Ord. No. 2021-5]
(a) 
The Director of Public Works or designee determines that the post-construction runoff is covered by a stormwater management system plan that is approved by the Town of Cedarburg and that contains management requirements consistent with the purpose and intent of this chapter.
[Amended 5-5-2021 by Ord. No. 2021-5]
(b) 
The off-site facility meets all of the following conditions:
[1] 
The facility will be in place before the need for the facility arises as a result of on-site construction activities.
[2] 
The facility is designed and adequately sized to provide a level of stormwater control equal to or greater than that which would be afforded by on-site practices meeting the performance standards of this chapter.
[3] 
The facility has a legally obligated entity responsible for its long-term operation and maintenance.
[4] 
Where a regional treatment option exists such that the Director of Public Works or designee may exempt the applicant from all or part of the minimum on-site stormwater management requirements, the applicant shall be required to pay a fee in an amount determined in negotiation with the Director of Public Works or designee. In determining the fee for post-construction runoff, the Director of Public Works or designee shall consider an equitable distribution of the cost for land, engineering design, construction, and maintenance of the regional treatment option.
[Amended 5-5-2021 by Ord. No. 2021-5]
E. 
Alternate requirements. The Director of Public Works or designee may establish stormwater management requirements more stringent than those set forth in Town of Cedarburg Erosion Control and Stormwater Management Requirements, if the Director of Public Works or designee determines that an added level of protection is needed to address downstream stormwater management issues.
[Amended 5-5-2021 by Ord. No. 2021-5]
A. 
Permit required. No responsible party may undertake a land-disturbing construction activity without receiving a post-construction runoff permit from the Director of Public Works or designee prior to commencing the proposed activity.
[Amended 5-5-2021 by Ord. No. 2021-5]
B. 
Permit application and fees. Unless specifically excluded by this chapter, any responsible party desiring a permit shall submit to the Director of Public Works or designee a permit application made on a form provided by the Director of Public Works or designee for that purpose.
[Amended 5-5-2021 by Ord. No. 2021-5]
(1) 
Unless otherwise excepted by this chapter, a permit application must be accompanied by a stormwater management plan, a maintenance agreement (where required) and, where not otherwise covered by a developer’s agreement, a nonrefundable permit administration fee. The permit administration fee, where applicable, shall be consistent with a fee schedule maintained by the Town of Cedarburg and available at Town Hall.
(2) 
The stormwater management plan shall be prepared to meet the requirements of §§ 185-6 and 185-8, the maintenance agreement shall be prepared to meet the requirements of § 185-9, the financial guarantee shall meet the requirements of § 185-10, and fees shall be those established by the Town Board as set forth in § 185-11.
C. 
Review and approval of permit application. The Director of Public Works or designee shall review any permit application that is submitted with a stormwater management plan, maintenance agreement, and the required fee. The following approval procedure shall be used:
[Amended 5-5-2021 by Ord. No. 2021-5]
(1) 
The Director of Public Works or designee may request additional information if required for a complete application within 15 business days of receipt of any permit application. Within 30 business days of the receipt of a complete permit application, including all items as required by Subsection B, the Director of Public Works or designee shall inform the applicant whether the application, plan and maintenance agreement are approved or disapproved based on the requirements of this chapter.
[Amended 5-5-2021 by Ord. No. 2021-5]
(2) 
If the stormwater permit application, plan and maintenance agreement are approved, or if an agreed-upon payment of fees in lieu of stormwater management practices is made, the Director of Public Works or designee shall issue the permit.
[Amended 5-5-2021 by Ord. No. 2021-5]
(3) 
If the stormwater permit application, plan or maintenance agreement is disapproved, the Director of Public Works or designee shall detail in writing the reasons for disapproval.
[Amended 5-5-2021 by Ord. No. 2021-5]
(4) 
The Director of Public Works or designee may request additional information from the applicant. If additional information is submitted, the Director of Public Works or designee shall have 30 business days from the date the additional information is received to inform the applicant that the plan and maintenance agreement are either approved or disapproved.
[Amended 5-5-2021 by Ord. No. 2021-5]
(5) 
Prior to commencing the land development activity, the project may be subject to additional approvals as required by the Town’s Municipal Code.
D. 
Permit requirements. All permits issued under this chapter shall be subject to the following conditions, and holders of permits issued under this chapter shall be deemed to have accepted these conditions. The Director of Public Works or designee may suspend or revoke a permit for violation of a permit condition, following written notification of the responsible party. An action by the Director of Public Works or designee to suspend or revoke this permit may be appealed in accordance with § 185-13.
[Amended 5-5-2021 by Ord. No. 2021-5]
(1) 
Compliance with this permit does not relieve the responsible party of the responsibility to comply with other applicable federal, state, and local laws and regulations.
(2) 
The responsible party shall design and install all structural and nonstructural stormwater management measures in accordance with the approved stormwater management plan and this permit.
(3) 
The responsible party shall notify the Director of Public Works or designee at least two business days before commencing any work in conjunction with the stormwater management plan, and within three business days upon completion of the stormwater management practices. If required as a special condition under Subsection E, the responsible party shall make additional notification according to a schedule set forth by the Director of Public Works or designee so that practice installations can be inspected during construction.
[Amended 5-5-2021 by Ord. No. 2021-5]
(4) 
Practice installations required as part of this chapter shall be certified "as built" by a licensed professional engineer. Completed stormwater management practices must pass a final inspection by the Director of Public Works or its designee to determine if they are in accordance with the approved stormwater management plan and chapter. The Director of Public Works or its designee shall notify the responsible party in writing of any changes required in such practices to bring them into compliance with the conditions of this permit.
(5) 
The responsible party shall notify the Director of Public Works or designee of any significant modifications it intends to make to an approved stormwater management plan. The Director of Public Works or designee may require that the proposed modifications be submitted to it for approval prior to incorporation into the stormwater management plan and execution by the responsible party.
[Amended 5-5-2021 by Ord. No. 2021-5]
(6) 
The responsible party shall maintain all stormwater management practices in accordance with the stormwater management plan until the practices either become the responsibility of the Town Board, or are transferred to subsequent private owners as specified in the approved maintenance agreement.
(7) 
The responsible party authorizes the Director of Public Works or designee to perform any work or operations necessary to bring stormwater management measures into conformance with the approved stormwater management plan, and consents to a special assessment or charge against the property as authorized under Subchapter VII of Chapter 66, Wis. Stats., or to charging such costs against the financial guarantee posted under § 185-10.
[Amended 5-5-2021 by Ord. No. 2021-5]
(8) 
If so directed by the Director of Public Works or designee, the responsible party shall repair at the responsible party's own expense all damage to adjoining municipal facilities and drainageways caused by runoff, where such damage is caused by activities that are not in compliance with the approved stormwater management plan.
[Amended 5-5-2021 by Ord. No. 2021-5]
(9) 
The responsible party shall permit property access to the Director of Public Works or its designee for the purpose of inspecting the property for compliance with the approved stormwater management plan and this permit.
(10) 
Where site development or redevelopment involves changes in direction, increases in peak rate and/or total volume of runoff from a site, the Director of Public Works or designee may require the responsible party to make appropriate legal arrangements with affected property owners concerning the prevention of endangerment to property or public safety.
[Amended 5-5-2021 by Ord. No. 2021-5]
(11) 
The responsible party is subject to the enforcement actions and penalties detailed in § 185-12, if the responsible party fails to comply with the terms of this permit.
E. 
Permit conditions. Permits issued under this subsection may include conditions established by Director of Public Works or designee in addition to the requirements needed to meet the performance standards in § 185-6 or a financial guarantee as provided for in § 185-10.
[Amended 5-5-2021 by Ord. No. 2021-5]
F. 
Permit duration. Permits issued under this section shall be valid from the date of issuance through the date the Director of Public Works or designee notifies the responsible party that all stormwater management practices have passed the final inspection required under Subsection D(4). The permit shall be invalid if work is not commenced within one year of permit issuance.
[Amended 5-5-2021 by Ord. No. 2021-5]
A. 
Plan requirements. A stormwater management plan shall be prepared and submitted to the Director of Public Works or designee. The stormwater management plan shall include, at a minimum, information required in the Town of Cedarburg Erosion Control and Stormwater Management Requirements, maintained and periodically updated by the Director of Public Works or designee. The Director of Public Works or designee may waive certain submittal requirements if determined by the Director of Public Works or designee to be unnecessary to demonstrate compliance with chapter standards.
[Amended 5-5-2021 by Ord. No. 2021-5]
B. 
Alternate requirements. The Director of Public Works or designee may prescribe alternative submittal requirements for applicants seeking an exemption to on-site stormwater management performance standards under § 185-6E.
[Amended 5-5-2021 by Ord. No. 2021-5]
A. 
Maintenance agreement required. The maintenance agreement required under § 185-7B for stormwater management practices shall be an agreement between the Director of Public Works or designee and the responsible party to provide for maintenance of stormwater practices beyond the duration period of this permit. The maintenance agreement shall be filed with the County Register of Deeds as a property deed restriction so that it is binding upon all subsequent owners of the land served by the stormwater management practices.
[Amended 5-5-2021 by Ord. No. 2021-5]
B. 
Agreement provisions. The maintenance agreement shall contain the following information and provisions and be consistent with the maintenance plan required by § 185-7B:
(1) 
Identification of the stormwater facilities and designation of the drainage area served by the facilities.
(2) 
A schedule for regular maintenance of each aspect of the stormwater management system consistent with the stormwater management plan required under § 185-6B.
(3) 
Identification of the responsible party(s), organization or city, county, town or village responsible for long-term maintenance of the stormwater management practices identified in the stormwater management plan required under § 185-6B.
(4) 
Requirement that the responsible party(s), organization, or city, county, town or village shall maintain stormwater management practices in accordance with the schedule included in Subsection B(2).
(5) 
Authorization for the Director of Public Works or designee, his agent or assignee, to access the property to conduct inspections of stormwater management practices as necessary to ascertain that the practices are being maintained and operated in accordance with the agreement.
[Amended 5-5-2021 by Ord. No. 2021-5]
(6) 
A requirement on the Director of Public Works or designee to maintain public records of the results of the site inspections, to inform the responsible party responsible for maintenance of the inspection results, and to specifically indicate any corrective actions required to bring the stormwater management practice into proper working condition.
[Amended 5-5-2021 by Ord. No. 2021-5]
(7) 
Agreement that the party designated under Subsection B(3), as responsible for long-term maintenance of the stormwater management practices, shall be notified by the Director of Public Works or designee of maintenance problems which require correction. The specified corrective actions shall be undertaken within a reasonable time frame as set by the Director of Public Works or designee.
[Amended 5-5-2021 by Ord. No. 2021-5]
(8) 
Authorization of the Director of Public Works or designee to perform the corrected actions identified in the inspection report if the responsible party designated under Subsection B(3) does not make the required corrections in the specified time period. The Director of Public Works or designee shall enter the amount due on the tax rolls and collect the money as a special charge against the property pursuant to Subchapter VII of Chapter 66, Wis. Stats.
[Amended 5-5-2021 by Ord. No. 2021-5]
A. 
Establishment of the guarantee. The Director of Public Works or designee may require the submittal of a financial guarantee, the form and type of which shall be acceptable to the Director of Public Works or designee. The financial guarantee shall be in an amount determined by the Director of Public Works or designee to be the estimated cost of construction and the estimated cost of maintenance of the stormwater management practices during the period which the designated party in the maintenance agreement has maintenance responsibility. The financial guarantee shall give the Director of Public Works or designee the authorization to use the funds to complete the stormwater management practices if the responsible party defaults or does not properly implement the approved stormwater management plan, upon written notice to the responsible party by the Director of Public Works or designee that the requirements of this chapter have not been met.
[Amended 5-5-2021 by Ord. No. 2021-5]
B. 
Conditions for release. Conditions for the release of the financial guarantee are as follows:
(1) 
The Director of Public Works or designee shall release the portion of the financial guarantee established under this section, less any costs incurred by the Director of Public Works or designee to complete installation of practices, upon submission of "as-built" plans by a licensed professional engineer. The Director of Public Works or designee may make provisions for a partial pro-rata release of the financial guarantee based on the completion of various development stages.
[Amended 5-5-2021 by Ord. No. 2021-5]
(2) 
The Director of Public Works or designee shall release the portion of the financial guarantee established under this section to assure maintenance of stormwater practices, less any costs incurred by the Director of Public Works or designee, at such time that the responsibility for practice maintenance is passed on to another entity via an approved maintenance agreement.
[Amended 5-5-2021 by Ord. No. 2021-5]
[Amended 5-5-2021 by Ord. No. 2021-5]
The fees referred to in other sections of this chapter shall be established by the Town Board and listed in the Annual Fee Schedule which may from time to time be modified by resolution. A schedule of the fees shall be available for review in the Town Hall.
A. 
Any land-disturbing construction activity or post-construction runoff initiated after the effective date of this chapter by any person, firm, association, or corporation subject to the chapter provisions shall be deemed a violation unless conducted in accordance with the requirements of this chapter.
B. 
The Director of Public Works or designee shall notify the responsible party by certified mail of any noncomplying land-disturbing construction activity or post-construction runoff. The notice shall describe the nature of the violation, remedial actions needed, a schedule for remedial action, and additional enforcement action which may be taken.
[Amended 5-5-2021 by Ord. No. 2021-5]
C. 
Upon receipt of written notification from the Director of Public Works or designee under Subsection B, the responsible party shall correct work that does not comply with the stormwater management plan or other provisions of this permit. The responsible party shall make corrections as necessary to meet the specifications and schedule set forth by the Director of Public Works or designee in the notice.
[Amended 5-5-2021 by Ord. No. 2021-5]
D. 
If the violations of a permit issued pursuant to this chapter are likely to result in damage to properties, public facilities, or waters of the state, the Director of Public Works or designee may enter the land and take emergency actions necessary to prevent such damage. The costs incurred by the Director of Public Works or designee, plus interest and legal costs, shall be billed to the responsible party.
[Amended 5-5-2021 by Ord. No. 2021-5]
E. 
The Director of Public Works or designee is authorized to post a stop-work order on all land-disturbing construction activity that is in violation of this chapter, or to request the Town Attorney to obtain a cease-and-desist order in any court with jurisdiction.
[Amended 5-5-2021 by Ord. No. 2021-5]
F. 
The Director of Public Works or designee may revoke a permit issued under this chapter for noncompliance with chapter provisions.
[Amended 5-5-2021 by Ord. No. 2021-5]
G. 
Any permit revocation, stop-work order, or cease-and-desist order shall remain in effect unless retracted by the Director of Public Works or designee or by a court with jurisdiction.
[Amended 5-5-2021 by Ord. No. 2021-5]
H. 
The Director of Public Works or designee is authorized to refer any violation of this chapter, or of a stop-work order or cease-and-desist order issued pursuant to this chapter, to the Town Attorney for the commencement of further legal proceedings in any court with jurisdiction.
[Amended 5-5-2021 by Ord. No. 2021-5]
I. 
Any person, firm, association, or corporation who does not comply with the provisions of this chapter shall be subject to forfeiture per the Town Schedule of Deposits. Each day that the violation exists shall constitute a separate offense.
J. 
Compliance with the provisions of this chapter may also be enforced by injunction in any court with jurisdiction. It shall not be necessary to prosecute for forfeiture or a cease-and-desist order before resorting to injunction proceedings.
K. 
When the Director of Public Works or designee determines that the holder of a permit issued pursuant to this chapter has failed to follow practices set forth in the stormwater management plan, or has failed to comply with schedules set forth in said stormwater management plan, the Director of Public Works or designee or a party designated by the Director of Public Works or designee may enter upon the land and perform the work or other operations necessary to bring the condition of said lands into conformance with requirements of the approved plan. The Director of Public Works or designee shall keep a detailed accounting of the costs and expenses of performing this work. These costs and expenses shall be deducted from any financial security posted pursuant to § 185-10. Where such a security has not been established, or where such a security is insufficient to cover these costs, the costs and expenses shall be entered on the tax roll as a special charge against the property and collected with any other taxes levied thereon for the year in which the work is completed.
[Amended 5-5-2021 by Ord. No. 2021-5]
A. 
Board of Zoning Appeals. The Board of Zoning Appeals, created pursuant to § 16-2 of the Town of Cedarburg Code pursuant to § 60.65, Wis. Stats., shall hear and decide appeals where it is alleged that there is error in any order, decision or determination made by the Director of Public Works or designee in administering this chapter. The Board shall also use the rules, procedures, duties, and powers authorized by statute in hearing and deciding appeals. Upon appeal, the Board may authorize variances from the provisions of this chapter that are not contrary to the public interest, and where, owing to special conditions, a literal enforcement of the chapter will result in unnecessary hardship.
[Amended 5-5-2021 by Ord. No. 2021-5]
B. 
Who may appeal. Appeals to the Board of Zoning Appeals may be taken by any aggrieved person or by an officer, department, board, or bureau of the Town of Cedarburg affected by any decision of the Director of Public Works or designee.
[Amended 5-5-2021 by Ord. No. 2021-5]
If any section, clause, provision or portion of this chapter is judged unconstitutional or invalid by a court of competent jurisdiction, the remainder of the chapter shall remain in force and not be affected by such judgment.
As used in this chapter, the following terms shall have the meanings indicated:
ADMINISTERING AUTHORITY
A governmental employee, a designee designated by the Director of Public Works, or a regional planning commission empowered under § 60.627, Wis. Stats., that is designated by the Town Board to administer this chapter.
[Amended 5-5-2021 by Ord. No. 2021-5]
AGRICULTURAL FACILITIES AND PRACTICES
Has the meaning given in § 281.16, Wis. Stats.
AVERAGE ANNUAL RAINFALL
A calendar year of precipitation, excluding snow, which is considered typical.
BEST MANAGEMENT PRACTICE or BMP
Structural or nonstructural measures, practices, techniques or devices employed to avoid or minimize sediment or pollutants carried in runoff to waters of the state.
BUSINESS DAY
A day the office of the Director of Public Works or designee is routinely and customarily open for business.
[Amended 5-5-2021 by Ord. No. 2021-5]
CEASE-AND-DESIST ORDER
A court-issued order to halt land-disturbing construction activity that is being conducted without the required permit.
COMBINED SEWER SYSTEM
A system for conveying both sanitary sewage and stormwater runoff.
CONNECTED IMPERVIOUSNESS
An impervious surface that is directly connected to a separate storm sewer or water of the state via an impervious flow path.
DESIGN STORM
An hypothetical discrete rainstorm characterized by a specific duration, temporal distribution, rainfall intensity, return frequency, and total depth of rainfall.
DEVELOPMENT
Residential, commercial, industrial or institutional land uses and associated roads.
DIVISION OF LAND
The creation from one parcel of two or more parcels or building sites of five or fewer acres each in area where such creation occurs at one time or through the successive partition within a five-year period.
EFFECTIVE INFILTRATION AREA
The area of the infiltration system that is used to infiltrate runoff and does not include the area used for site access, berms or pretreatment.
EROSION
The process by which the land’s surface is worn away by the action of wind, water, ice or gravity.
EXCEPTIONAL RESOURCE WATERS
Waters listed in § NR 102.11, Wis. Adm. Code.
EXTRATERRITORIAL
The unincorporated area within three miles of the corporate limits of a first, second, or third class city, or within 1.5 miles of a fourth class city or village.
FINAL STABILIZATION
All land-disturbing construction activities at the construction site have been completed and a uniform, perennial, vegetative cover has been established, with a density of at least 70% of the cover, for the unpaved areas and areas not covered by permanent structures, or employment of equivalent permanent stabilization measures.
FINANCIAL GUARANTEE
A performance bond, maintenance bond, surety bond, irrevocable letter of credit, or similar guarantees submitted to the Director of Public Works or designee by the responsible party to assure that requirements of the chapter are carried out in compliance with the stormwater management plan.
[Amended 5-5-2021 by Ord. No. 2021-5]
GOVERNING BODY
The Town Board of Supervisors of the Town of Cedarburg.
[Amended 5-5-2021 by Ord. No. 2021-5]
IMPERVIOUS SURFACE
An area that releases as runoff all or a large portion of the precipitation that falls on it, except for frozen soil. Rooftops, sidewalks, driveways, parking lots and streets are examples of areas that typically are impervious.
IN-FILL AREA
An undeveloped area of land located within existing development.
INFILTRATION
The entry of precipitation or runoff into or through the soil.
INFILTRATION SYSTEM
A device or practice such as a basin, trench, rain garden or swale designed specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices such as swales or roadside channels designed for conveyance and pollutant removal only.
KARST FEATURE
An area or surficial geologic feature subject to bedrock dissolution so that it is likely to provide a conduit to groundwater, and may include caves, enlarged fractures, mine features, exposed bedrock surfaces, sinkholes, springs, seeps or swallets.
LAND DEVELOPMENT ACTIVITY
Any construction-related activity that results in the addition or replacement of impervious surfaces such as rooftops, roads, parking lots, and other structures. Measurement of areas impacted by land development activity includes areas that are part of a larger common plan of development or sale where multiple separate and distinct land-disturbing construction activities may be taking place at different times on different schedules but under one plan.
LAND-DISTURBING CONSTRUCTION ACTIVITY
Any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or nonvegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land-disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.
MAINTENANCE AGREEMENT
A legal document that provides for long-term maintenance of stormwater management practices.
MEP or MAXIMUM EXTENT PRACTICABLE
A level of implementing best management practices in order to achieve a performance standard specified in this chapter which takes into account the best available technology, cost effectiveness and other competing issues such as human safety and welfare, endangered and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to meet the performance standards and may vary based on the performance standard and site conditions.
NEW DEVELOPMENT
Development resulting from the conversion of previously undeveloped land or agricultural land uses.
OFF-SITE
Located outside the property boundary described in the permit application.
ON-SITE
Located within the property boundary described in the permit application.
ORDINARY HIGH-WATER MARK
Has the meaning given in § NR 115.03(6), Wis. Adm. Code.
OUTSTANDING RESOURCE WATERS
Waters listed in § NR 102.10, Wis. Adm. Code.
PERCENT FINES
The percentage of a given sample of soil, which passes through a #200 sieve.
PERFORMANCE STANDARD
A narrative or measurable number specifying the minimum acceptable outcome for a facility or practice.
PERMIT
A written authorization made by the Director of Public Works or designee to the applicant to conduct land-disturbing construction activity or to discharge post-construction runoff to waters of the state. No person may conduct land-disturbing activity or discharge post-construction runoff to waters of the state within the Town of Cedarburg without obtaining such permit from the Town indicating that the requirements of this chapter are met, and the owner shall pay the applicable permit fee according to the Annual Fee Schedule as established by the Town Board. The Town's permit application shall require that all costs incurred by the Town or its designee, agents, and/or consultants to properly review the application shall be the responsibility of the applicant who shall timely pay or reimburse the Town of Cedarburg for all engineering, inspection, legal, and administrative costs incurred by the Town in reviewing the application. This includes applications that result in after-the-fact permits.
[Amended 5-5-2021 by Ord. No. 2021-5]
PERMIT ADMINISTRATION FEE
A sum of money paid to the Director of Public Works or designee by the permit applicant for the purpose of recouping the expenses incurred by the authority in administering the permit.
[Amended 5-5-2021 by Ord. No. 2021-5]
PERVIOUS SURFACE
An area that releases as runoff a small portion of the precipitation that falls on it. Lawns, gardens, parks, forests or other similar vegetated areas are examples of surfaces that typically are pervious.
POLLUTANT
Has the meaning given in § 283.01(13), Wis. Stats.
POLLUTION
Has the meaning given in § 281.01(10), Wis. Stats.
POST-CONSTRUCTION SITE
A construction site following the completion of land-disturbing construction activity and final site stabilization.
PRE-DEVELOPMENT CONDITION
The extent and distribution of land cover types present before the initiation of land-disturbing construction activity, assuming that all land uses prior to development activity are managed in an environmentally sound manner.
PREVENTIVE ACTION LIMIT
Has the meaning given in § NR 140.05(17), Wis. Adm. Code.
REDEVELOPMENT
Areas where development is replacing older development.
RESPONSIBLE PARTY
Any entity holding fee title to the property or other person contracted or obligated by other agreement to implement and maintain post-construction stormwater BMPs.
RUNOFF
Stormwater or precipitation, including rain, snow or ice melt, or similar water that moves on the land surface via sheet or channelized flow.
SEPARATE STORM SEWER
A conveyance or system of conveyances, including roads with drainage systems, streets, catch basins, curbs, gutters, ditches, constructed channels or storm drains, which meets all of the following criteria:
A. 
Is designed or used for collecting water or conveying runoff.
B. 
Is not part of a combined sewer system.
C. 
Is not draining to a stormwater treatment device or system.
D. 
Discharges directly or indirectly to waters of the state.
SITE
The entire area included in the legal description of the land on which the land-disturbing construction activity occurred.
STOP-WORK ORDER
An order issued by the Director of Public Works or designee which requires that all construction activity on the site be stopped.
[Amended 5-5-2021 by Ord. No. 2021-5]
STORMWATER MANAGEMENT PLAN
A comprehensive plan designed to reduce the discharge of pollutants from stormwater after the site has under gone final stabilization following completion of the construction activity.
STORMWATER MANAGEMENT SYSTEM PLAN
A comprehensive plan designed to reduce the discharge of runoff and pollutants from hydrologic units on a regional or municipal scale.
TECHNICAL STANDARD
A document that specifies design, predicted performance and operation and maintenance specifications for a material, device or method.
TOP OF THE CHANNEL
An edge, or point on the landscape, landward from the ordinary high-water mark of a surface water of the state, where the slope of the land begins to be less than 12% continually for at least 50 feet. If the slope of the land is 12% or less continually for the initial 50 feet, landward from the ordinary high-water mark, the top of the channel is the ordinary high-water mark.
TR-55
The United States Department of Agriculture, Natural Resources Conservation Service (previously "Soil Conservation Service“), Urban Hydrology for Small Watersheds, Second Edition, Technical Release 55, June 1986.
TYPE II DISTRIBUTION
A rainfall type curve as established in the United States Department of Agriculture, Soil Conservation Service, Technical Paper 149, published 1973. The Type II curve is applicable to all of Wisconsin and represents the most intense storm pattern.
WATERS OF THE STATE
Has the meaning given in § 281.01(18), Wis. Stats.
[Amended 5-5-2021 by Ord. No. 2021-5]
The above and foregoing chapter was duly adopted by the Town Board of Town of Cedarburg on the first day of October 2008, and as amended thereafter.