A.
General. These construction standards shall govern all construction indicated in final submission of subdivisions and site plans with the City, both on private land and on public land. No building permit for a new lot, or development or redevelopment of an existing lot shall be granted unless the street access and construction standards have been approved by the City. Construction not covered by these standards shall be in accordance with recognized good practice such as that contained in the State of New York's Department of Transportation Specifications or recommendations of manufacturers' associations. All such methods not covered by these standards require approval of the City before construction begins.
B.
Private property owners and developers. It is the responsibility of the property owner and/or developer to ensure that all construction conforms to these standards. Correction of defects in construction will be the responsibility of the property owner/developer. The City will not be required to construct or reconstruct a street which does not conform with these standards. However, if the property owner/developer refuses to correct the defect, the City is permitted to correct the defect at the cost of the property owner/developer.
C.
Maintenance and protection of traffic. The owner shall maintain traffic and protect the public from damage to person and property while construction is being performed in any public right-of-way or any private street. Travel shall be maintained over a reasonably smooth traveled way which shall be marked as necessary for the type of street so that a person who has no knowledge of conditions can safely and with a minimum of discomfort and inconvenience, drive or walk over all or any portion of the street. The City shall determine whether one-way or two-way traffic shall be maintained.
D.
Clean up and repair.
(1)
The owner shall clean up all debris or materials left as a result of work by the owner and completely repair damage caused by the owner to any public or private property, including any existing street the owner may have used. Resetting of surveying points and reseeding street areas are included in required repairs.
(2)
This cleanup shall include regular removal of mud and dirt from existing City streets adjoining the owner's project or over which the owner's construction traffic travels on a regular basis. Cleanup shall be as required by construction activity, but may be required at the end of each day as conditions warrant.
E.
Restoration of paved street surfaces. All utilities within streets shall be installed before streets are paved. However, repairs or reconstruction after paving may require pavement restoration which shall be accomplished as follows:
(1)
Backfilling shall be as required for backfill within a street right-of-way. The edge of the pavement shall be cut evenly with a chisel or saw at least one foot beyond the edge of the excavation. Base material and paving equal in thickness and quality to that of the original paving shall be constructed in accordance with the standards for pavement construction. The joint between original pavement and the patch shall be sealed with a crack sealer approved by the City.
(2)
Additionally, construction within existing City streets will require a permit for construction from the City. It will be the responsibility of the owner to comply with all conditions and restrictions set forth in said permit.
F.
Land for public usage. Land which the owner has offered for cession to the City for recreation or open space purposes shall be cleared of all debris, construction shanties or materials belonging to the owner. Earth disturbed by the owner's operations shall be graded and restored to a neat and acceptable condition. This land shall not be used as a dump site.
G.
Construction modifications in field. The City may require construction of a type not contemplated at the time of final review, provided that such requirements are for a higher type of construction. This is to allow for proper construction to meet conditions not known at the time of final review. Such construction changes shall be shown on as-built drawings.